Summary
PRCOM20172523
Building Permit - Commercial
Certificate of Occupancy
PARROT PROPERTIES INC
NEW MULTI-FAMILY
MERIDIAN AT VIEW HIGH - BUILDING #11 NEW 2 STORY APARTMENT BUILDING WITH PARKING GARAGE BENEATH FOUNDATION PERMIT - PRCOM20181906
07/24/2017
12/06/2019
01/25/2021
Locations
Contacts
CITYSCAPE CONSTRUCTION VIEW HIGH LLC, Address:10 W CARMEL DR STE 200, Phone:(317) 574-1600 Ext:100  
STANDARD HEATING & COOLING TOO LLC, Address:2006 E PRAIRIE CIRCLE , Phone:(913) 782-5409  
STANDARD ELECTRIC TOO LLC, Address:2006 E PRAIRIE CIRCLE, Phone:(913) 782-5409  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
SGN+A ARCHITECTS, Address:315 W PONCE DE LEON AVE #755, Phone:(404) 373-7370  
LATIMER SOMMERS & ASSOCIATES PA, Address:3639 SW SUMMERFIELD DR STE A, Phone:(785) 233-3232  
PARROT PROPERTIES INC, Address:11303 VIEW HIGH DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 08/07/2017 10/29/2020
Michael Weissenbach
Sprinkler Plan Review Released for Construction 10/29/2020
Michael Weissenbach
Alarm Plan Review Released for Construction 10/29/2020
Michael Weissenbach
Licensed Contractors Approved 07/25/2018 06/19/2018
Joe Frogge
Final Development Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Building Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Special Inspections Review Approved 08/24/2017
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Multi-Family $10,486.73 $10,486.73 Paid 12/06/2019
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 12/06/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 12/12/2019 12/12/2019 at 1:55 PM 12/12/2019
Sewer Service Inspection Passed 12/12/2019 (2:30) 12/12/2019 12/12/2019
Misc
Informational
12/12/2019
Service line was connected to sanitary lateral using hard back Frenco. RP 12-12-19
Footing Inspection - Commercial Partial 1/28/2020 01/28/2020
Misc
Corrective Action Required
01/28/2020
Bldg #11 exterior footing
Miscellaneous Inspection Partial 2/6/2020 2/6/2020 02/06/2020
Misc
Informational
02/06/2020
Bldg # 9 grade beam
Footing Inspection - Commercial Partial 2/11/2020 2/11/2020 02/11/2020
Misc
Informational
02/11/2020
Stem wall @grade beam
Footing Inspection - Commercial Partial 3/30/2020 (9:00) 3/30/2020 03/30/2020
Misc
Informational
02/11/2020
Stem wall @grade beam : 3/30/20 perimeter footing upper level :
Underslab Plumbing Inspection - Commercial Passed 4/13/2020 4/13/2020 04/13/2020
Misc
Informational
04/13/2020
BLDG # 11 UPPER LEVEL UNDERSLAB (4) GAUGES STEADY AT 5 PSI
All Rough Inspection - Commercial Failed 7/8/2020 7/8/2020 07/08/2020
THIRD FLOOR
Corrective Action Required
07/08/2020
- 3RD FLOOR ROUGH PASS -
All Rough Inspection - Commercial Partial 7/13/2020 7/13/2020 07/13/2020
THIRD FLOOR
Resolved
07/13/2020
- 3RD FLOOR ROUGH PASS -
Sprinkler - Hydrostatic Test Passed 7/23/2020 07/23/2020
All Rough Inspection - Commercial Passed 7/23/2020 7/23/2020 07/23/2020
THIRD FLOOR
Corrective Action Required
07/23/2020
- BLDG # 11 - - 3RD FLOOR ROUGH PASS -
SECOND FLOOR
Corrective Action Required
07/23/2020
- BLDG # 11 - - 2ND FLOOR ROUGH PASS -
FIRST FLOOR
Corrective Action Required
07/23/2020
- BLDG # 11 - - 1ST FLOOR ROUGH PASS -
Rated Assembly Inspection Failed 7/31/2020 7/31/2020 08/04/2020
THIRD FLOOR
Informational
08/11/2020
- RC APPROVED -
SECOND FLOOR
Informational
08/11/2020
- RC APPROVED -
FIRST FLOOR
Informational
08/11/2020
- RC APPROVED -
Rated Assembly Inspection Failed 8/4/2020 8/4/2020 08/04/2020
Misc
Corrective Action Required
08/04/2020
- RC CHANNEL MISSING SCREWS - - SOUTH STAIRWAY AT RISER PIPE - - NORTH STAIRWAY AT LVL - - G-2 NEAR OVERHEAD DOOR - - G-12 5 ROWS IN MIDDLE -
Electrical Service Inspection Passed 8/4/2020 8/4/2020 08/04/2020
Misc
Informational
08/04/2020
- SOUTH END - - 12 UNITS, ONE HOUSE METER. - - NORTH END - - 12 UNITS, ONE HOUSE METER. -
Rated Assembly Inspection Partial 8/11/2020 8/11/2020 08/11/2020
FIRST FLOOR
Informational
08/11/2020
- RC APPROVED -
SECOND FLOOR
Corrective Action Required
08/11/2020
- RC APPROVED -
THIRD FLOOR
Corrective Action Required
08/11/2020
- RC APPROVED - - 3RD FLOOR UNIT OK TO TAPE -
Rated Assembly Inspection Partial 8/19/2020 8/19/2020 08/19/2020
FIRST FLOOR
Informational
08/11/2020
- RC APPROVED -
SECOND FLOOR
Corrective Action Required
08/11/2020
- RC APPROVED - - 2ND FLOOR UNITS ONLY OK TO TAPE -
THIRD FLOOR
Corrective Action Required
08/11/2020
- RC APPROVED - - 3RD FLOOR UNITS ONLY OK TO TAPE -
Rated Assembly Inspection Passed 8/27/2020 8/27/2020 08/27/2020
FIRST FLOOR
Informational
08/19/2020
- RC APPROVED - - CORRIDORS & GARAGES OK TO TAPE -
SECOND FLOOR
Informational
08/27/2020
- RC APPROVED - - 2ND FLOOR UNITS ONLY OK TO TAPE - - 2ND FLOOR CORRIDORS OK TO TAPE -
THIRD FLOOR
Informational
08/27/2020
- RC APPROVED - - 3RD FLOOR UNITS ONLY OK TO TAPE - - 3RD FLOOR CORRIDORS OK TO TAPE -
Alarm Test Passed 10/29/2020 10/29/2020
Sprinkler - Flow Test Passed 10/29/2020 10/29/2020
Occupancy Inspection - Water Utilities Passed 11/3/2020 11/03/2020
Occupancy Inspection - Fire Partial 11/5/2020 11/5/2020 11/05/2020
Water Service Inspection Passed 11/10/2020 11/10/2020
Sewer Service Inspection Passed 11/10/2020 11/10/2020
Occupancy Inspection - Engineering Passed 11/10/2020 11/10/2020
Misc
Informational
11/10/2020
We are working on a punch list for the off-site infrastructure, this will be the last occupancy to be given until all the punch list has been taken care of.
Occupancy Inspection - Codes Commercial Temporary C of O 11/10/2020 11/10/2020 11/10/2020
Misc
Corrective Action Required
11/10/2020
-Complete exterior façade/siding -complete exterior HVAC electrical installation -Provide tamper resistant caps at condensing units -Identify white insulated conductors used as current carrying conductors, HVAC power supply at disconnect TCO valid though 12/10/2020
Occupancy Inspection - Fire Passed 11/10/2020 11/10/2020 11/10/2020
Occupancy Inspection - Planning Passed 11/11/2020 11/11/2020
Footing Inspection - Commercial Passed 3/30/2020 01/13/2021
Misc
Resolved
01/13/2021
Stem wall @grade beam : 3/30/20 perimeter footing upper level :
Occupancy Inspection - Codes Commercial Temporary C of O 1/13/2021 1/13/2021 01/13/2021
Misc
Corrective Action Required
11/10/2020
-Provide tamper resistant caps at condensing unit for apartments #203 #306 10 day TCO extension
Occupancy Inspection - Codes Commercial Full C of O 1/25/2021 1/25/2021 01/25/2021
Misc
Resolved
01/25/2021
-Provide tamper resistant caps at condensing unit for apartments #203 #306 10 day TCO extension
Documents & Images
Date Uploaded File Type Document Name
10/16/2017 Meridian Site Map
12/06/2019 Letter DS Building Permit
12/12/2019 Letter INSPECTION SUMMARY
12/12/2019 E0B368CC-3047-40EA-B9ED-0FC39FF53A91
12/12/2019 Letter INSPECTION SUMMARY
01/28/2020 Letter INSPECTION SUMMARY
02/06/2020 Letter INSPECTION SUMMARY
02/11/2020 Letter INSPECTION SUMMARY
03/30/2020 Letter INSPECTION SUMMARY
04/13/2020 Letter INSPECTION SUMMARY
07/08/2020 Letter INSPECTION SUMMARY
07/13/2020 Letter INSPECTION SUMMARY
07/23/2020 Letter INSPECTION SUMMARY
07/31/2020 Letter INSPECTION SUMMARY
08/04/2020 Letter INSPECTION SUMMARY
08/04/2020 Letter INSPECTION SUMMARY
08/11/2020 Letter INSPECTION SUMMARY
08/19/2020 Letter INSPECTION SUMMARY
08/27/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter Codes Temporary Certificate of Occupancy
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter Codes Plan Review Conditions
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter Fire Loss Reduction Form
11/25/2020 Letter Fire Loss Reduction Form
01/13/2021 Letter INSPECTION SUMMARY
01/13/2021 Letter Codes Temporary Certificate of Occupancy
01/13/2021 Letter INSPECTION SUMMARY
01/25/2021 Letter Codes Final Certificate of Occupancy
01/25/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home