Permit Application Status

PRCOM20171410


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20171410
Building Permit - Commercial
Certificate of Occupancy
UNITY REALTY LLC
NEW COMMERCIAL
NEW EYE CARE FACILITY
05/04/2017
08/29/2017
11/12/2017
05/08/2018
Locations
Contacts
SRKO LLC, Address:24 NW CHIPMAN RD, Phone:(816) 365-0100  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
WESTCO ELECTRICAL SERVICES, Address:P O BOX 93, Phone:(816) 343-8779  
A & E PLUMBING CONTRACTORS LLC, Address:15917 W 82ND PL, Phone:(913) 231-8639  
GUY GRONBERG ARCHITECTS, Address:113 SE 3RD ST, Phone:(816) 524-0878  
UNITY REALTY LLC, Address:1901 NW BLUE PKWY, Phone:(816) 251-3593  
MENC LLC, Address:1621 NW BLUE PARKWAY  
Reviews
Review Type Outcome Est. Completion Date Completed
Final Development Plan Review Approved 08/29/2017
Joe Frogge
Licensed Contractors Approved 05/30/2017 08/24/2017
Development Center
LC - General Contractor
Corrective Action Required
05/30/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
05/30/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 06/06/2017 05/31/2017
Joe Dir
Misc
Resolved
05/31/2017

Site plan ACTION REQUIRED: Provide a civil plans showing the site plan, with the locationof fire hydrants. 507.5.1 Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet (122 m) from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
Misc
Resolved
05/31/2017

Door hardware ACTION REQUIRED: provide information listing the exit door hardware.
Misc
Corrective Action Required
05/30/2017

Door hardware ACTION REQUIRED: No keyed locks on the egress side of an exit B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
Misc
Resolved
05/31/2017

panic hardware ACTION REQUIRED:(verified at inspection) [B] 1008.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware.
Address numbers required
Corrective Action Required
05/30/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Addressing shall be readable from the roadway.
Portable fire extinguishers - general
Corrective Action Required
05/30/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide three 2A-10BC (rated at 5 pound) frie extinguishers. Fire extinguishers to be mounted close to each exit. on a normal path of travel.
Building Plan Review Approved with Conditions 06/06/2017 05/30/2017
Joe Frogge
License Tax Application
Corrective Action Required
05/30/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 5/30/17 - acknowledged
Final Development Plan
Resolved
08/29/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 5/30/17 - acknowledged
Misc
Resolved
05/30/2017

2012 IPC 708.3.2 Building sewers. Building sewers shall be provided with cleanouts located not more than 100 feet apart measured from the upstream entrance of the cleanout. For building sewers 8 inches and larger, manholes shall be provided and located not more than 200 feet from the junction of the building drain and building sewer, at each change in direction and at intervals of not more than 400 feet apart. Manholes and manhole covers shall be of an approved type. Action required: Provide additional cleanouts in yard to comply. 5/30/17 - acknowledged - to be addressed under FDP submittal
Misc
Resolved
05/30/2017

Size of water meter not provided. Action required: Specify size of water meter. (FYI- 2" water meter is $24,671.75) 5/30/17 - acknowledged - to be addressed under FDP submittal
Engineered truss package
Corrective Action Required
05/30/2017

Copies of the engineered truss package were not provided at the time of permit application. Action required: Truss package is deferred to construction. Approved truss package must be on site for inspections. 5/30/17 - deferred to construction
Misc
Resolved
05/30/2017

2012 IBC 718.4 Draftstopping in attics. In combustible construction, draftstopping shall be installed to subdivide attic spaces and concealed roof spaces in the locations prescribed in Sections 718.4.2 and 718.4.3. Ventilation of concealed roof spaces shall be maintained in accordance with Section 1203.2 Action required: Specify draftstopping materials and locations.
Bldg - Attic access 1209.2
Resolved
05/30/2017

2012 IBC 1209.2 – Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. Clear headroom of not less than 30 inches shall be provided in the attic space at or above the access opening. Action required: Provide attic access. (both sides of draftstopping)
Screening - Ground mounted equipment
Resolved
05/30/2017

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section. 5/30/17 - acknowledged - to be addressed under FDP submittal
Misc
Resolved
05/30/2017

2012 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision ins made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Provide heat source to protect water piping in Utility A38.
Mech - Materials within plenums 602.2.1
Resolved
05/30/2017

2012 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: PVC piping not allowed in plenums. (ref: furnace flue/combustion air)
Building Plan Review Rejected 05/18/2017 05/16/2017
Joe Frogge
License Tax Application
Corrective Action Required
05/16/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Final Development Plan
Corrective Action Required
05/16/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
05/16/2017

2012 IPC 708.3.2 Building sewers. Building sewers shall be provided with cleanouts located not more than 100 feet apart measured from the upstream entrance of the cleanout. For building sewers 8 inches and larger, manholes shall be provided and located not more than 200 feet from the junction of the building drain and building sewer, at each change in direction and at intervals of not more than 400 feet apart. Manholes and manhole covers shall be of an approved type. Action required: Provide additional cleanouts in yard to comply.
Misc
Corrective Action Required
05/16/2017

Size of water meter not provided. Action required: Specify size of water meter. (FYI- 2" water meter is $24,671.75)
Engineered truss package
Corrective Action Required
05/16/2017

Copies of the engineered truss package were not provided at the time of permit application. Action required: Truss package is deferred to construction. Approved truss package must be on site for inspections.
Misc
Corrective Action Required
05/16/2017

2012 IBC 718.4 Draftstopping in attics. In combustible construction, draftstopping shall be installed to subdivide attic spaces and concealed roof spaces in the locations prescribed in Sections 718.4.2 and 718.4.3. Ventilation of concealed roof spaces shall be maintained in accordance with Section 1203.2 Action required: Specify draftstopping materials and locations.
Bldg - Attic access 1209.2
Corrective Action Required
05/16/2017

2012 IBC 1209.2 – Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. Clear headroom of not less than 30 inches shall be provided in the attic space at or above the access opening. Action required: Provide attic access. (both sides of draftstopping)
Screening - Ground mounted equipment
Corrective Action Required
05/16/2017

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section.
Misc
Corrective Action Required
05/16/2017

2012 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision ins made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Provide heat source to protect water piping in Utility A38.
Mech - Materials within plenums 602.2.1
Corrective Action Required
05/16/2017

2012 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: PVC piping not allowed in plenums. (ref: furnace flue/combustion air)
Licensed Contractors Rejected 05/04/2017 05/16/2017
Joe Frogge
LC - General Contractor
Corrective Action Required
05/16/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
05/16/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 05/18/2017 05/09/2017
Joe Dir
Misc
Corrective Action Required
05/09/2017

Site plan ACTION REQUIRED: Provide a civil plans showing the site plan, with the locationof fire hydrants. 507.5.1 Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet (122 m) from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
Misc
Corrective Action Required
05/09/2017

Door hardware ACTION REQUIRED: provide information listing the exit door hardware.
Misc
Corrective Action Required
05/09/2017

Door hardware ACTION REQUIRED: No keyed locks on the egress side of an exit B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
Misc
Corrective Action Required
05/09/2017

panic hardware ACTION REQUIRED:(verified at inspection) [B] 1008.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware.
Address numbers required
Corrective Action Required
05/09/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Addressing shall be readable from the roadway.
Portable fire extinguishers - general
Corrective Action Required
05/09/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide three 2A-10BC (rated at 5 pound) frie extinguishers. Fire extinguishers to be mounted close to each exit. on a normal path of travel.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $3,610.00 $3,610.00 Paid 08/24/2017
8331507-Sewer Connection Fee $810.00 $810.00 Paid 08/24/2017
8331401-Water Tap Fee $11,143.00 $11,143.00 Paid 08/24/2017
8350015-Water Meter Fee $2,781.53 $2,781.53 Paid 08/24/2017
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 08/24/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 9/20/2017 (1:30) 9/20/2017 at 1:15 PM 09/20/2017
Misc
Partial Correction
09/20/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 4/C TO 4/A TO 2/A TO 2/A.7;
Footing Inspection - Commercial Passed 9/21/2017 (2:00) 9/21/2017 at 1:50 AM 09/21/2017
Misc
Resolved
09/21/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 4/C TO 4/A TO 2/A TO 2/A.7;
Underslab Plumbing Inspection - Commercial Passed 9/29/2017 9/29/2017 at 2:40 PM 09/29/2017
Underslab Electrical Inspection - Commercial Partial 10/4/2017 10/4/2017 at 11:25 AM 10/04/2017
Misc
Corrective Action Required
10/04/2017
ALL THE UNDERSLAB CIRCUITS TO THE PATIENT CARE ROOMS MUST BE METAL RACEWAYS (NEC517.13. ALSO CANNOT INSTALL GREEN MC IN UNDERSLAB RACEWAYS EITHER). FLOOR IS OK TO POUR, BUT THE COMPLIANT CIRCUITS WILL HAVE TO BE INSTALLED ABOVE FLOOR.
Rough Framing Inspection - Commercial Partial 11/2/2017 11/2/2017 at 3:50 PM 11/02/2017
Rough Framing Inspection - Commercial Partial 11/3/2017 11/3/2017 at 3:25 PM 11/03/2017
Misc
Partial Correction
11/03/2017
NO ISSUES FOUND ON ROOF FRAMING. SILL PLATE ANCHORAGE IS COMPLETED. HOLD-DOWNS TO BE TORQUED AFTER EPOXY SET-UP.
Underground Electrical Inspection - Commercial Partial 11/21/2017 at 3:15 PM 11/21/2017
Misc
Partial Correction
11/21/2017
OK TO COVER WHEN READY TRENCHED CONDUIT FIR SITE LIGHTING
In-wall Inspection Passed 11/27/2017 at 1:40 AM 11/27/2017
Footing Inspection - Commercial Passed 11/28/2017 (1:00) 11/28/2017 at 1:10 PM 11/28/2017
Underground Electrical Inspection - Commercial Partial 11/28/2017 at 1:25 PM 11/28/2017
Misc
Partial Correction
11/21/2017
OK TO COVER WHEN READY TRENCHED CONDUIT FIR SITE LIGHTING
Misc
Partial Correction
11/28/2017
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: [#3;
Gas Piping Inspection - Commercial Passed 12/4/2017 at 7:40 AM 12/04/2017
Gas Service Inspection - Commercial Passed 12/1/2017 12/4/2017 at 8:00 AM 12/04/2017
Underground Electrical Inspection - Commercial Partial 12/8/2017 12/8/2017 at 9:10 AM 12/08/2017
Misc
Partial Correction
11/28/2017
OK TO COVER WHEN READY TRENCHED CONDUIT FIR SITE LIGHTING
Misc
Partial Correction
11/28/2017
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #3;[#1, 2
Underground Electrical Inspection - Commercial Partial 12/11/2017 12/11/2017 at 8:55 AM 12/11/2017
Misc
Partial Correction
12/08/2017
OK TO COVER WHEN READY TRENCHED CONDUIT FIR SITE LIGHTING
Misc
Partial Correction
12/08/2017
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #3;[#1, 2
Partial Correction
12/11/2017
SECONDARY COUNDUITS FROM LIGHT POLE ON BLUE PKWY TO BUILDING APPROVED.
Electrical Service Inspection Passed 12/20/2017 12/20/2017 at 11:10 AM 12/20/2017
Above Ceiling Inspection Failed 1/10/2018 1/10/2018 at 8:15 AM 01/10/2018
Misc
Corrective Action Required
01/10/2018
REMOVE ANY COMBUSTIBLE MATERIAL (E.G. WOOD HANGER CLEATS) AND REPLACE WITH NON-COMBUSTIBLE MATERIAL.
Misc
Corrective Action Required
01/10/2018
REMOVE ALL TEMPORARY ELECTRICAL WIRING.
Misc
Corrective Action Required
01/10/2018
COMPLETE HVAC DUCTWORK AND DIFFUSSERS. SMACNA / AIR DIFUSSION COUNCIL / MANUFACTURER'S INSTRUCTIONS > INSTALLATION OF HVAC FLEXIBLE DUCT AND INSULATION: SEE INSTRUCTION SHEET IN EACH BOX OF MATERIAL. CLAMPS & TAPING OF INNER AND OUTER LAYER MUST BE PER INSTRUCTIONS. NON-METALLIC CLAMPS OK ONLY WITH BEADED FITTINGS.
Misc
Corrective Action Required
01/10/2018
ENSURE ALL ELECTRICAL BOXES ARE MADE UP AND CLOSED.
Misc
Corrective Action Required
01/10/2018
CITY-STAMPED PERMIT DRAWING SET MUST BE ON SITE FOR RE-INSPCETION. PLACE NO TILE PRIOR TO RE-INSPECTION AND APPROVAL.
Above Ceiling Inspection Partial 1/16/2018 1/16/2018 at 1:50 PM 01/16/2018
Misc
Resolved
01/16/2018
REMOVE ANY COMBUSTIBLE MATERIAL (E.G. WOOD HANGER CLEATS) AND REPLACE WITH NON-COMBUSTIBLE MATERIAL.
Misc
Resolved
01/16/2018
REMOVE ALL TEMPORARY ELECTRICAL WIRING.
Misc
Resolved
01/16/2018
COMPLETE HVAC DUCTWORK AND DIFFUSSERS. SMACNA / AIR DIFUSSION COUNCIL / MANUFACTURER'S INSTRUCTIONS > INSTALLATION OF HVAC FLEXIBLE DUCT AND INSULATION: SEE INSTRUCTION SHEET IN EACH BOX OF MATERIAL. CLAMPS & TAPING OF INNER AND OUTER LAYER MUST BE PER INSTRUCTIONS. NON-METALLIC CLAMPS OK ONLY WITH BEADED FITTINGS.
Misc
Resolved
01/16/2018
ENSURE ALL ELECTRICAL BOXES ARE MADE UP AND CLOSED.
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS THROUGHOUT EXCEPT AT RECEPTION/WAITING WHERE LUMINAIRES HAVE YET TO BE INSTALLED.
Above Ceiling Inspection Passed 1/24/2018 1/24/2018 at 9:35 AM 01/24/2018
Misc
Resolved
01/24/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS THROUGHOUT EXCEPT AT RECEPTION/WAITING WHERE LUMINAIRES HAVE YET TO BE INSTALLED.
Rough Framing Inspection - Commercial Passed 11/3/2017 01/29/2018
Misc
Resolved
01/29/2018
NO ISSUES FOUND ON ROOF FRAMING. SILL PLATE ANCHORAGE IS COMPLETED. HOLD-DOWNS TO BE TORQUED AFTER EPOXY SET-UP.
Underslab Electrical Inspection - Commercial Passed 11/21/2017 10/4/2017 01/29/2018
Misc
Resolved
01/29/2018
ALL THE UNDERSLAB CIRCUITS TO THE PATIENT CARE ROOMS MUST BE METAL RACEWAYS (NEC517.13. ALSO CANNOT INSTALL GREEN MC IN UNDERSLAB RACEWAYS EITHER). FLOOR IS OK TO POUR, BUT THE COMPLIANT CIRCUITS WILL HAVE TO BE INSTALLED ABOVE FLOOR.
Underground Electrical Inspection - Commercial Passed 12/11/2017 01/29/2018
Misc
Resolved
01/29/2018
OK TO COVER WHEN READY TRENCHED CONDUIT FIR SITE LIGHTING
Misc
Resolved
01/29/2018
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #3;[#1, 2|SECONDARY COUNDUITS FROM LIGHT POLE ON BLUE PKWY TO BUILDING APPROVED.
Miscellaneous Inspection Partial 1/30/2018 at 8:40 AM 01/30/2018
Miscellaneous Inspection Partial 2/1/2018 at 10:25 AM 02/01/2018
Miscellaneous Inspection Partial 2/5/2018 at 11:15 AM 02/05/2018
Occupancy Inspection - Fire Passed 2/20/2018 02/20/2018
Occupancy Inspection - Codes Commercial Partial 2/20/2018 2/20/2018 at 2:00 PM 02/20/2018
Misc
Partial Correction
02/20/2018
NO CODES ISSUES FOUND ON OCCUPANCY INSPECTION OF BUILDING. OCCUPANCY STATUS: OK TO SET UP FOR BUSINESS. STAFFING, TRAINING, FIXTURING, STOCKING OK. NO PUBLIC/CUSTOMERS/PATIENTS PRIOR TO APPROVAL. EXTERIOR AND SITE TO BE INSPECTED WHEN WEATHER IS CONDUCIVE. - LSFD HAS NO ISSUES - LS SITE CIVIL HAS NO ISSUES ON BUILDING AREA - VERIFICATION PENDING FROM LS WATER UTILITIES - LS PLANNING TO INSPECT WHEN WEATHER ALLOWS
Occupancy Inspection - Planning Temporary C of O 02/27/2018
Corrective Action Required
02/27/2018
Complete landscaping per the approved plan.
Corrective Action Required
02/27/2018
Inspection of wallpack lighting required by Planning after installation to verify compliance with UDO.
Miscellaneous Inspection Passed 2/8/2018 at 8:30 AM 02/27/2018
Occupancy Inspection - Codes Commercial Temporary C of O 2/27/2018 at 4:15 PM 02/27/2018
Misc
Partial Correction
02/20/2018
NO CODES ISSUES FOUND ON OCCUPANCY INSPECTION OF BUILDING. EXTERIOR AND FINISH SITEWORK TO BE INSPECTED WHEN WEATHER AND CONDITIONS ARE CONDUCIVE. - LSFD HAS NO ISSUES - LS SITE CIVIL HAS NO ISSUES ON BUILDING AREA - VERIFICATION PENDING FROM LS WATER UTILITIES - LS PLANNING TO INSPECT WHEN WORK COMPLETED
Occupancy Inspection - Water Utilities Passed 03/22/2018
Footing Inspection - Commercial Passed 4/30/2018 4/30/2018 at 1:00 PM 04/30/2018
Occupancy Inspection - Planning Passed 05/08/2018
Occupancy Inspection - Codes Commercial Full C of O 5/8/2018 at 11:45 AM 05/08/2018
Misc
Resolved
05/08/2018
NO CODES ISSUES FOUND ON OCCUPANCY INSPECTION OF BUILDING. EXTERIOR AND FINISH SITEWORK TO BE INSPECTED WHEN WEATHER AND CONDITIONS ARE CONDUCIVE. - LSFD HAS NO ISSUES - LS SITE CIVIL HAS NO ISSUES ON BUILDING AREA - VERIFICATION PENDING FROM LS WATER UTILITIES - LS PLANNING TO INSPECT WHEN WORK COMPLETED
Driveway Inspection Passed 5/8/2018 05/09/2018
Sidewalk Inspection Passed 5/8/2018 05/09/2018
Sewer Service Inspection Passed 5/8/2018 05/09/2018
Occupancy Inspection - Engineering Passed 5/8/2018 05/09/2018
Documents & Images
Date Uploaded File Type Document Name
05/09/2017 Letter Fire Building Plan Review
05/16/2017 Letter Codes P/R Corrections Document
05/31/2017 Letter Fire Building Plan Review
08/24/2017 Receipt Receipt for transaction: 2017-005948
08/29/2017 Letter Codes Plan Review Conditions
08/29/2017 Letter Codes Building Permit
09/20/2017 Letter Inspection Summary
09/21/2017 Letter Inspection Summary
09/29/2017 Letter Inspection Summary
10/04/2017 Letter Inspection Summary
11/03/2017 Letter Inspection Summary
11/21/2017 Letter Inspection Summary
11/27/2017 Letter Inspection Summary
11/28/2017 Letter Inspection Summary
12/04/2017 Letter Inspection Summary
12/11/2017 Letter Inspection Summary
12/20/2017 Letter Inspection Summary
01/10/2018 Letter Inspection Summary
01/16/2018 Letter Inspection Summary
01/24/2018 Letter Inspection Summary
02/20/2018 Letter Inspection Summary
02/27/2018 Letter Codes Temporary Certificate of Occupancy
04/30/2018 Letter Inspection Summary
05/08/2018 Letter Field Certificate of Occupancy
05/09/2018 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: