Fire Plan Review
|
Approved with Conditions
|
06/28/2018
|
06/21/2018
|
|
Joe Frogge
|
|
Address numbers required
Corrective Action Required
2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
ACTION REQUIRED:(VERIFIED AT INSPECTION)
All doors shall be addressed and be readable from the roadway
|
|
Misc
Corrective Action Required
Door operations
ACTION REQUIRED:(VERIIFED AT INSPECTION)
No keyed locks on the egress side of an exit
|
|
|
Building Plan Review
|
Approved with Conditions
|
06/28/2018
|
06/21/2018
|
|
Joe Frogge
|
|
License Tax Application
Corrective Action Required
A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Action required: Comment is for informational purposes.
|
|
Misc
Insufficient information to complete review.
Provide the following:
-
- Pipe material schedule
6/12/18 - specify NG piping
- HVAC design
6/12/18 - provide design for combustion air intake and ventilation at water heater. Also, water heater specified is 6' tall - how can this be installed above mop sink?
-
|
|
|
Licensed Contractors
|
Approved
|
06/21/2018
|
06/21/2018
|
|
Joe Frogge
|
|
|
Building Plan Review
|
Rejected
|
06/18/2018
|
06/12/2018
|
|
Joe Frogge
|
|
License Tax Application
Corrective Action Required
A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Action required: Comment is for informational purposes.
|
|
Plumb - Minimum number of fixtures 403.1
2012 IPC 403.1 – Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. types of occupancies not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code.
Action required: Modify design to provide mop sink which is required due to floor material.
6/12/18 - mop sink provided
|
|
Misc
Corrective Action Required
Insufficient information to complete review.
Provide the following:
-
- Pipe material schedule
6/12/18 - specify NG piping
- HVAC design
6/12/18 - provide design for combustion air intake and ventilation at water heater. Also, water heater specified is 6' tall - how can this be installed above mop sink?
-
|
|
Misc
2011 NEC 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Areas. Wiring in patient care areas shall comply with 517.13(A) and (B).
(A) Wiring methods. All branch circuits serving patient care areas shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, or metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118.
(B) Insulated Equipment Grounding Conductor.
(1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is installed with the branch circuit conductors in the wiring methods as provided in 517.13(A).
1. The grounding terminals of all receptacles.
2. Metal Boxes and enclosures containing receptacles.
3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts.
(refer code for exceptions)
(2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122.
Action required: Comment is for informational purposes. Consultation rooms appear configured for possible patient care which would not be allowed without compliance to this electrical code section.
|
|
|
Licensed Contractors
|
Approved
|
06/18/2018
|
06/12/2018
|
|
Joe Frogge
|
|
|
Fire Plan Review
|
Approved with Conditions
|
06/18/2018
|
06/11/2018
|
|
Joe Dir
|
|
Address numbers required
Corrective Action Required
2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
ACTION REQUIRED:(VERIFIED AT INSPECTION)
All doors shall be addressed and be readable from the roadway
|
|
Misc
Corrective Action Required
Door operations
ACTION REQUIRED:(VERIIFED AT INSPECTION)
No keyed locks on the egress side of an exit
|
|
|
Licensed Contractors
|
Rejected
|
05/02/2018
|
05/08/2018
|
|
Joe Frogge
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Mechanical contractor. (each new office requires supply and return air - seems unlikely that existing system will work without modifications)
|
|
|
Building Plan Review
|
Rejected
|
05/14/2018
|
05/08/2018
|
|
Joe Frogge
|
|
License Tax Application
Corrective Action Required
A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Action required: Comment is for informational purposes.
|
|
Plumb - Minimum number of fixtures 403.1
Corrective Action Required
2012 IPC 403.1 – Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. types of occupancies not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code.
Action required: Modify design to provide mop sink which is required due to floor material.
|
|
Misc
Corrective Action Required
Insufficient information to complete review.
Provide the following:
- Electrical specifications
- Pipe material schedule
- HVAC design
- Clarify use of drain pumps. (gravity drains must be used if available - even if you must cut into concrete)
|
|
Misc
Corrective Action Required
2011 NEC 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Areas. Wiring in patient care areas shall comply with 517.13(A) and (B).
(A) Wiring methods. All branch circuits serving patient care areas shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, or metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118.
(B) Insulated Equipment Grounding Conductor.
(1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is installed with the branch circuit conductors in the wiring methods as provided in 517.13(A).
1. The grounding terminals of all receptacles.
2. Metal Boxes and enclosures containing receptacles.
3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts.
(refer code for exceptions)
(2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122.
Action required: Comment is for informational purposes. Consultation rooms appear configured for possible patient care which would not be allowed without compliance to this electrical code section.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
05/14/2018
|
05/08/2018
|
|
Joe Dir
|
|
Address numbers required
Corrective Action Required
2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
ACTION REQUIRED:
All doors shall be addressed and be readable from the roadway
|
|
Misc
Corrective Action Required
Door operations
ACTION REQUIRED:No keyed locks on the egress side of an exit
[B] 1008.1.9 Door operations. Except as specifically permitted
by this section egress doors shall be readily openable
from the egress side without the use of a key or
special knowledge or effort.
|
|
|