Permit Application Status

PRCOM20182387


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20182387
Building Permit - Commercial
Certificate of Occupancy
PREMIERLIFE REAL ESTATE HOLDING
NEW COMMERCIAL
NEW FIRE STATION
07/26/2018
01/09/2019
03/17/2019
09/22/2020
Locations
Contacts
B DEAN CONSTRUCTION LLC, Address:2401 SW US HIGHWAY 40 STE B, Phone:(816) 795-3733  
MID-STATES HEATING & COOLING, Address:4011 MAIN ST, Phone:(816) 765-7886  
YATES ELECTRIC CO INC, Address:1401 BURLINGTON C, Phone:(816) 421-8343  
CHRIS LEHMAN PLUMBING, Address:16 NW OO COUNTY ROAD, Phone:(660) 422-7876  
WSKF ARCHITECTS INC, Address:110 ARMOUR ROAD, Phone:(816) 300-4101  
PREMIERLIFE REAL ESTATE HOLDING, Address:400 NW MURRAY RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 02/03/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
02/03/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. Life safety must pass before a final occupancy can be scheduled.
Misc
Corrective Action Required
02/03/2020

(Informational Purposes) Update records showing versions 2018 IFC, IBC and NFPA 72 2016.
Sprinkler Plan Review Released for Construction 08/20/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
08/20/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic Test and acceptance testing.
Miscellaneous Correction
Corrective Action Required
08/20/2019

(Verified At Inspection) 4 inch Storz connection for the FDC
Miscellaneous Correction
Corrective Action Required
08/20/2019

(Verified At Inspection) Outside Horn/Strobe for notification. No electric bell
Misc
Corrective Action Required
08/20/2019

(Verified At Inspection) Roll up garage doors will be required to have coverage underneath.
Alarm Plan Review Rejected 06/06/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
06/06/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Action Required) Call (816)969-1300 to schedule testing.
Alarms connected to automatic sprinkler system
Corrective Action Required
06/06/2019

2018 IFC 903.4.2- Alarms. Approved audible and visual devices shall be connected to every automatic sprinkler system. Such sprinkler water-flow alarm devices shall be activated by water flow equivalent to the flow of a single sprinkler of the smallest orifice size installed in the system. Listed alarm notification devices shall be provided on the exterior and interior of the building in an approved location. Where a fire alarm system is installed, actuation of the automatic sprinkler system shall actuate the building fire alarm system. (Informational purposes)
Alarm testing.
Corrective Action Required
06/06/2019

2018 IFC 904.4.2- Alarm testing. Notification appliances, connections to fire alarm systems, and connections to approved supervising stations shall be tested in accordance with this section and Section 907 to verify proper operation. (Informational purposes)
Miscellaneous Correction
Corrective Action Required
06/06/2019

(Action Required) Visible notification appliances in sleeping areas. Eliminate the horns. Visible notification appliance in vestibule. Eliminate the horn. Eliminate strobes in corridors by Capt. bunk#1 and Capt. bunk#2
Misc
Corrective Action Required
06/06/2019

(Action Required) Provide battery calculations
Final Development Plan Review Approved 01/08/2019
Joe Frogge
Special Inspections Review Approved 01/08/2019
Joe Frogge
Licensed Contractors Approved 10/10/2018 01/08/2019
Joe Frogge
LC - General Contractor
Resolved
12/27/2018

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 8/13/18 - Acknowledged in response letter.
LC - MEP Subs
Corrective Action Required
10/03/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 8/13/18 - Acknowledged in response letter.
Fire Plan Review Approved with Conditions 10/10/2018 10/04/2018
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
10/03/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (information purposes) To be deferred Have the fire alarm system contractor provide shop drawings of the fire alarm system to be installed.
Construction documents - Fire protection systems
Corrective Action Required
10/03/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: (information purposes) To be deferred Have the fire sprinkler system contractor provide shop drawings of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
10/03/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances there to shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: (information purposes) Field tests and acceptnace testing of the fire sprinkler, fire alarm, CO monitoring and kitchen hood systems will be required prior to the final occupancy inspection. Contact the Fire Department to schedule testing.
Misc
Corrective Action Required
10/03/2018

Access controlled doors ACTION REQUIRED:(verified at inspection/testing) Access controlled doors shall drop off upon fire alarm activation.
Building Plan Review Approved with Conditions 10/10/2018 10/04/2018
Joe Frogge
Final Development Plan
Resolved
01/08/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 8/13/18 - Acknowledged in response letter. FDP is in "approved" status but is not yet completely processed.
License Tax Application
Corrective Action Required
10/03/2018

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 8/13/18 - Acknowledged in response letter.
Misc
Resolved
01/08/2019

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 8/13/18 - Acknowledged in response letter.
Engineered truss package
Corrective Action Required
10/03/2018

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof truss packages or request deferral. 8/13/18 - Acknowledged in response letter.
Misc
Resolved
10/04/2018

2012 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. 8/13/18 - Response letter refers to an attached report that was not found in the submittal.
Misc
Resolved
10/04/2018

Water meter information not provided. Action required: Provide water meter size and location. 8/13/18 - Unable to locate information on drawings. 10/4/18 - design updated to show 2"wm
Misc
Resolved
10/04/2018

Sand/oil separator information not provided. Action required: Provide sand/oil separator specifications. 8/13/18 - Unable to find information on drawings.
Plumb - Cleanouts - Building sewer 708.3.2
Corrective Action Required
10/03/2018

2012 IPC 708.3.2 Building sewers. Building sewers shall be provided with cleanouts located not more than 100 feet apart measured from the upstream entrance of the cleanout. For building sewers 8 inches and larger, manholes shall be provided and located not more than 200 feet from the junction of the building drain and building sewer, at each change in direction and at intervals of not more than 400 feet apart. Manholes and manhole covers shall be of an approved type. Action required: Additional cleanouts required at waste piping. Required at exit from building at every 100'. 8/13/18 - Acknowledged in response letter. To be field verified.
Bldg - Urinal partitions 1210.3.2
Resolved
10/04/2018

2012 IBC 1210.3.2 – Urinal partitions. Each urinal utilized by the public or employees shall occupy a separate area with walls or partitions to provide privacy. The walls or partitions shall begin at a height not more than 12 inches from and extend not less than 60 inches above the finished floor surface. The walls or partitions shall extend from the wall surface at each side of the urinal not less than 18 inches or to a point not less than 6 inches beyond the outermost front lip of the urinal measured from the finished backwall surface, whichever is greater. (See code section for possible exceptions.) Action required: Provide partitions at urinals. Modify designs at, but not limited to, Toilet Rooms #156 & #122. 8/13/18 - Room 122 approved as-is. Provide locking hardware at door into #156 in order to qualify as single user restroom. 10/4/18 - lock provided
Bldg - Attic access 1209.2
Resolved
10/04/2018

2012 IBC 1209.2 – Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. Clear headroom of not less than 30 inches shall be provided in the attic space at or above the access opening. Action required: Provide access to attic areas. 8/13/18 - Response letter references access panels that we are unable to locate on plans.
Building Plan Review Rejected 09/25/2018 09/18/2018
Joe Frogge
Final Development Plan
Corrective Action Required
09/18/2018

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 8/13/18 - Acknowledged in response letter. FDP is in "approved" status but is not yet completely processed.
License Tax Application
Corrective Action Required
09/18/2018

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 8/13/18 - Acknowledged in response letter.
Misc
Corrective Action Required
09/18/2018

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 8/13/18 - Acknowledged in response letter.
Engineered truss package
Corrective Action Required
09/18/2018

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof truss packages or request deferral. 8/13/18 - Acknowledged in response letter.
Misc
Corrective Action Required
09/18/2018

2012 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. 8/13/18 - Response letter refers to an attached report that was not found in the submittal.
Misc
Corrective Action Required
09/18/2018

Water meter information not provided. Action required: Provide water meter size and location. 8/13/18 - Unable to locate information on drawings.
Misc
Corrective Action Required
09/18/2018

Sand/oil separator information not provided. Action required: Provide sand/oil separator specifications. 8/13/18 - Unable to find information on drawings.
Plumb - Cleanouts - Building sewer 708.3.2
Corrective Action Required
09/18/2018

2012 IPC 708.3.2 Building sewers. Building sewers shall be provided with cleanouts located not more than 100 feet apart measured from the upstream entrance of the cleanout. For building sewers 8 inches and larger, manholes shall be provided and located not more than 200 feet from the junction of the building drain and building sewer, at each change in direction and at intervals of not more than 400 feet apart. Manholes and manhole covers shall be of an approved type. Action required: Additional cleanouts required at waste piping. Required at exit from building at every 100'. 8/13/18 - Acknowledged in response letter. To be field verified.
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Resolved
09/18/2018

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design to provide minimum 18" clearance at latch side of door in Tlt 4 Room #156. 8/13/18 - Unable to find exception in building code that justifies statement that fire stations do not apply to referenced code section.
Bldg - Urinal partitions 1210.3.2
Corrective Action Required
09/18/2018

2012 IBC 1210.3.2 – Urinal partitions. Each urinal utilized by the public or employees shall occupy a separate area with walls or partitions to provide privacy. The walls or partitions shall begin at a height not more than 12 inches from and extend not less than 60 inches above the finished floor surface. The walls or partitions shall extend from the wall surface at each side of the urinal not less than 18 inches or to a point not less than 6 inches beyond the outermost front lip of the urinal measured from the finished backwall surface, whichever is greater. (See code section for possible exceptions.) Action required: Provide partitions at urinals. Modify designs at, but not limited to, Toilet Rooms #156 & #122. 8/13/18 - Room 122 approved as-is. Provide locking hardware at door into #156 in order to qualify as single user restroom.
Accessibility - Water closet clearance width 604.3.1
Resolved
09/18/2018

ICC A117.1-2009 604.3.1 – Clearance width. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. Action required: Modify designs for compliance at, but not limited to, Toilet Rooms #156 & #122. 8/13/18 - Unable to find exception in building code that justifies statement that fire stations do not apply to referenced code section.
Misc
Resolved
09/18/2018

2012 IBC 1107.6.2.2 Group R-2 other than apartment houses, monasteries, and convents. In Group R-2 occupancies, other than apartment houses, monasteries and convents, Accessible units and Type B units shall be provided in accordance with Sections 1107.6.2.2.1 and 1107.6.2.2.2. Actions required: - Provide at least one (1) accessible sleeping unit. - Modify design to show how all other sleeping units will comply as Type B units. 8/13/18 - Unable to find exception in building code that justifies statement that fire stations do not apply to referenced code section.
Misc
Resolved
09/18/2018

ICC A117.1-2009 Section 1004.11.1 Grab Bar and Shower Seat Reinforcement. Reinforcement shall be provided for the future installation of grab bars and shower seats at water closets, bathtubs, and shower compartments. Where walls are located to permit the installation of grab bars and seats complying with Section 604.5 at water closets; grab bars complying with Section 607.4 at bathtubs; and for grab bars and shower seats complying with Sections, 608.3, 608.2.1.3, 608.2.2.3 and 608.2.3.2 at shower compartments; reinforcement shall be provided for the future installation of grab bars and seats complying with those requirements. (see code for additional exceptions) Action required: Provide reinforcement at potential grab bar locations. 8/13/18 - Unable to find exception in building code that justifies statement that fire stations do not apply to referenced code section.
Misc
Resolved
09/18/2018

ICC A117.1-2009 Section 1004.11.3.1.2.2.1 Clearance Width. Clearance around the water closet shall be 48 inches minimum in width, measured perpendicular from the side of the clearance that is 16 inches minimum and 18 inches maximum from the water closet centerline. Action required: Provide minimum 48" clearance at, but not limited to, water closets in toilet rooms #135 & #136. 8/13/18 - Unable to find exception in building code that justifies statement that fire stations do not apply to referenced code section.
Bldg - Attic access 1209.2
Corrective Action Required
09/18/2018

2012 IBC 1209.2 – Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. Clear headroom of not less than 30 inches shall be provided in the attic space at or above the access opening. Action required: Provide access to attic areas. 8/13/18 - Response letter references access panels that we are unable to locate on plans.
Licensed Contractors Rejected 09/18/2018 09/18/2018
Joe Frogge
LC - General Contractor
Corrective Action Required
09/18/2018

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 8/13/18 - Acknowledged in response letter.
LC - MEP Subs
Corrective Action Required
09/18/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 8/13/18 - Acknowledged in response letter.
Fire Plan Review Approved with Conditions 09/25/2018 09/18/2018
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
09/18/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (information purposes) Have the fire alarm system contractor provide shop drawings of the fire alarm system to be installed.
Construction documents - Fire protection systems
Corrective Action Required
09/18/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: (information purposes) Have the fire sprinkler system contractor provide shop drawings of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
09/18/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances there to shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: (information purposes) Field tests and acceptnace testing of the fire sprinkler, fire alarm, CO monitoring and kitchen hood systems will be required prior to the final occupancy inspection. Contact the Fire Department to schedule testing.
Misc
Corrective Action Required
09/18/2018

Access controlled doors ACTION REQUIRED:(verified at inspection/testing) Access cotrolled doors shall drop off upon fire alarm activation.
Building Plan Review Rejected 08/13/2018 08/13/2018
Joe Frogge
Final Development Plan
Corrective Action Required
08/06/2018

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 8/13/18 - Acknowledged in response letter. FDP is in "approved" status but is not yet completely processed.
License Tax Application
Corrective Action Required
08/06/2018

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 8/13/18 - Acknowledged in response letter.
Misc
Corrective Action Required
08/06/2018

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 8/13/18 - Acknowledged in response letter.
Engineered truss package
Corrective Action Required
08/06/2018

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof truss packages or request deferral. 8/13/18 - Acknowledged in response letter.
Misc
Corrective Action Required
08/06/2018

2012 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. 8/13/18 - Response letter refers to an attached report that was not found in the submittal.
Misc
Corrective Action Required
08/06/2018

Water meter information not provided. Action required: Provide water meter size and location. 8/13/18 - Unable to locate information on drawings.
Misc
Corrective Action Required
08/06/2018

Sand/oil separator information not provided. Action required: Provide sand/oil separator specifications. 8/13/18 - Unable to find information on drawings.
Misc
Resolved
08/13/2018

Inadequate information on civil set utility plan. Action required: Specify materials for all sections of waste and water piping.
Plumb - Cleanouts - Building sewer 708.3.2
Corrective Action Required
08/06/2018

2012 IPC 708.3.2 Building sewers. Building sewers shall be provided with cleanouts located not more than 100 feet apart measured from the upstream entrance of the cleanout. For building sewers 8 inches and larger, manholes shall be provided and located not more than 200 feet from the junction of the building drain and building sewer, at each change in direction and at intervals of not more than 400 feet apart. Manholes and manhole covers shall be of an approved type. Action required: Additional cleanouts required at waste piping. Required at exit from building at every 100'. 8/13/18 - Acknowledged in response letter. To be field verified.
Screening - Ground mounted equipment
Resolved
08/13/2018

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section.
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Corrective Action Required
08/06/2018

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design to provide minimum 18" clearance at latch side of door in Tlt 4 Room #156. 8/13/18 - Unable to find exception in building code that justifies statement that fire stations do not apply to referenced code section.
Bldg - Urinal partitions 1210.3.2
Corrective Action Required
08/06/2018

2012 IBC 1210.3.2 – Urinal partitions. Each urinal utilized by the public or employees shall occupy a separate area with walls or partitions to provide privacy. The walls or partitions shall begin at a height not more than 12 inches from and extend not less than 60 inches above the finished floor surface. The walls or partitions shall extend from the wall surface at each side of the urinal not less than 18 inches or to a point not less than 6 inches beyond the outermost front lip of the urinal measured from the finished backwall surface, whichever is greater. (See code section for possible exceptions.) Action required: Provide partitions at urinals. Modify designs at, but not limited to, Toilet Rooms #156 & #122. 8/13/18 - Room 122 approved as-is. Provide locking hardware at door into #156 in order to qualify as single user restroom.
Accessibility - Water closet clearance width 604.3.1
Corrective Action Required
08/06/2018

ICC A117.1-2009 604.3.1 – Clearance width. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. Action required: Modify designs for compliance at, but not limited to, Toilet Rooms #156 & #122. 8/13/18 - Unable to find exception in building code that justifies statement that fire stations do not apply to referenced code section.
Misc
Corrective Action Required
08/06/2018

2012 IBC 1107.6.2.2 Group R-2 other than apartment houses, monasteries, and convents. In Group R-2 occupancies, other than apartment houses, monasteries and convents, Accessible units and Type B units shall be provided in accordance with Sections 1107.6.2.2.1 and 1107.6.2.2.2. Actions required: - Provide at least one (1) accessible sleeping unit. - Modify design to show how all other sleeping units will comply as Type B units. 8/13/18 - Unable to find exception in building code that justifies statement that fire stations do not apply to referenced code section.
Misc
Corrective Action Required
08/06/2018

ICC A117.1-2009 Section 1004.11.1 Grab Bar and Shower Seat Reinforcement. Reinforcement shall be provided for the future installation of grab bars and shower seats at water closets, bathtubs, and shower compartments. Where walls are located to permit the installation of grab bars and seats complying with Section 604.5 at water closets; grab bars complying with Section 607.4 at bathtubs; and for grab bars and shower seats complying with Sections, 608.3, 608.2.1.3, 608.2.2.3 and 608.2.3.2 at shower compartments; reinforcement shall be provided for the future installation of grab bars and seats complying with those requirements. (see code for additional exceptions) Action required: Provide reinforcement at potential grab bar locations. 8/13/18 - Unable to find exception in building code that justifies statement that fire stations do not apply to referenced code section.
Misc
Corrective Action Required
08/06/2018

ICC A117.1-2009 Section 1004.11.3.1.2.2.1 Clearance Width. Clearance around the water closet shall be 48 inches minimum in width, measured perpendicular from the side of the clearance that is 16 inches minimum and 18 inches maximum from the water closet centerline. Action required: Provide minimum 48" clearance at, but not limited to, water closets in toilet rooms #135 & #136. 8/13/18 - Unable to find exception in building code that justifies statement that fire stations do not apply to referenced code section.
Bldg - Attic access 1209.2
Corrective Action Required
08/06/2018

2012 IBC 1209.2 – Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. Clear headroom of not less than 30 inches shall be provided in the attic space at or above the access opening. Action required: Provide access to attic areas. 8/13/18 - Response letter references access panels that we are unable to locate on plans.
Misc
Resolved
08/13/2018

2012 IMC 505.2 Makeup air required. Exhaust hood systems capable of exhausting in excess of 400 cfm shall be provided with makeup air at a rate approximately equal to the exhaust air rate. Such makeup air systems shall be equipped with a means of closure and shall be automatically controlled to start and operate simultaneously with the exhaust system. Action required: Provide makeup air to accommodate air lost from kitchen hood.
Misc
Resolved
08/13/2018

2012 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed. Specify compliant water hammer arrestors.
Licensed Contractors Rejected 09/07/2018 08/13/2018
Joe Frogge
LC - General Contractor
Corrective Action Required
08/06/2018

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 8/13/18 - Acknowledged in response letter.
LC - MEP Subs
Corrective Action Required
08/06/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 8/13/18 - Acknowledged in response letter.
Fire Plan Review Approved with Conditions 08/13/2018 08/07/2018
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
08/06/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (information purposes) Have the fire alarm system contractor provide shop drawings of the fire alarm system to be installed.
Construction documents - Fire protection systems
Corrective Action Required
08/06/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: (information purposes) Have the fire sprinkler system contractor provide shop drawings of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
08/06/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances there to shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: (information purposes) Field tests and acceptnace testing of the fire sprinkler, fire alarm, CO monitoring and kitchen hood systems will be required prior to the final occupancy inspection. Contact the Fire Department to schedule testing.
Misc
Resolved
08/07/2018

Door swing ACTION REQUIRED: Corridor doors 127A and 115 are marked as egress doors. [B] 1008.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy
Misc
Resolved
08/07/2018

Encroachment (doors) Storage closet 105 doors ACTION REQUIRED: Storage Closet 105 doors obstruct the egress path. [B] 1005.7.1 Doors. Doors, when fully opened, shall not reduce the required width by more than 7 inches (178mm). Doors in any position shall not reduce the required width by more than one-half.
Misc
Corrective Action Required
08/07/2018

Access controlled doors ACTION REQUIRED:(verified at inspection/testing) Access cotrolled doors shall drop off upon fire alarm activation.
Misc
Resolved
08/07/2018

Emergency Illumnation required for exterior stairs ACTION REQUIRED: [B] 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. [B] 1006.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits.
Building Plan Review Rejected 08/09/2018 08/01/2018
Joe Frogge
Final Development Plan
Corrective Action Required
08/01/2018

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
08/01/2018

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
08/01/2018

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Engineered truss package
Corrective Action Required
08/01/2018

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof truss packages or request deferral.
Misc
Corrective Action Required
08/01/2018

2012 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
Misc
Corrective Action Required
08/01/2018

Water meter information not provided. Action required: Provide water meter size and location.
Misc
Corrective Action Required
08/01/2018

Sand/oil separator information not provided. Action required: Provide sand/oil separator specifications.
Misc
Corrective Action Required
08/01/2018

Inadequate information on civil set utility plan. Action required: Specify materials for all sections of waste and water piping.
Plumb - Cleanouts - Building sewer 708.3.2
Corrective Action Required
08/01/2018

2012 IPC 708.3.2 Building sewers. Building sewers shall be provided with cleanouts located not more than 100 feet apart measured from the upstream entrance of the cleanout. For building sewers 8 inches and larger, manholes shall be provided and located not more than 200 feet from the junction of the building drain and building sewer, at each change in direction and at intervals of not more than 400 feet apart. Manholes and manhole covers shall be of an approved type. Action required: Additional cleanouts required at waste piping. Required at exit from building at every 100'.
Screening - Ground mounted equipment
Corrective Action Required
08/01/2018

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section.
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Corrective Action Required
08/01/2018

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design to provide minimum 18" clearance at latch side of door in Tlt 4 Room #156.
Bldg - Urinal partitions 1210.3.2
Corrective Action Required
08/01/2018

2012 IBC 1210.3.2 – Urinal partitions. Each urinal utilized by the public or employees shall occupy a separate area with walls or partitions to provide privacy. The walls or partitions shall begin at a height not more than 12 inches from and extend not less than 60 inches above the finished floor surface. The walls or partitions shall extend from the wall surface at each side of the urinal not less than 18 inches or to a point not less than 6 inches beyond the outermost front lip of the urinal measured from the finished backwall surface, whichever is greater. (See code section for possible exceptions.) Action required: Provide partitions at urinals. Modify designs at, but not limited to, Toilet Rooms #156 & #122.
Accessibility - Water closet clearance width 604.3.1
Corrective Action Required
08/01/2018

ICC A117.1-2009 604.3.1 – Clearance width. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. Action required: Modify designs for compliance at, but not limited to, Toilet Rooms #156 & #122.
Misc
Corrective Action Required
08/01/2018

2012 IBC 1107.6.2.2 Group R-2 other than apartment houses, monasteries, and convents. In Group R-2 occupancies, other than apartment houses, monasteries and convents, Accessible units and Type B units shall be provided in accordance with Sections 1107.6.2.2.1 and 1107.6.2.2.2. Actions required: - Provide at least one (1) accessible sleeping unit. - Modify design to show how all other sleeping units will comply as Type B units.
Misc
Corrective Action Required
08/01/2018

ICC A117.1-2009 Section 1004.11.1 Grab Bar and Shower Seat Reinforcement. Reinforcement shall be provided for the future installation of grab bars and shower seats at water closets, bathtubs, and shower compartments. Where walls are located to permit the installation of grab bars and seats complying with Section 604.5 at water closets; grab bars complying with Section 607.4 at bathtubs; and for grab bars and shower seats complying with Sections, 608.3, 608.2.1.3, 608.2.2.3 and 608.2.3.2 at shower compartments; reinforcement shall be provided for the future installation of grab bars and seats complying with those requirements. (see code for additional exceptions) Action required: Provide reinforcement at potential grab bar locations.
Misc
Corrective Action Required
08/01/2018

ICC A117.1-2009 Section 1004.11.3.1.2.2.1 Clearance Width. Clearance around the water closet shall be 48 inches minimum in width, measured perpendicular from the side of the clearance that is 16 inches minimum and 18 inches maximum from the water closet centerline. Action required: Provide minimum 48" clearance at, but not limited to, water closets in toilet rooms #135 & #136.
Bldg - Attic access 1209.2
Corrective Action Required
08/01/2018

2012 IBC 1209.2 – Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. Clear headroom of not less than 30 inches shall be provided in the attic space at or above the access opening. Action required: Provide access to attic areas.
Misc
Corrective Action Required
08/01/2018

2012 IMC 505.2 Makeup air required. Exhaust hood systems capable of exhausting in excess of 400 cfm shall be provided with makeup air at a rate approximately equal to the exhaust air rate. Such makeup air systems shall be equipped with a means of closure and shall be automatically controlled to start and operate simultaneously with the exhaust system. Action required: Provide makeup air to accommodate air lost from kitchen hood.
Misc
Corrective Action Required
08/01/2018

2012 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed. Specify compliant water hammer arrestors.
Fire Plan Review Rejected 08/09/2018 07/31/2018
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
07/31/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (information purposes) Have the fire alarm system contractor provide shop drawings of the fire alarm system to be installed.
Construction documents - Fire protection systems
Corrective Action Required
07/31/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: (information purposes) Have the fire sprinkler system contractor provide shop drawings of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
07/31/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances there to shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: (information purposes) Field tests and acceptnace testing of the fire sprinkler, fire alarm, CO monitoring and kitchen hood systems will be required prior to the final occupancy inspection. Contact the Fire Department to schedule testing.
Misc
Corrective Action Required
07/31/2018

Door swing ACTION REQUIRED: Corridor doors 127A and 115 are marked as egress doors. [B] 1008.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy
Misc
Corrective Action Required
07/31/2018

Encroachment (doors) Storage closet 105 doors ACTION REQUIRED: Storage Closet 105 doors obstruct the egress path. [B] 1005.7.1 Doors. Doors, when fully opened, shall not reduce the required width by more than 7 inches (178mm). Doors in any position shall not reduce the required width by more than one-half.
Misc
Corrective Action Required
07/31/2018

Access controlled doors ACTION REQUIRED: Access cotrolled doors shall drop off upon fire alarm activation. [B] 1008.1.9.8 Access-controlled egress doors. The entrance doors in a means of egress in buildings with an occupancy in Groups A, B, E, I-2, M, R-1 or R-2, and entrance doors to tenant spaces in occupancies in Groups A, B, E, I-2, M, R-1 or R-2, are permitted to be equipped with an approved entrance and egress access control system, listed in accordance with UL 294, which shall be installed in accordance with all of the following criteria: 1. A sensor shall be provided on the egress side arranged to detect an occupant approaching the doors. The doors shall be arranged to unlock by a signal from or loss of power to the sensor. 2. Loss of power to that part of the access control system which locks the doors shall automatically unlock the doors. 3. The doors shall be arranged to unlock from a manual unlocking device located 40 inches to 48 inches (1016 mm to 1219 mm) vertically above the floor and within 5 feet (1524 mm) of the secured doors. Ready access shall be provided to the manual unlocking device and the device shall be clearly identified by a sign that reads “PUSH TO EXIT.” When operated, the manual unlocking device shall result in direct interruption of power to the lock—independent of the access control system electronics—and the doors shall remain unlocked for a minimum of 30 seconds. 4. Activation of the building fire alarm system, if provided, shall automatically unlock the doors, and the doors shall remain unlocked until the fire alarm system has been reset. 5. Activation of the building automatic sprinkler or fire detection system, if provided, shall automatically unlock the doors. The doors shall remain unlocked until the fire alarm system has been reset. 6. Entrance doors in buildings with an occupancy in Group A, B, E or M shall not be secured from the egress side during periods that the building is open to the general public
Misc
Corrective Action Required
07/31/2018

Emergency Illumnation required for exterior stairs ACTION REQUIRED: [B] 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. [B] 1006.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits.
Licensed Contractors Rejected 07/26/2018 07/31/2018
Joe Frogge
LC - General Contractor
Corrective Action Required
07/31/2018

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
07/31/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $19,000.00 $19,000.00 Paid 01/08/2019
8331507-Sewer Connection Fee $1,440.00 $1,440.00 Paid 01/08/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid Not payable online 01/08/2019
8331401-Water Tap Fee $22,738.00 $22,738.00 Paid 01/08/2019
8350015-Water Meter Fee $2,307.98 $2,307.98 Paid 01/08/2019
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid


$100.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 4/23/2019 4/23/2019 04/23/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/23/2019
9 LINE C-H WITH UFER GROUND
Footing Inspection - Commercial Partial 4/24/2019 (1:00) 4/24/2019 04/24/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/23/2019
9 LINE C-H WITH UFER GROUND 8 LINE F-G
Footing Inspection - Commercial Partial 4/25/2019 (11:30) 4/25/2019 04/25/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/24/2019
9 LINE C-H WITH UFER GROUND 8 LINE F-G 8 LINE C-F;G-H
Footing Inspection - Commercial Partial 4/26/2019 4/26/2019 04/26/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/25/2019
9 LINE C-H WITH UFER GROUND 8 LINE F-G 8 LINE C-F;G-H; B&F EAST TO 8 30FT west footing from middle of bay 3 to middle of bay 6
Footing Inspection - Commercial Partial 5/6/2019 5/6/2019 05/06/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/26/2019
9 LINE C-H WITH UFER GROUND 8 LINE F-G 8 LINE C-F;G-H; B&F EAST TO 8 30FT WEST FOOTING FROM CENTER OF BAY #3 TO MIDDLE OF BAY #6.
THE FOLLOWING AREAS ARE APPROVED
Resolved
05/09/2019
WEST FOOTING FROM CENTER OF BAY #3 TO MIDDLE OF BAY #6.
Footing Inspection - Commercial Partial 5/9/2019 (1:00) 5/9/2019 05/09/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/06/2019
9 LINE C-H WITH UFER GROUND 8 LINE F-G 8 LINE C-F;G-H; B&F EAST TO 8 30FT D LINE 1-5 ; 1 LINE E.5 -D.5
Footing Inspection - Commercial Partial 5/10/2019 (1:00) 5/10/2019 05/10/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/09/2019
9 LINE C-H WITH UFER GROUND 8 LINE F-G 8 LINE C-F;G-H; B&F EAST TO 8 30FT D LINE 1-5 ; 1 LINE E.5 -D.5-B.5 5 LINE B-D
Footing Inspection - Commercial Partial 5/13/2019 5/13/2019 at 2:45 PM 05/13/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/10/2019
9 LINE C-H WITH UFER GROUND 8 LINE F-G 8 LINE C-F;G-H; B&F EAST TO 8 30FT D LINE 1-5 ; 1 LINE E.5 -D.5-B.5 5 LINE B-D INTERIOR PIERS- 8 MARKER ON PLANS-SEE S1.01
Footing Inspection - Commercial Partial 5/14/2019 (1:00) 5/14/2019 05/14/2019
Underslab Plumbing Inspection - Commercial Partial 5/16/2019 05/16/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/16/2019
UNDER-SLAB: -WEST END EXCEPT WATER ROOM; -MAIN TRUNK LINE EAST ACROSS VEHICLE BAYS TO SEPERATION WALL.
Underslab Plumbing Inspection - Commercial Partial 5/30/2019 5/30/2019 05/30/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/16/2019
UNDER-SLAB: -WEST END EXCEPT WATER ROOM; -MAIN TRUNK LINE EAST ACROSS VEHICLE BAYS TO SEPERATION WALL. -SANDLINE -BATH 102,122
Underslab Plumbing Inspection - Commercial Partial 6/10/2019 6/10/2019 06/10/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/30/2019
UNDER-SLAB: -WEST END EXCEPT WATER ROOM; -MAIN TRUNK LINE EAST ACROSS VEHICLE BAYS TO SEPERATION WALL. -SANDLINE -BATH 102,122,104,137,138,133,143. main (5 line) corridor 127.
Underslab Plumbing Inspection - Commercial Partial 6/12/2019 6/12/2019 06/12/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/10/2019
UNDER-SLAB: -WEST END EXCEPT WATER ROOM; -MAIN TRUNK LINE EAST ACROSS VEHICLE BAYS TO SEPERATION WALL. -SANDLINE -BATH 102,122,104,137,138,133,143. main (5 line) corridor 127. center baths ,
Underslab Plumbing Inspection - Commercial Partial 6/13/2019 at 9:35 AM 06/13/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/12/2019
UNDER-SLAB: -WEST END EXCEPT WATER ROOM; -MAIN TRUNK LINE EAST ACROSS VEHICLE BAYS TO SEPERATION WALL. -SANDLINE -BATH 102,122,104,137,138,133,143,146,118,121,126,129, 133,110, 149,
Underslab Plumbing Inspection - Commercial Passed 6/19/2019 6/19/2019 06/19/2019
THE FOLLOWING AREAS ARE APPROVED
Resolved
06/19/2019
UNDER-SLAB: -WEST END EXCEPT WATER ROOM; -MAIN TRUNK LINE EAST ACROSS VEHICLE BAYS TO SEPERATION WALL. -SANDLINE -BATH 102,122,104,137,138,133,143,146,118,121,126,129, 133,110,
Footing Inspection - Commercial Partial 7/29/2019 7/30/2019 07/30/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/30/2019
9 LINE C-H WITH UFER GROUND 8 LINE F-G 8 LINE C-F;G-H; B&F EAST TO 8 30FT D LINE 1-5 ; 1 LINE E.5 -D.5-B.5 5 LINE B-D INTERIOR PIERS- 8 MARKER ON PLANS-SEE S1.01 trash encloser
Footing Inspection - Commercial Partial 8/2/2019 (1:00) 8/2/2019 08/02/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/30/2019
9 LINE C-H WITH UFER GROUND 8 LINE F-G 8 LINE C-F;G-H; B&F EAST TO 8 30FT D LINE 1-5 ; 1 LINE E.5 -D.5-B.5 5 LINE B-D INTERIOR PIERS- 8 MARKER ON PLANS-SEE S1.01 2- front entrance piers trash encloser
Underslab Plumbing Inspection - Commercial Partial 8/9/2019 8/9/2019 08/09/2019
Misc
Corrective Action Required
08/09/2019
Partial vehicle bays electrcial and drains
Suspended Slab Inspection Passed 8/28/2019 08/28/2019
In-wall Inspection Partial 6/26/2019 9/26/2019 09/26/2019
Misc
Corrective Action Required
09/26/2019
west of garage partial to top ofwall on CMU block
Rated Assembly Inspection Partial 2/27/2020 2/27/2020 02/27/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/27/2020
1HOUR SEPARATION WALL BETWEEN SLEEPING ROOMS- TOP OUT TO ROOF DECK DOWN TO CEILING HEIGHT. OK TO INSULATE AND ROCK BOTH SIDES DOWN TO CEILING HEIGHTS. ONE HAS BEEN INSTALLED TO THIS POINT
In-wall Inspection Partial 2/27/2020 2/27/2020 02/27/2020
Misc
Corrective Action Required
09/26/2019
west of garage partial to top ofwall on CMU block
FIRST FLOOR
Corrective Action Required
02/27/2020
BUNK KITCHEN AREA- TOP OF 1HR FIRE WALL PARTIAL INSPECTION FOR ROCK ONLY, NO LOWER WALLS INSPECTED TO THIS POINT
In-wall Inspection Partial 3/4/2020 3/5/2020 03/05/2020
Misc
Corrective Action Required
02/27/2020
west of garage partial to top ofwall on CMU block living quarters : ok to insulate exterior walls, need to inspect 2 gas lines and Captins office for eletrcial.
FIRST FLOOR
Corrective Action Required
02/27/2020
BUNK KITCHEN AREA- TOP OF 1HR FIRE WALL PARTIAL INSPECTION FOR ROCK ONLY, NO LOWER WALLS INSPECTED TO THIS POINT
Underground Electrical Inspection - Commercial Partial 3/5/2020 3/5/2020 03/05/2020
Misc
Corrective Action Required
03/05/2020
Front monument sign conduit out 30ft to building. 2 pole lights.
In-wall Inspection Partial 3/6/2020 03/06/2020
Misc
Corrective Action Required
03/05/2020
west of garage partial to top ofwall on CMU block living quarters : exterior walls ok to insulate
FIRST FLOOR
Corrective Action Required
03/05/2020
BUNK KITCHEN AREA- TOP OF 1HR FIRE WALL PARTIAL INSPECTION FOR ROCK ONLY, NO LOWER WALLS INSPECTED TO THIS POINT
Piers/Caissons Inspection - Commercial Partial 3/6/2020 03/06/2020
Misc
Corrective Action Required
03/06/2020
LIGHT POLE BASE: 2 EAST SIDE, REAR LOT, WEST REAR LOT. OK TO POUR WHEN REBAR IS LIFTED AND BOTTOM IS CLEANED OUT.
Rated Assembly Inspection Not Ready 3/4/2020 3/11/2020 03/11/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/27/2020
1HOUR SEPARATION WALL BETWEEN SLEEPING ROOMS- TOP OUT TO ROOF DECK DOWN TO CEILING HEIGHT. OK TO INSULATE AND ROCK BOTH SIDES DOWN TO CEILING HEIGHTS. ONE HAS BEEN INSTALLED TO THIS POINT
Misc
Corrective Action Required
03/11/2020
not ready - installing sheet rock without approval. installing mud and tape at fire wall without fire caulk 1st. no wall rough complete on interior., no above ceiling inspection performed. removed rock from 1 room for inspection. One side wall rock not allowed.
All Rough Inspection - Commercial Failed 3/11/2020 03/11/2020
Misc
Corrective Action Required
03/11/2020
NOTE: rocking walls without approval. interior walls not inspected, only exterior for insulation. electrcial incomplete for wall rough . ONE SIDE ROCK NOT ALLOWED
All Rough Inspection - Commercial Partial 3/13/2020 3/13/2020 03/13/2020
Misc
Corrective Action Required
03/11/2020
WALL ROUGH IN LIVING AREA AND BUNK ROOMS.
Rated Assembly Inspection Partial 3/13/2020 03/13/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/11/2020
1HOUR SEPARATION WALL BETWEEN SLEEPING ROOMS- TOP OUT TO ROOF DECK DOWN TO CEILING HEIGHT. OK TO INSULATE AND ROCK BOTH SIDES DOWN TO CEILING HEIGHTS. --ABOVE TRUSS HEIGHT-- FIREWALLS AROUND BUNK ROOMS OK TO MUD AND TAP, 5 AREAS NEED RE-INSPECTED. OK TO SPRAY ROOF DECK INSULATION TO WALL.
Misc
Resolved
03/13/2020
not ready - installing sheet rock without approval. installing mud and tape at fire wall without fire caulk 1st. no wall rough complete on interior., no above ceiling inspection performed. removed rock from 1 room for inspection. One side wall rock not allowed.
Above Ceiling Inspection Partial 3/16/2020 3/16/2020 03/16/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/16/2020
rooms approved for top rock of roof truss. ; 101-05,115-118;
Rated Assembly Inspection Partial 3/16/2020 3/16/2020 03/16/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/13/2020
1HOUR SEPARATION WALL BETWEEN SLEEPING ROOMS- TOP OUT TO ROOF DECK DOWN TO CEILING HEIGHT. OK TO INSULATE AND ROCK BOTH SIDES DOWN TO CEILING HEIGHTS. --ABOVE TRUSS HEIGHT--OK TO COVER. OK TO SPRAY ROOF DECK INSULATION TO WALL.
Gas Piping Inspection - Commercial Partial 3/18/2020 3/18/2020 03/18/2020
Misc
Informational
03/18/2020
Gas line living quarters approved capped off at truck bays
Above Ceiling Inspection Not Ready 3/20/2020 3/20/2020 03/20/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/16/2020
rooms approved for top rock of roof truss. ; 101-05,115-118;
Above Ceiling Inspection Partial 3/23/2020 3/23/2020 03/23/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/20/2020
rooms approved for top rock of roof truss. ; 101-05,115-118; Above hard lids (attic) living quarters approved 3/23/20
Gas Piping Inspection - Commercial Passed 3/24/2020 03/24/2020
Misc
Resolved
03/24/2020
Gas line living quarters approved capped off at truck bays
Gas Service Inspection - Commercial Passed 3/24/2020 3/24/2020 at 2:20 PM 03/24/2020
Rough Electrical Inspection - Commercial Partial 3/27/2020 3/27/2020 03/27/2020
Informational
03/27/2020
- apparatus bays & soffit lighting OK
Underground Plumbing Inspection - Commercial Partial 3/30/2020 3/30/2020 03/30/2020
Misc
Informational
03/30/2020
UNDER SLAB GAS PIPING TO GRILL ON EAST EXTERIOR. INSTALLING TRACER WIRE IN PROGRESS
Above Ceiling Inspection Failed 4/16/2020 4/16/2020 04/16/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/23/2020
rooms approved for top rock of roof truss. ; 101-05,115-118; Above hard lids (attic) living quarters approved 3/23/20 HARDCEILING: FIRE CAULK ALL PENETRATIONS AT FIRE WALL LOCATIONS WHERE HARD LID CONNECT.
Above Ceiling Inspection Failed 4/21/2020 4/21/2020 04/21/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/16/2020
rooms approved for top rock of roof truss. ; 101-05,115-118; Above hard lids (attic) living quarters approved 3/23/20 HARDCEILING: FIRE CAULK ALL PENETRATIONS AT FIRE WALL LOCATIONS WHERE HARD LID CONNECT. COMPLETE PENETRATIONS, HVAC, GAS LINE IN KITCHEN NOT DROPPED.
Above Ceiling Inspection Partial 4/23/2020 4/23/2020 04/23/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/21/2020
rooms approved for top rock of roof truss. ; 101-05,115-118; Above hard lids (attic) living quarters approved 3/23/20 HARDCEILING: all complete except kitchen area for gas line
Gas Piping Inspection - Commercial Partial 4/28/2020 04/28/2020
Misc
Corrective Action Required
04/28/2020
gas piping- above ceiling, truck bays to exterior, under patio area all tested. remaining is under hard ceiing in kitchen- will need to be tested when complete.
Above Ceiling Inspection Partial 4/27/2020 4/28/2020 04/28/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/23/2020
HARD CEILING COMPLETE
Above Ceiling Inspection Partial 5/1/2020 5/1/2020 05/01/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/28/2020
HARD CEILING COMPLETE EAST SIDE HARD CEIING WEST, WORK OUT NORTH TO WATER & ELECT ROOM.
Gas Piping Inspection - Commercial Passed 5/4/2020 5/4/2020 05/04/2020
Misc
Resolved
05/04/2020
gas piping- above ceiling, truck bays to exterior, under patio area all tested. remaining is under hard ceiing in kitchen- will need to be tested when complete. PASSED 5/4/20
Above Ceiling Inspection Partial 5/4/2020 5/4/2020 05/04/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/01/2020
HARD CEILING COMPLETE EAST SIDE HARD CEIING WEST, WORK OUT NORTH TO WATER & ELECT ROOM. 5/4/20 KITCHEN AREA
Piers/Caissons Inspection - Commercial Partial 5/6/2020 (1:00) 5/6/2020 05/06/2020
Misc
Corrective Action Required
03/06/2020
LIGHT POLE BASE: 2 EAST SIDE, REAR LOT, WEST REAR LOT. OK TO POUR WHEN REBAR IS LIFTED AND BOTTOM IS CLEANED OUT. -- 3 DRIVE AT OVERHEAD DOORS / GROUND ROD REAR DOORS -
Electrical Service Inspection Partial 5/8/2020 5/8/2020 05/08/2020
Misc
Informational
05/08/2020
MAIN SERVCE- ATS1;MDP1 INSPECTED- OK TO RELEASE FROM MDP1-P1-P1A,P2,P2A ,GENERATOR ALL PENDING.
Underground Electrical Inspection - Commercial Partial 3/6/2020 5/8/2020 05/08/2020
Misc
Corrective Action Required
03/05/2020
Front monument sign conduit out 30ft to building. 2 pole lights 2 light poles on east side of drive
Piers/Caissons Inspection - Commercial Passed 5/12/2020 (1:30) 5/12/2020 05/12/2020
Misc
Resolved
05/12/2020
LIGHT POLE BASE: 2 EAST SIDE, REAR LOT, WEST REAR LOT. OK TO POUR WHEN REBAR IS LIFTED AND BOTTOM IS CLEANED OUT. -- 3 DRIVE AT OVERHEAD DOORS / GROUND ROD REAR DOORS -
Sprinkler - Hydrostatic Test Passed 5/14/2020 05/14/2020
Above Ceiling Inspection Partial 5/15/2020 5/15/2020 05/15/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/04/2020
HARD CEILING COMPLETE EAST SIDE HARD CEIING WEST, WORK OUT NORTH TO WATER & ELECT ROOM. 5/4/20 KITCHEN AREA; tile ares: apparatus bay
Above Ceiling Inspection Partial 6/16/2020 6/16/2020 06/16/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/15/2020
HARD CEILING COMPLETE EAST SIDE HARD CEIING WEST, WORK OUT NORTH TO WATER & ELECT ROOM. 5/4/20 KITCHEN AREA; tile ares: apparatus bay
Misc
Corrective Action Required
06/16/2020
# 108 SHIFT CAPT FIRE CAULKING # 118 KITCHEN OPEN BOX RWAR WALL # 123 CORRIDOR OPEN BOX # 124 LAUNDRY LIGHT FIXTURE
Above Ceiling Inspection Partial 6/18/2020 6/18/2020 06/18/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/16/2020
HARD CEILING COMPLETE EAST SIDE HARD CEIING WEST, WORK OUT NORTH TO WATER & ELECT ROOM. 5/4/20 KITCHEN AREA; tile ares: apparatus bay
Misc
Corrective Action Required
06/16/2020
# 118 KITCHEN OPEN BOX ABOVE HOOD
Above Ceiling Inspection Passed 6/22/2020 6/22/2020 06/22/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/18/2020
HARD CEILING COMPLETE EAST SIDE HARD CEIING WEST, WORK OUT NORTH TO WATER & ELECT ROOM. 5/4/20 KITCHEN AREA; tile ares: apparatus bay
Misc
Resolved
06/22/2020
Alarm Test Passed 6/29/2020 06/29/2020
Sprinkler - Flow Test Passed 6/29/2020 06/29/2020
Verify Final Inspection (Final) Complete 06/30/2020
Footing Inspection - Commercial Passed 07/02/2020
THE FOLLOWING AREAS ARE APPROVED
Resolved
07/02/2020
9 LINE C-H WITH UFER GROUND 8 LINE F-G 8 LINE C-F;G-H; B&F EAST TO 8 30FT D LINE 1-5 ; 1 LINE E.5 -D.5-B.5 5 LINE B-D INTERIOR PIERS- 8 MARKER ON PLANS-SEE S1.01 2- front entrance piers trash encloser
Underground Electrical Inspection - Commercial Passed 07/02/2020
Misc
Resolved
07/02/2020
Front monument sign conduit out 30ft to building. 2 pole lights 2 light poles on east side of drive
All Rough Inspection - Commercial Passed 07/02/2020
Misc
Resolved
07/02/2020
WALL ROUGH IN LIVING AREA AND BUNK ROOMS.
In-wall Inspection Passed 07/02/2020
Misc
Resolved
07/02/2020
west of garage partial to top ofwall on CMU block living quarters : exterior walls ok to insulate
FIRST FLOOR
Resolved
07/02/2020
BUNK KITCHEN AREA- TOP OF 1HR FIRE WALL PARTIAL INSPECTION FOR ROCK ONLY, NO LOWER WALLS INSPECTED TO THIS POINT
Rated Assembly Inspection Passed 07/02/2020
THE FOLLOWING AREAS ARE APPROVED
Resolved
07/02/2020
1HOUR SEPARATION WALL BETWEEN SLEEPING ROOMS- TOP OUT TO ROOF DECK DOWN TO CEILING HEIGHT. OK TO INSULATE AND ROCK BOTH SIDES DOWN TO CEILING HEIGHTS. --ABOVE TRUSS HEIGHT--OK TO COVER. OK TO SPRAY ROOF DECK INSULATION TO WALL.
Underground Plumbing Inspection - Commercial Passed 07/02/2020
Misc
Informational
03/30/2020
UNDER SLAB GAS PIPING TO GRILL ON EAST EXTERIOR. INSTALLING TRACER WIRE IN PROGRESS
Occupancy Inspection - Fire Failed 7/2/2020 7/2/2020 07/02/2020
Occupancy Inspection - Planning Temporary C of O 7/2/2020 07/02/2020
Corrective Action Required
07/02/2020
There are AC condensing units on the south and west sides of the building that are not screened per UDO requirements. All ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened.
Occupancy Inspection - Codes Commercial Failed 7/2/2020 7/2/2020 07/02/2020
Misc
Corrective Action Required
07/02/2020
MAIN SERVCE- ATS1;MDP1 INSPECTED- OK TO RELEASE FROM MDP1-P1-P1A,P2,P2A ,GENERATOR ALL PENDING.
Misc
Corrective Action Required
07/02/2020
: COMPLETE BELOW FOR TCO : - AIR COMPRESSOR ROOM LABEL DISCONNECT SOUTH WALL - - GFCI LEFT OF SINK IN WASH OUT ROOM - - WEST EXTERIOR STORAGE DATA 4X4 BOX COVER PLATE - - INSULATE CONDINSATE LONE WEST - - LABEL ALL DISCONNECTS/RTU- - LABEL ALL PANELS AT FACP ROOM - - OPEN 4 X 4 BOX SOUTH WALL- - OPEN KNOCKOUT 4X4 BOX OVER DOOR - -CENTER SE BUNK ROOM CAN LIGHTS - - SPARK RINGS BATH SINK OUTLETS- - CLAP MC CABEL AT EACH WATER HEATER WITHIN 12" OF BOX - -DISCONNECT FOR WATER HEEATERS OVER 6' 6" - - PAINT ALL EXTERIOR GAS PIPING - - PROVIDE HAMMER ARRESTORS WASHING MACHINES & DISH WASHER - - GFCI WASHING MACHINES - - INSTALL MISSING SWITCH PLATE, RECEPTACLE COVERS THROUGHOUT - - PROVIDE BUBBLE COVERS FOR EXTERIOR GFCI'S- - EXTERIOR DOOR HARDWARE - - PROVIDE TEMPERED GLASS INSERTS IN TWO HALLWAY DOORS - - RECEPTACLE COVERS SPARK RINGS KITCHEN COUNTER - - INSPECT SUB PANELS - - INSPECT GENERATOR - - OPEN BOXES TRASH ENCLOSURE - - FIRE ALARM PANEL (FIRE) - - SPRINKLERS (FIRE) - : COMPLETE BELOW FOR C OF O : - INSULATE PIPES UNDER ADA SINKS - - SEAL GAS LINE PENETRATION PATIO - -INSTALL COOKTOP KITCHEN - - INSTALL DISHWASHER KITCHEN - - INSTALL FIRE EXTINGUISHER CABINETS -
Occupancy Inspection - Water Utilities Passed 7/2/2020 07/08/2020
Occupancy Inspection - Codes Commercial Temporary C of O 7/10/2020 7/10/2020 07/10/2020
Misc
Resolved
07/10/2020
MAIN SERVCE- ATS1;MDP1 INSPECTED- OK TO RELEASE FROM MDP1-P1-P1A,P2,P2A ,GENERATOR ALL PENDING.
Misc
Corrective Action Required
07/02/2020
-INSTALL COOKTOP KITCHEN - - INSTALL DISHWASHER KITCHEN with hammer arrestor. - INSTALL FIRE EXTINGUISHER CABINETS -
Occupancy Inspection - Planning Temporary C of O 07/10/2020
Corrective Action Required
07/10/2020
There are AC condensing units on the south and west sides of the building that are not screened per UDO requirements. All ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened.
Occupancy Inspection - Fire Passed 7/10/2020 7/10/2020 07/10/2020
Occupancy Inspection - Codes Commercial Failed 7/23/2020 7/23/2020 07/23/2020
Misc
Corrective Action Required
07/10/2020
- INSTALL DISHWASHER KITCHEN with hammer arrestor. - - DISHWASHER DISCHARGE PIPE OR TUBING SHALL RISE TO UNDERSIDE OF THE COUNTER AND BE FASTENED OR OTHERWISE HELD IN THAT POSITION BEFORE CONNECTING TO THE HEAD OF FOOD WASTE DISPOSER OR WYE IN SINK TAILPIECE -
Occupancy Inspection - Codes Commercial Failed 7/27/2020 7/27/2020 07/27/2020
Misc
Corrective Action Required
07/23/2020
- CODES COMPLETE PENDING OTHERS DEPTS -
Occupancy Inspection - Planning Passed 07/29/2020
Occupancy Inspection - Codes Commercial Full C of O 09/22/2020
Misc
Resolved
09/22/2020
- CODES COMPLETE PENDING OTHERS DEPTS -
Documents & Images
Date Uploaded File Type Document Name
07/31/2018 Letter Fire Building Plan Review
08/01/2018 Letter Codes P/R Corrections Document
08/07/2018 Letter Fire Building Plan Review
08/13/2018 Letter Codes P/R Corrections Document
09/18/2018 Letter Codes P/R Corrections Document
10/04/2018 Letter Fire Building Plan Review
01/08/2019 Receipt Receipt for transaction: 2019-000078
01/08/2019 special inspections
01/08/2019 Letter Codes Plan Review Conditions
01/09/2019 Letter Codes Building Permit
03/21/2019 Engineer Report/Study Fire Station #3 Geo Report
04/23/2019 Letter INSPECTION SUMMARY
04/24/2019 Letter INSPECTION SUMMARY
04/25/2019 Letter INSPECTION SUMMARY
04/26/2019 Letter INSPECTION SUMMARY
05/06/2019 Letter INSPECTION SUMMARY
05/09/2019 Letter INSPECTION SUMMARY
05/10/2019 Letter INSPECTION SUMMARY
05/13/2019 Letter INSPECTION SUMMARY
05/14/2019 Letter INSPECTION SUMMARY
05/16/2019 Letter INSPECTION SUMMARY
05/30/2019 Letter INSPECTION SUMMARY
06/06/2019 Letter Fire (Alarm) Plan Review Notice.pdf
06/10/2019 Letter INSPECTION SUMMARY
06/13/2019 Letter INSPECTION SUMMARY
07/30/2019 Letter INSPECTION SUMMARY
08/02/2019 Letter INSPECTION SUMMARY
08/09/2019 Letter INSPECTION SUMMARY
08/20/2019 Letter Fire (Sprinkler) Plan Review
08/28/2019 Letter INSPECTION SUMMARY
09/26/2019 Letter INSPECTION SUMMARY
02/03/2020 Letter Fire (Alarm) Plan Review Notice
02/27/2020 Letter INSPECTION SUMMARY
02/27/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/11/2020 Letter INSPECTION SUMMARY
03/11/2020 Letter INSPECTION SUMMARY
03/13/2020 Letter INSPECTION SUMMARY
03/13/2020 Letter INSPECTION SUMMARY
03/16/2020 Letter INSPECTION SUMMARY
03/16/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/23/2020 Letter INSPECTION SUMMARY
03/24/2020 Letter INSPECTION SUMMARY
03/24/2020 Letter INSPECTION SUMMARY
03/27/2020 Letter INSPECTION SUMMARY
03/30/2020 Letter INSPECTION SUMMARY
04/16/2020 Letter INSPECTION SUMMARY
04/21/2020 Letter INSPECTION SUMMARY
04/23/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter .pdf
04/28/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
05/01/2020 Letter INSPECTION SUMMARY
05/04/2020 Letter INSPECTION SUMMARY
05/04/2020 Letter INSPECTION SUMMARY
05/06/2020 Letter INSPECTION SUMMARY
05/08/2020 Letter INSPECTION SUMMARY
05/08/2020 Letter INSPECTION SUMMARY
05/12/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/18/2020 Approved Plans Approved -17016TR016 - city
06/12/2020 Drawing RE LSFS #3 - screening on south property line
06/16/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter INSPECTION SUMMARY
07/06/2020 Letter INSPECTION SUMMARY
07/10/2020 Letter Codes Temporary Certificate of Occupancy
07/23/2020 Letter INSPECTION SUMMARY
09/22/2020 Letter Field Certificate of Occupancy
02/03/2022 Code Mod Request 04.21.2020 Fire Station No 3 Operations-Code Modification Request PLAN REVIEW SIGNED
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home