Permit Application Status

PRCOM20170396


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20170396
Building Permit - Commercial
Final Completion
M150 ECHELON LAND DEV LLC
NEW OTHER (COMMERCIAL)
NEW POOL AND SHADE TRELLIS SERVING APARTMENT COMPLEX *NOT TO BE ISSUED UNTIL FIRE DEPARTMENT RELEASES PERMIT
02/16/2017
08/07/2018
10/28/2017
05/12/2020
Locations
Contacts
LUKE DRAILY CONSTRUCTION INC, Address:75 NW BUSINESS PARK LANE, Phone:(816) 459-8531  
ELECTRICAL ENTERPRISES INC, Address:PO BOX 127, Phone:(785) 242-7971  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
M150 ECHELON LAND DEV LLC, Address:120 SE 30TH ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 05/10/2017 08/07/2018
Joe Frogge
LC - General Contractor
Corrective Action Required
05/10/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 4/25/17 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
05/10/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/25/17 - acknowledged in letter
Final Development Plan Review Approved 03/03/2017 02/05/2018
Joe Frogge
Fire Plan Review Approved with Conditions 05/17/2017 05/17/2017
Joe Dir
05/17/2017

05/17/2017

Material safety and data sheets
Corrective Action Required
05/10/2017

2012 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. PROVIDE INFROMATION ABOUT THE POOLS PUMP FILTRATION SYSTEM AND CHEMICALS TO BE USED. MAY REQUIRE NFPA 704 HAZARDOUS MATERIALS PLACARDING.
Building Plan Review Approved with Conditions 05/17/2017 05/16/2017
Joe Frogge
Final Development Plan
Resolved
02/05/2018

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 4/25/17 - acknowledged in letter
Project cost
Resolved
09/15/2017

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. 4/25/17 - Total price for project provided. We need a breakdown per structure.
Misc
Resolved
05/16/2017

Incomplete information. Provide the following: - Grounding/bonding plan. 4/25/17 - deferred to shop drawings - Pier details for all trellises, play structures, and similar structures on site. 4/25/17 - Sheet S4.00 not found in resubmittal. 5/16/17 - provided - Power to charging bollard. 4/25/17 - Sheet ME1.01 not found in resubmittal. 5/16/17 - [rpvoded - Engineered plans for retaining wall 4/25/17 - deferred to shope drawings
Misc
Corrective Action Required
05/10/2017

All aspects of pool construction shall be compliant with the Lee's Summit Code of Ordinances Chapter 7 Article 10 - Swimming Pool, Spa, and Hot Tub Code. Action required: Comment is for informational purposes. Specific requirements that require drawing updates listed below. 4/25/17 - acknowledged in letter
Fire Plan Review Rejected 05/01/2017 04/28/2017
Joe Dir
Misc
Corrective Action Required
04/24/2017

EXITS: ADDITIONAL EXITS NEEDED FROM THE POOL AREA. B] 1008.2 Gates. Gates serving the means of egress system shall comply with the requirements of this section. Gates used as a component in a means of egress shall conform to the applicable requirements for doors. [B] 1008.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware.
Material safety and data sheets
Corrective Action Required
04/24/2017

2012 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. PROVIDE INFROMATION ABOUT THE POOLS PUMP FILTRATION SYSTEM AND CHEMICALS TO BE USED. MAY REQUIRE NFPA 704 HAZARDOUS MATERIALS PLACARDING.
Misc
Corrective Action Required
04/28/2017

Resubmittal mentioned a plan sheet SP1.01, that sheet was not included in the resubmittal.
Building Plan Review Rejected 05/01/2017 04/25/2017
Joe Frogge
Final Development Plan
Corrective Action Required
04/24/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 4/25/17 - acknowledged in letter
Project cost
Corrective Action Required
04/24/2017

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. 4/25/17 - Total price for project provided. We need a breakdown per structure.
Misc
Corrective Action Required
04/24/2017

Incomplete information. Provide the following: - Grounding/bonding plan. 4/25/17 - deferred to shop drawings - Pier details for all trellises, play structures, and similar structures on site. 4/25/17 - Sheet S4.00 not found in resubmittal. - Power to charging bollard. 4/25/17 - Sheet ME1.01 not found in resubmittal. - Engineered plans for retaining wall 4/25/17 - deferred to shope drawings
Misc
Corrective Action Required
04/24/2017

All aspects of pool construction shall be compliant with the Lee's Summit Code of Ordinances Chapter 7 Article 10 - Swimming Pool, Spa, and Hot Tub Code. Action required: Comment is for informational purposes. Specific requirements that require drawing updates listed below. 4/25/17 - acknowledged in letter
Misc
Resolved
04/25/2017

Lee's Summit Code of Ordinances Sec. 7-1010. - Steps or ladders. Two (2) or more means of egress in the form of steps or ladders shall be provided for all swimming pools. At least one such means of egress shall be located on a side of the pool at both the deep end and shallow end of the pool. Treads of steps and ladders shall be constructed of nonslip material and at least three (3) inches wide for their full length. Steps and ladders shall have a handrail on both sides. Action required: Modify design to demonstrate compliance.
Bldg - Two exit or exit access doorways 1015.2.1
Resolved
04/25/2017

2012 IBC 1015.2.1 – Two exits or exit access doorways. Where two exits or exit access doorways are required from any portion of the exit access, the exit doors or exit access doorways shall be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimensions of the building or area to be served measured in a straight line between exit doors or exit access doorways. Interlocking or scissor stairs shall be counted as one exit stairway. (See code section for possible exceptions.) Action required: Modify design to show at least 2 exits from pool area. Doors into clubhouse shall not be used as pool exits.
Misc
Resolved
04/25/2017

2012 IBC 1103.1 Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Modify design to provide an accessible entry into pool.
Licensed Contractors Rejected 04/24/2017 04/25/2017
Joe Frogge
LC - General Contractor
Corrective Action Required
04/24/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 4/25/17 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
04/24/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/25/17 - acknowledged in letter
Building Plan Review Rejected 03/03/2017 02/23/2017
Joe Frogge
Final Development Plan
Corrective Action Required
02/23/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Project cost
Corrective Action Required
02/23/2017

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
02/23/2017

Incomplete information. Provide the following: - Grounding/bonding plan. - Pier details for all trellises, play structures, and similar structures on site. - Power to charging bollard. - Engineered plans for retaining wall
Misc
Corrective Action Required
02/23/2017

All aspects of pool construction shall be compliant with the Lee's Summit Code of Ordinances Chapter 7 Article 10 - Swimming Pool, Spa, and Hot Tub Code. Action required: Comment is for informational purposes. Specific requirements that require drawing updates listed below.
Misc
Corrective Action Required
02/23/2017

Lee's Summit Code of Ordinances Sec. 7-1010. - Steps or ladders. Two (2) or more means of egress in the form of steps or ladders shall be provided for all swimming pools. At least one such means of egress shall be located on a side of the pool at both the deep end and shallow end of the pool. Treads of steps and ladders shall be constructed of nonslip material and at least three (3) inches wide for their full length. Steps and ladders shall have a handrail on both sides. Action required: Modify design to demonstrate compliance.
Bldg - Two exit or exit access doorways 1015.2.1
Corrective Action Required
02/23/2017

2012 IBC 1015.2.1 – Two exits or exit access doorways. Where two exits or exit access doorways are required from any portion of the exit access, the exit doors or exit access doorways shall be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimensions of the building or area to be served measured in a straight line between exit doors or exit access doorways. Interlocking or scissor stairs shall be counted as one exit stairway. (See code section for possible exceptions.) Action required: Modify design to show at least 2 exits from pool area. Doors into clubhouse shall not be used as pool exits.
Misc
Corrective Action Required
02/23/2017

2012 IBC 1103.1 Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Modify design to provide an accessible entry into pool.
Licensed Contractors Rejected 03/03/2017 02/23/2017
Joe Frogge
LC - General Contractor
Corrective Action Required
02/23/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
02/23/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 03/03/2017 02/22/2017
Joe Dir
02/22/2017

02/22/2017

Misc
Corrective Action Required
02/22/2017

EXITS: ADDITIONAL EXITS NEEDED FROM THE POOL AREA. B] 1008.2 Gates. Gates serving the means of egress system shall comply with the requirements of this section. Gates used as a component in a means of egress shall conform to the applicable requirements for doors. [B] 1008.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware.
Material safety and data sheets
Corrective Action Required
02/22/2017

2012 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. PROVIDE INFROMATION ABOUT THE POOLS PUMP FILTRATION SYSTEM AND CHEMICALS TO BE USED. MAY REQUIRE NFPA 704 HAZARDOUS MATERIALS PLACARDING.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Other $780.03 $780.03 Paid 12/20/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Pool Steel/Bonding - Commercial Failed 5/16/2019 5/16/2019 at 9:50 AM 05/16/2019
Misc
Corrective Action Required
05/16/2019
POOL BONDING CONSISTS OF COPPER CONDUCTOR BONDED TO ALL METALLIC PARTS ASSCOCIATED WITH THE POOL. BONDED TO THE REBAR AT 4 LOCATIONS WITHIN THE POOL LOCATIONS AND STUBBED OUT SO THAT YOU CAN BOND TO THE REBAR AND METAL PARTS FOR THE POOL DECK. IT WILL THEN NEED TO BE BONDED TO THE POOL EQUIPMENT. NO CONDUCTOR INSTALLED IN ORDER TO FORM AN EQUIPPOTENTIAL BONDING GRID.
Pool Steel/Bonding - Commercial Partial 5/17/2019 5/17/2019 05/17/2019
Misc
Partial Correction
05/17/2019
POOL FOUNDATION AND LIGHT NITCHES BONDED
Gas Piping Inspection - Commercial Failed 6/10/2019 at 1:00 PM 06/10/2019
Misc
Corrective Action Required
06/10/2019
PRESSURE TEST APPROVED. UNDERGOUND, UNDERSLAB FUEL GAS PIPING REQUIRES TRACER WIRE WITH THE PIPE. DO NOT COVER UNTIL THIS IS INSTALLED AND APPROVED.
Gas Piping Inspection - Commercial Passed 6/12/2019 6/12/2019 06/12/2019
Misc
Resolved
06/12/2019
PRESSURE TEST APPROVED. UNDERGOUND, UNDERSLAB FUEL GAS PIPING REQUIRES TRACER WIRE WITH THE PIPE. DO NOT COVER UNTIL THIS IS INSTALLED AND APPROVED.
Pool Steel/Bonding - Commercial Passed 7/10/2019 7/10/2019 07/10/2019
Misc
Resolved
07/10/2019
Occupancy Inspection - Fire Passed 4/14/2020 4/14/2020 04/14/2020
Occupancy Inspection - Codes Commercial Failed 4/14/2020 4/14/2020 04/14/2020
Misc
Corrective Action Required
04/14/2020
-Provide barrier around pool that does not allow a 4" object through the fence. 2 locations southeast side at the stairs . and northeast side at the upper level where fence heads south to building. - Plaque required on Pool equipment room. " POOL EQUIPMENT ROOM"
Occupancy Inspection - Water Utilities Passed 4/14/2020 04/15/2020
Final Inspection - Commercial Passed 5/13/2020 5/12/2020 05/12/2020
Misc
Resolved
05/12/2020
-Provide barrier around pool that does not allow a 4" object through the fence. 2 locations southeast side at the stairs . and northeast side at the upper level where fence heads south to building. - Plaque required on Pool equipment room. " POOL EQUIPMENT ROOM"
Documents & Images
Date Uploaded File Type Document Name
02/22/2017 Letter Fire Building Plan Review
03/06/2017 Letter Codes P/R Corrections Document
04/28/2017 Letter Fire Building Plan Review
05/01/2017 Letter Codes P/R Corrections Document
05/17/2017 Letter Fire Building Plan Review
05/22/2017 Permit Map
12/20/2017 Receipt Receipt for transaction: 2017-007716
08/07/2018 Letter Codes Building Permit
05/16/2019 Letter INSPECTION SUMMARY
05/17/2019 Letter INSPECTION SUMMARY
06/10/2019 Letter INSPECTION SUMMARY
06/12/2019 Letter INSPECTION SUMMARY
07/10/2019 Letter INSPECTION SUMMARY
04/14/2020 Letter INSPECTION SUMMARY
05/12/2020 Letter INSPECTION SUMMARY
10/07/2021 Letter DS Building Permit
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home