Permit Application Status

PRCOM20170394


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20170394
Building Permit - Commercial
Certificate of Occupancy
M150 ECHELON LAND DEV LLC
NEW COMMERCIAL
NEW CLUBHOUSE FOUNDATION PERMIT - PRCOM20173997
02/16/2017
08/07/2018
10/28/2017
09/07/2021
Locations
Contacts
LUKE DRAILY CONSTRUCTION INC, Address:75 NW BUSINESS PARK LANE, Phone:(816) 459-8531  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
ELECTRICAL ENTERPRISES INC, Address:PO BOX 127, Phone:(785) 242-7971  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
M150 ECHELON LAND DEV LLC, Address:120 SE 30TH ST  
KANSAS CITY TESTING & ENGINEERING, Address:1308 ADAMS STREET, Phone:(913) 321-8100  
GRIFFIN RILEY PROPERTY GROUP, Address:21 SE 29TH TER, Phone:(816) 366-7900  
ALDERSGATE METHODIST CHURCH, Address:350 SW M 150 HWY  
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 05/10/2017 04/12/2018
Joe Frogge
LC - General Contractor
Resolved
04/12/2018

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 4/25/17 - acknowledged in letter
LC - MEP Subs
Resolved
04/12/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/25/17 - acknowledged in letter
Final Development Plan Review Approved 03/03/2017 12/15/2017
Joe Frogge
Fire Plan Review Approved with Conditions 05/17/2017 05/16/2017
Joe Dir
05/16/2017

Posting of occupant load
Corrective Action Required
05/10/2017

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED: (verified at inspection) POST THE OCCUPANT LOAD ON ALL LEVELS OF THE CLUBHOUSE.
Address numbers required
Corrective Action Required
05/10/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: (verified at inspection) POST THE NUMERIC ADDRESS ON THE EXTERIOR OF THE BUILDING IN A CONTRASTING COLOR TO THE BACKGROUND. ADDRESS SHALL BE READABLE FROM THE ROADWAY.
Portable fire extinguishers - general
Corrective Action Required
05/10/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED: (verified at inspection) PROVIDE A MINIMUM OF ONE 2A-10BC FIRE EXTINGUISHER FOR EVERY 3,000 SQ FT. ON EACH LEVEL OF THE CLUBHOUSE.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
05/10/2017

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: (verified at inspection) MOUNT THE FIRE EXTINGUISHERS ACCORDING TO sHEETS A7.01 AND A7.02
Misc
Corrective Action Required
05/10/2017

[B] 1008.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware. ACTION REQUIRED: (verified at inspection) NO KEYED LOCKS ON THE EGRESS SIDE OF A MARKED EXIT.
Building Plan Review Approved with Conditions 05/17/2017 05/16/2017
Joe Frogge
Final Development Plan
Resolved
12/15/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 4/25/17 - acknowledged in letter
License Tax Application
Corrective Action Required
05/10/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 4/25/17 - acknowledged in letter
Project cost
Resolved
09/15/2017

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. 4/25/17 - Total price for project provided. We need a breakdown per structure.
Engineered truss package
Corrective Action Required
05/10/2017

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral. 4/25/17 - deferred per request
Misc
Resolved
09/27/2017

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 4/25/17 - acknowledged in letter
Screening - Ground mounted equipment
Corrective Action Required
05/10/2017

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section. 4/25/17 - clarified in letter - to be field verified
Misc
Resolved
05/16/2017

ICC A117.1-2009 Section 604.3.1 Clearance Width. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. Action required: Modify drawings to demonstrate compliance. Ref: toilets at rooms 017, 018, 113, and 118. 4/25/17 - Provide minimum width at restroom 118.
Bldg - Occupant load posting 1004.3
Corrective Action Required
05/10/2017

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: 4/25/17 - acknowledged in letter - to be field verified
NEC - Size of alternating current ground electrode conductor 250.66
Resolved
05/16/2017

2011 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Detail grounding scenario at electrical riser diagram 3/E4.02. 4/25/17 - Updated drawing not included in submittal.
Fire Plan Review Rejected 05/01/2017 04/28/2017
Joe Dir
Posting of occupant load
Corrective Action Required
04/24/2017

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED: (verified at inspection) POST THE OCCUPANT LOAD ON ALL LEVELS OF THE CLUBHOUSE.
Address numbers required
Corrective Action Required
04/24/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: (verified at inspection) POST THE NUMERIC ADDRESS ON THE EXTERIOR OF THE BUILDING IN A CONTRASTING COLOR TO THE BACKGROUND. ADDRESS SHALL BE READABLE FROM THE ROADWAY.
Portable fire extinguishers - general
Corrective Action Required
04/24/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED: (verified at inspection) PROVIDE A MINIMUM OF ONE 2A-10BC FIRE EXTINGUISHER FOR EVERY 3,000 SQ FT. ON EACH LEVEL OF THE CLUBHOUSE.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
04/24/2017

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: (verified at inspection) MOUNT THE FIRE EXTINGUISHERS ON A NORMAL PATH OF TRAVEL WITH A MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANYWHERE ON EACH LEVEL OF THE BUILDING.
Misc
Corrective Action Required
04/24/2017

NO DOOR HARDWARE SCHEDULE WAS SHOWN. [B] 1008.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware. ACTION REQUIRED: NO KEYED LOCKS ON THE EGRESS SIDE OF A MARKED EXIT.
Misc
Corrective Action Required
04/24/2017

EXITS: [B] 1015.2 Exit or exit access doorway arrangement. Required exits shall be located in a manner that makes their availability obvious. Exits shall be unobstructed at all times. Exit and exit access doorways shall be arranged in accordance with Sections 1015.2.1 and 1015.2.2. [B] 1015.2.1 Two exits or exit access doorways. Where two exits or exit access doorways are required from any portion of the exit access, the exit doors or exit access doorways shall be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimension of the building or area to be served measured in a straight line between exit doors or exit access doorways. Interlocking or scissor stairs shall be counted as one exit stairway. Exceptions: 1. Where interior exit stairways are interconnected by a 1-hour fire-resistance-rated corridor conforming to the requirements of Section 1018, the required exit separation shall be measured along the shortest direct line of travel within the corridor. 2. Where a building is equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 or 903.3.1.2, the separation distance of the exit doors or exit access doorways shall not be less than one-third of the length of the maximum overall diagonal dimension of the area served. [B] 1015.2.2 Three or more exits or exit access doorways. Where access to three or more exits is required, at least two exit doors or exit access doorways shall be arranged in accordance with the provisions of Section 1015.2.1. ACTION REQUIRED: PROVIDE ADDITIONAL EXIT(S) FOR THE CLUBHOUSE WALK OUT LEVEL AND THE POOL AREA
Building Plan Review Rejected 05/01/2017 04/25/2017
Joe Frogge
Final Development Plan
Corrective Action Required
04/24/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 4/25/17 - acknowledged in letter
License Tax Application
Corrective Action Required
04/24/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 4/25/17 - acknowledged in letter
Project cost
Corrective Action Required
04/24/2017

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. 4/25/17 - Total price for project provided. We need a breakdown per structure.
Engineered truss package
Corrective Action Required
04/24/2017

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral. 4/25/17 - deferred per request
Misc
Corrective Action Required
04/24/2017

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 4/25/17 - acknowledged in letter
Misc
Resolved
04/25/2017

Insufficient information to complete review. Actions required: - Resolve conflict with beam orientation above **note removed from arch media room. (A series does not agree with S series) - Provide power to light fixtures SL6 & SL7 on Sheet ME1.01 **use clarified - Provide lighting plans for clubhouse. **provided - Specify type of stove/range. (provide verification that appliance is compliant with 2012 IMC Sections 917.2 and/or 917.3 - i.e. justify use of commercial vs. domestic appliance.) **4/25/17 - acknowledged in letter- only for warming purposes - Specify range hood and ductwork complete with materials, routing and termination. **provided
Screening - Ground mounted equipment
Corrective Action Required
04/24/2017

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section. 4/25/17 - clarified in letter - to be field verified
Misc
Resolved
04/25/2017

2012 IBC 718.3 Draftstopping in floors. In combustible construction, draftstopping shall be installed to subdivide floor/ceiling assemblies in the locations prescribed in Sections 718.3.2 through 718.3.3 2012 IBC 718.4 Draftstopping in attics. In combustible construction, draftstopping shall be installed to subdivide attic spaces and concealed roof spaces in the locations prescribed in Sections 718.4.2 and 718.4.3. Ventilation of concealed roof spaces shall be maintained in accordance with Section 1203.2 Action required: Modify drawings to demonstrate compliance.
Misc
Corrective Action Required
04/24/2017

ICC A117.1-2009 Section 604.3.1 Clearance Width. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. Action required: Modify drawings to demonstrate compliance. Ref: toilets at rooms 017, 018, 113, and 118. 4/25/17 - Provide minimum width at restroom 118.
Bldg - Exits and exit access doorways 1015.1
Resolved
04/25/2017

2012 IBC 1015.1 – Exits or exit access doorways from spaces. Two exits or exit access doorways from any space shall be provided where one of the following conditions exists: 1. The occupant load of the space exceeds one of the values in Table 1015.1. 2. The common path of egress travel exceeds one of the limitations of Section 1014.3. 3. Where required by Section 1015.3, 1015.4, 1015.5 or 1015.6. Where a building contains mixed occupancies, each individual occupancy shall comply with the applicable requirements for that occupancy. Where applicable, cumulative occupant loads from adjacent occupancies shall be considered in accordance with the provisions of Section 1004.1. 2012 IBC 1014.3 – Common path of egress travel. The common path of egress travel shall not exceed the common path of egress travel distances in Table 1014.3. Action required: 2 exits required from lower level based on exceeded common path of travel.
Bldg - Two exit or exit access doorways 1015.2.1
Resolved
04/25/2017

2012 IBC 1015.2.1 – Two exits or exit access doorways. Where two exits or exit access doorways are required from any portion of the exit access, the exit doors or exit access doorways shall be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimensions of the building or area to be served measured in a straight line between exit doors or exit access doorways. Interlocking or scissor stairs shall be counted as one exit stairway. (See code section for possible exceptions.) Action required: Minimum distance between exit doors in Great Room 104 not met. Modify design.
Bldg - Panic and fire exit hardware 1008.1.10
Resolved
04/25/2017

2012 IBC 1008.1.10 – Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware. Exception: A main exit of a Group A occupancy in compliance with Section 1008.1.9.3, Item 2. Electrical rooms with equipment rated 1,200 amperes or more and over 6 feet wide that contains over current devices, switching devices or control devices with exit or exit access doors shall be equipped with panic hardware or fire exit hardware. The doors shall swing in the direction of egress travel. Action required: Specify compliant hardware at doors C-01, C-10, C-02, and C-06. 4/25/17 - clarified in letter as covered in spec. To be field verified
Bldg - Occupant load posting 1004.3
Corrective Action Required
04/24/2017

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: 4/25/17 - acknowledged in letter - to be field verified
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Resolved
04/25/2017

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design to accommodate minimum 18" clearance at latch side of Tanning Room door 009 and Bath 118
Accessibility - Turning space 603.2.1
Resolved
04/25/2017

ICC A117.1-2009 Section 603.2.1 Turning Space. A turning space complying with Section 304 shall be provided within the room. The required turning space shall not be provided within a toilet compartment. Action required: Modify design to provide minimum turning space at Bath 118.
Accessibility - Dining surface height 902.4
Resolved
04/25/2017

ICC A117.1-2009 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Modify design to show compliant counter height at Break Room 110 and Guest Suite counter near entry.
Plumb - Minimum number of fixtures 403.1
Resolved
04/25/2017

2012 IPC 403.1 – Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. types of occupancies not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code. Action required: Provide mop/service sink.
Misc 20
Resolved
04/25/2017

2012 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1 and 2) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. (see code for items 4 and 5) Action required: Relocate terminations for exhaust fans serving Restrooms 017 & 018. 4/25/17 - clarified in letter
Mech - Outdoor air required 403.2
Resolved
04/25/2017

2012 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. Ventilation supply systems shall be designed to deliver the required rate of outdoor airflow to the breathing zone within each occupiable space.Action required: Revise drawings to show outside air calculations as well as method of delivery. Action required: Provide outside air calculations and methods of delivery for units AHU-CL3 and AHU-CL4.
NEC - Size of alternating current ground electrode conductor 250.66
Corrective Action Required
04/24/2017

2011 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Detail grounding scenario at electrical riser diagram 3/E4.02. 4/25/17 - Updated drawing not included in submittal.
NEC - Spaces about electrical equipment 110.26
Resolved
04/25/2017

2011 NEC Article 110.26 Spaces About Electrical Equipment. Access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation and maintenance of such equipment. (see code for details) Action required: Re-route plumbing above power panel.
Licensed Contractors Rejected 04/24/2017 04/25/2017
Joe Frogge
LC - General Contractor
Corrective Action Required
04/24/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 4/25/17 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
04/24/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/25/17 - acknowledged in letter
Fire Plan Review Rejected 03/03/2017 02/22/2017
Joe Dir
Misc
Corrective Action Required
02/22/2017

PROVIDE EXIT SIGNS AND EMERGENCY LIGHTING THROUGHT THE CLUBHOUSE FOR ALL LEVELS.
Posting of occupant load
Corrective Action Required
02/22/2017

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. POST THE OCCUPANT LOAD ON ALL LEVELS OF THE CLUBHOUSE. (VERIFIED AT INSPECTION)
Address numbers required
Corrective Action Required
02/22/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS ON THE EXTERIOR OF THE BUILDING IN A CONTRASTING COLOR TO THE BACKGROUND. ADDRESS SHALL BE READABLE FROM THE ROADWAY. (VERIFIED AT INSPECTION)
Portable fire extinguishers - general
Corrective Action Required
02/22/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE A MINIMUM OF ONE 2A-10BC FIRE EXTINGUISHER FOR EVERY 3,000 SQ FT. ON EACH LEVEL OF THE CLUBHOUSE.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
02/22/2017

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MOUNT THE FIRE EXTINGUISHERS ON A NORMAL PATH OF TRAVEL WITH A MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANYWHERE ON EACH LEVEL OF THE BUILDING. (VERIFIED AT INSPECTION)
Misc
Corrective Action Required
02/22/2017

NO DOOR HARDWARE SCHEDULE WAS SHOWN. [B] 1008.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware. NO KEYED LOCKS ON THE EGRESS SIDE OF A MARKED EXIT.
Misc
Corrective Action Required
02/22/2017

EXITS: [B] 1015.2 Exit or exit access doorway arrangement. Required exits shall be located in a manner that makes their availability obvious. Exits shall be unobstructed at all times. Exit and exit access doorways shall be arranged in accordance with Sections 1015.2.1 and 1015.2.2. [B] 1015.2.1 Two exits or exit access doorways. Where two exits or exit access doorways are required from any portion of the exit access, the exit doors or exit access doorways shall be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimension of the building or area to be served measured in a straight line between exit doors or exit access doorways. Interlocking or scissor stairs shall be counted as one exit stairway. Exceptions: 1. Where interior exit stairways are interconnected by a 1-hour fire-resistance-rated corridor conforming to the requirements of Section 1018, the required exit separation shall be measured along the shortest direct line of travel within the corridor. 2. Where a building is equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 or 903.3.1.2, the separation distance of the exit doors or exit access doorways shall not be less than one-third of the length of the maximum overall diagonal dimension of the area served. [B] 1015.2.2 Three or more exits or exit access doorways. Where access to three or more exits is required, at least two exit doors or exit access doorways shall be arranged in accordance with the provisions of Section 1015.2.1. ACTION NEEDED. PROVIDE ADDITIONAL EXIT(S) FOR THE CLUBHOUSE WALK OUT LEVEL AND THE POOL AREA
Building Plan Review Rejected 03/03/2017 02/22/2017
Joe Frogge
Final Development Plan
Corrective Action Required
02/22/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
02/22/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Project cost
Corrective Action Required
02/22/2017

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
02/22/2017

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral.
Misc
Corrective Action Required
02/22/2017

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Misc
Corrective Action Required
02/22/2017

Insufficient information to complete review. Actions required: - Resolve conflict with beam orientation above media room. (A series does not agree with S series) - Provide power to light fixtures SL6 & SL7 on Sheet ME1.01 - Provide lighting plans for clubhouse. - Specify type of stove/range. (provide verification that appliance is compliant with 2012 IMC Sections 917.2 and/or 917.3 - i.e. justify use of commercial vs. domestic appliance.) - Specify range hood and ductwork complete with materials, routing and termination.
Screening - Ground mounted equipment
Corrective Action Required
02/22/2017

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section.
Misc
Corrective Action Required
02/22/2017

2012 IBC 718.3 Draftstopping in floors. In combustible construction, draftstopping shall be installed to subdivide floor/ceiling assemblies in the locations prescribed in Sections 718.3.2 through 718.3.3 2012 IBC 718.4 Draftstopping in attics. In combustible construction, draftstopping shall be installed to subdivide attic spaces and concealed roof spaces in the locations prescribed in Sections 718.4.2 and 718.4.3. Ventilation of concealed roof spaces shall be maintained in accordance with Section 1203.2 Action required: Modify drawings to demonstrate compliance.
Misc
Corrective Action Required
02/22/2017

ICC A117.1-2009 Section 604.3.1 Clearance Width. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. Action required: Modify drawings to demonstrate compliance. Ref: toilets at rooms 017, 018, 113, and 118.
Bldg - Exits and exit access doorways 1015.1
Corrective Action Required
02/22/2017

2012 IBC 1015.1 – Exits or exit access doorways from spaces. Two exits or exit access doorways from any space shall be provided where one of the following conditions exists: 1. The occupant load of the space exceeds one of the values in Table 1015.1. 2. The common path of egress travel exceeds one of the limitations of Section 1014.3. 3. Where required by Section 1015.3, 1015.4, 1015.5 or 1015.6. Where a building contains mixed occupancies, each individual occupancy shall comply with the applicable requirements for that occupancy. Where applicable, cumulative occupant loads from adjacent occupancies shall be considered in accordance with the provisions of Section 1004.1. 2012 IBC 1014.3 – Common path of egress travel. The common path of egress travel shall not exceed the common path of egress travel distances in Table 1014.3. Action required: 2 exits required from lower level based on exceeded common path of travel.
Bldg - Two exit or exit access doorways 1015.2.1
Corrective Action Required
02/22/2017

2012 IBC 1015.2.1 – Two exits or exit access doorways. Where two exits or exit access doorways are required from any portion of the exit access, the exit doors or exit access doorways shall be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimensions of the building or area to be served measured in a straight line between exit doors or exit access doorways. Interlocking or scissor stairs shall be counted as one exit stairway. (See code section for possible exceptions.) Action required: Minimum distance between exit doors in Great Room 104 not met. Modify design.
Bldg - Panic and fire exit hardware 1008.1.10
Corrective Action Required
02/22/2017

2012 IBC 1008.1.10 – Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware. Exception: A main exit of a Group A occupancy in compliance with Section 1008.1.9.3, Item 2. Electrical rooms with equipment rated 1,200 amperes or more and over 6 feet wide that contains over current devices, switching devices or control devices with exit or exit access doors shall be equipped with panic hardware or fire exit hardware. The doors shall swing in the direction of egress travel. Action required: Specify compliant hardware at doors C-01, C-10, C-02, and C-06.
Bldg - Occupant load posting 1004.3
Corrective Action Required
02/22/2017

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required:
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Corrective Action Required
02/22/2017

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design to accommodate minimum 18" clearance at latch side of Tanning Room door 009 and Bath 118
Accessibility - Turning space 603.2.1
Corrective Action Required
02/22/2017

ICC A117.1-2009 Section 603.2.1 Turning Space. A turning space complying with Section 304 shall be provided within the room. The required turning space shall not be provided within a toilet compartment. Action required: Modify design to provide minimum turning space at Bath 118.
Accessibility - Dining surface height 902.4
Corrective Action Required
02/22/2017

ICC A117.1-2009 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Modify design to show compliant counter height at Break Room 110 and Guest Suite counter near entry.
Plumb - Minimum number of fixtures 403.1
Corrective Action Required
02/22/2017

2012 IPC 403.1 – Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. types of occupancies not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code. Action required: Provide mop/service sink.
Misc 20
Corrective Action Required
02/22/2017

2012 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1 and 2) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. (see code for items 4 and 5) Action required: Relocate terminations for exhaust fans serving Restrooms 017 & 018.
Mech - Outdoor air required 403.2
Corrective Action Required
02/22/2017

2012 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. Ventilation supply systems shall be designed to deliver the required rate of outdoor airflow to the breathing zone within each occupiable space.Action required: Revise drawings to show outside air calculations as well as method of delivery. Action required: Provide outside air calculations and methods of delivery for units AHU-CL3 and AHU-CL4.
NEC - Size of alternating current ground electrode conductor 250.66
Corrective Action Required
02/22/2017

2011 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Detail grounding scenario at electrical riser diagram 3/E4.02.
NEC - Spaces about electrical equipment 110.26
Corrective Action Required
02/22/2017

2011 NEC Article 110.26 Spaces About Electrical Equipment. Access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation and maintenance of such equipment. (see code for details) Action required: Re-route plumbing above power panel.
Licensed Contractors Rejected 03/03/2017 02/22/2017
Joe Frogge
LC - General Contractor
Corrective Action Required
02/22/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
02/22/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $995.53 $995.53 Paid 12/20/2017
8331507-Sewer Connection Fee $630.00 $630.00 Paid 12/20/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Failed 3/4/2019 3/4/2019 at 12:30 PM 03/04/2019
Misc
Corrective Action Required
03/04/2019
-NAIL GIRDER TRUSS 9" O.C. -NAIL ALL HOLES IN STRAPS FOR OVERDRILLED TOP PLATES -STRAP FOR PORTAL OPENING BELOW GUEST SUITE NEEDS TO EXTEND TO THE DOUBLE T0P PLATE -ALL DEAD SPACES TO ATTIC AREA AND IN LOWER LEVEL NEED TO BE FIREBLOCKED AND FIRESTOPPED. SEVERAL LOCATIONS, CHECK ALL. -1ST FLOOR, NAIL EXTERIOR CORNER STUDS 12" O.C. -SEAL ALL PENETRATIONS BETWEEN FLOORS DO NOT INSULATE
All Rough Inspection - Commercial Failed 3/6/2019 3/6/2019 at 8:55 AM 03/06/2019
Misc
Corrective Action Required
03/04/2019
**RE-INSPECTION, NO CORRECTIONS MADE. -NAIL GIRDER TRUSS 9" O.C. -NAIL ALL HOLES IN STRAPS FOR OVERDRILLED TOP PLATES -STRAP FOR PORTAL OPENING BELOW GUEST SUITE NEEDS TO EXTEND TO THE DOUBLE T0P PLATE -ALL DEAD SPACES TO ATTIC AREA AND IN LOWER LEVEL NEED TO BE FIREBLOCKED AND FIRESTOPPED. SEVERAL LOCATIONS, CHECK ALL. -1ST FLOOR, NAIL EXTERIOR CORNER STUDS 12" O.C. -SEAL ALL PENETRATIONS BETWEEN FLOORS DO NOT INSULATE
Gas Service Inspection - Commercial Passed 3/6/2019 3/6/2019 at 9:01 AM 03/06/2019
All Rough Inspection - Commercial Passed 3/7/2019 at 3:35 PM 03/08/2019
Misc
Resolved
03/08/2019
**RE-INSPECTION, NO CORRECTIONS MADE. -NAIL GIRDER TRUSS 9" O.C. -NAIL ALL HOLES IN STRAPS FOR OVERDRILLED TOP PLATES -STRAP FOR PORTAL OPENING BELOW GUEST SUITE NEEDS TO EXTEND TO THE DOUBLE T0P PLATE -ALL DEAD SPACES TO ATTIC AREA AND IN LOWER LEVEL NEED TO BE FIREBLOCKED AND FIRESTOPPED. SEVERAL LOCATIONS, CHECK ALL. -1ST FLOOR, NAIL EXTERIOR CORNER STUDS 12" O.C. -SEAL ALL PENETRATIONS BETWEEN FLOORS DO NOT INSULATE
Rated Assembly Inspection Partial 3/22/2019 3/22/2019 03/22/2019
Misc
Partial Correction
03/22/2019
FIRST LAYER CABANA ROOM LID APPROVED
Rated Assembly Inspection Partial 3/25/2019 at 10:35 AM 03/25/2019
Misc
Partial Correction
03/22/2019
FIRST and SECOND LAYER CABANA ROOM LID APPROVED
Rated Assembly Inspection Passed 3/26/2019 at 1:00 PM 03/26/2019
Misc
Resolved
03/26/2019
FIRST and SECOND LAYER CABANA ROOM LID APPROVED
Rated Assembly Inspection Partial 3/28/2019 3/28/2019 at 9:00 AM 03/28/2019
Misc
Partial Correction
03/28/2019
3rd layer and hat channel approved
Rated Assembly Inspection Passed 4/1/2019 4/1/2019 at 11:20 AM 04/01/2019
Misc
Resolved
04/01/2019
3rd layer and hat channel approved
Electrical Service Inspection Passed 4/18/2019 4/18/2019 04/18/2019
Electrical Service Inspection Partial 5/6/2019 5/6/2019 05/06/2019
Misc
Partial Correction
05/06/2019
TEMP POWER APPROVED
Occupancy Inspection - Fire Partial 8/15/2019 8/15/2019 08/15/2019
Occupancy Inspection - Codes Commercial Failed 8/15/2019 8/15/2019 08/15/2019
Misc
Corrective Action Required
08/15/2019
Label all electrical panels Install toilets corrrectly through out Address all items as discussed
Underground Electrical Inspection - Commercial Passed 8/21/2019 8/21/2019 08/21/2019
Misc
Informational
08/21/2019
Two light pole bases out side of club house are ok to poor
Occupancy Inspection - Planning Failed 08/22/2019
Corrective Action Required
08/22/2019
Parking spaces shall be striped and ADA parking space sign posted per the approved plans.
Occupancy Inspection - Fire Temporary C of O 8/20/2019 08/22/2019
Occupancy Inspection - Engineering Temporary C of O 8/22/2019 08/22/2019
Occupancy Inspection - Codes Commercial Failed 8/22/2019 8/22/2019 08/22/2019
Misc
Corrective Action Required
08/15/2019
-*pending other departments approval for TCO. Do Not to Occupy. NOTE: Codes- Will be Approved for TCO on 1st floor only for mailbox room and sales office use. NO ADA accessibility on the lower level of building to the exterior right -of way. No occupancy will be approved on the lower level until all accessibility requirements are met on ramp side of building. Safety fence install to ramp at exterior of the pool area. Full Cof O - all fencing and egress requirements at the pool side and north ramp walkway. POOL on separate permit. No inspections on pool at this time. Full C of O on Club house will be held open until entire Site is complete.
Gas Piping Inspection - Commercial Failed 11/18/2019 11/18/2019 11/18/2019
Misc
Corrective Action Required
11/18/2019
Secure gas lines underneath outside BBQ area
Gas Piping Inspection - Commercial Passed 12/5/2019 12/05/2019
Piers/Caissons Inspection - Commercial Partial 12/20/2019 12/20/2019
Misc
Corrective Action Required
12/20/2019
LIGHT POLE BASE- 6 INSPECTED;PLAY ARE, SOUTH BUILDING 4, 2 AT ROUND ABOUT; CENTER OF WEST EXIT.
Sewer Service Inspection Passed 04/13/2020
Occupancy Inspection - Fire Passed 4/14/2020 04/14/2020
Occupancy Inspection - Planning Temporary C of O 04/14/2020
Corrective Action Required
04/14/2020
Occupancy Inspection - Codes Commercial Temporary C of O 4/14/2020 4/14/2020 04/14/2020
Misc
Corrective Action Required
08/22/2019
APPROVIED TO OCCUPY BUILDING TCO ISSUED - WILL REVISE DATE WHEN LAST BUILDING HAS BEEN ISSUED A C OF O. Full C of O on Club house will be held open until entire Site is complete.
Piers/Caissons Inspection - Commercial Passed 6/4/2020 6/4/2020 06/04/2020
Misc
Informational
06/04/2020
- (6) light pole bases (3) 3580 (3) 3510
Occupancy Inspection - Water Utilities Passed 11/09/2020
Occupancy Inspection - Engineering Passed 09/07/2021
Occupancy Inspection - Codes Commercial Full C of O 09/07/2021
Misc
Resolved
09/07/2021
APPROVIED TO OCCUPY BUILDING TCO ISSUED - WILL REVISE DATE WHEN LAST BUILDING HAS BEEN ISSUED A C OF O. Full C of O on Club house will be held open until entire Site is complete.
Documents & Images
Date Uploaded File Type Document Name
02/22/2017 Letter Fire Building Plan Review
03/06/2017 Letter Codes P/R Corrections Document
04/28/2017 Letter Fire Building Plan Review
05/01/2017 Letter Codes P/R Corrections Document
05/16/2017 Letter Fire Building Plan Review
05/22/2017 Permit Map
09/27/2017 spec insp
12/20/2017 Receipt Receipt for transaction: 2017-007716
03/12/2018 RFI 026 FOOTINGS-BDC 18 0310
08/07/2018 Letter Codes Building Permit
08/07/2018 Letter Codes Plan Review Conditions
03/04/2019 Letter INSPECTION SUMMARY
03/06/2019 Letter INSPECTION SUMMARY
03/06/2019 Letter INSPECTION SUMMARY
03/08/2019 Letter INSPECTION SUMMARY
03/22/2019 Letter INSPECTION SUMMARY
03/25/2019 Letter INSPECTION SUMMARY
03/26/2019 Letter INSPECTION SUMMARY
03/28/2019 Letter INSPECTION SUMMARY
04/01/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
08/15/2019 Letter INSPECTION SUMMARY
08/21/2019 Letter INSPECTION SUMMARY
11/18/2019 Letter INSPECTION SUMMARY
12/05/2019 Letter INSPECTION SUMMARY
12/20/2019 Letter INSPECTION SUMMARY
04/14/2020 Letter Codes Temporary Certificate of Occupancy
06/04/2020 Letter INSPECTION SUMMARY
08/03/2020 Application Form DS Building Permit - PRCOM20170394
08/03/2020 Application Form DS Building Permit - PRCOM20171616
08/03/2020 Application Form DS Building Permit - PRCOM20173994
08/03/2020 Application Form DS Building Permit - PRCOM20180521
08/03/2020 Application Form DS Building Permit - PRCOM20171599
08/03/2020 Application Form DS Building Permit - PRCOM20171617
08/03/2020 Application Form DS Building Permit - PRCOM20173998
08/03/2020 Application Form DS Building Permit - PRCOM20170394
08/03/2020 Application Form DS Building Permit - PRCOM20170399
08/03/2020 Application Form DS Building Permit - PRCOM20171600
08/03/2020 Application Form DS Building Permit - PRCOM20171618
08/03/2020 Application Form DS Building Permit - PRCOM20173999
08/03/2020 Application Form DS Building Permit - PRCOM20170409
08/03/2020 Application Form DS Building Permit - PRCOM20171606
08/03/2020 Application Form DS Building Permit - PRCOM20171619
08/03/2020 Application Form DS Building Permit - PRCOM20180520
08/03/2020 Application Form DS Building Permit - PRCOM20170411
08/03/2020 Letter Scanner@LukeDraily.com_20200731_145207
09/07/2021 Letter Codes Final Certificate of Occupancy
09/15/2021 Letter Codes Final Certificate of Occupancy
09/15/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter Field Certificate of Occupancy
09/15/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home