Summary
PRCOM20142582
Building Permit - Commercial
Final Completion
JOHN KNOX VILLAGE
ALTERATION COMMERCIAL
INTERIOR ALTERATIONS TO EXISTING HOUSE TO BECOME SALES OFFICE
09/11/2014
10/17/2014
04/05/2015
01/05/2015
Locations
Contacts
PARIC CORPORATION , Address:77 WESTORT PLAZA STE 250, Phone:(636) 561-9795  
CAPITAL ELECTRIC CONSTRUCTION INC, Address:PO BOX 410079, Phone:(913) 335-1214  
SALADINO PLUMBING & HEATING COMPANY, Address:2210 TELEVISION PL, Phone:(816) 833-9900  
STUDIO SIX 5, Address:811 BARTON SPRINGS ROAD, STE 800, Phone:(512) 476-6501  
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 10/13/2014 10/15/2014
Joe Frogge
Code analysis required
Resolved
10/07/2014

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide code analysis.
Misc
Resolved
10/15/2014

Insufficient information to complete review. Action required: Provide the following information: - Ramp/stair design (may be deferred to construction) - MEP design. (detailed scopes of work that include all materials and methods would be adequate) - 10/7/14 - Ramp design not provided (provide letter of deferral), MEP scopes not provided, Grab bar info provided. 10/14/14 - ramp & scopes provided
Misc 12
Corrective Action Required
10/15/2014

Given that entry approach is designed at maximum 1:20 slope, ramp requirements do not apply. Slope to be verified at inspections.
Licensed Contractors Approved 10/13/2014 10/15/2014
Joe Frogge
LC - General Contractor
Resolved
10/07/2014

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
10/15/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors. Per Steve Emmons - no mechanical work to be performed.
Fire Plan Review Approved with Conditions 10/13/2014 10/13/2014
Mike Weisenborn
Misc
Corrective Action Required
10/06/2014

No further Fire Dept. comments
Fire Plan Review Approved 09/23/2014 09/16/2014
Brian Austerman
Portable fire extinguishers - general
Corrective Action Required
09/16/2014

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a 5lb ABC type extinguisher
Building Plan Review Rejected 09/23/2014 09/16/2014
Joe Frogge
Code analysis required
Corrective Action Required
09/16/2014

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide code analysis.
License Tax Application
Resolved
09/16/2014

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
09/16/2014

Insufficient information to complete review. Action required: Provide the following information: - Ramp/stair design (may be deferred to construction) - MEP design. (detailed scopes of work that include all materials and methods would be adequate) - Provide more information to describe/depict how grab bars are to be installed. (current configuration complicates how the side and vertical bars are to be positioned)
Licensed Contractors Rejected 09/23/2014 09/16/2014
Joe Frogge
LC - General Contractor
Corrective Action Required
09/16/2014

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
09/16/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $329.90 $329.90 Paid 10/17/2014
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Not Ready 12/3/2014 12/3/2014 at 12:00 AM 12/03/2014
Misc
Corrective Action Required
12/03/2014
LSCO SEC 7-142; IBC 106: PERMIT DRAWINGS NOT FOUND ON SITE. NO INSPECTIONS WITHOUT CITY-STAMPED PERMIT PRINTS.
All Rough Inspection - Commercial Passed 12/4/2014 12/4/2014 at 12:00 AM 12/04/2014
Final Inspection - Commercial Failed 12/29/2014 at 12:00 AM 12/29/2014
Misc
Corrective Action Required
12/29/2014
ENSURE CIRCUIT LABELS AT ELECTRICAL PANEL ARE COMPLETE, ACCURATE AND CURRENT. SEE POSITIONS 6/8.
Misc
Corrective Action Required
12/29/2014
NEC 370-20; IRC E3806.5-6 SET-BACK OF ELECTRICAL RECEPTACLE / SWITCH BOXES: 1/4" MAXIMUM SET-BACK @ NON-COMBUSTIBLE SURFACES. SEE AT KITCHEN BACKSPLASH.
Misc
Corrective Action Required
12/29/2014
NEC 380-10; 410-56(f) / IRC E3901.10; E3902.6 SECURING OF ELECTRICAL RECEPTACLES / SWITCHES: SOME NOT TIGHT TO BOX; CHECK ALL AND ENSURE NONE ARE "SOFT" OR LOOSE SIDE-TO-SIDE. SEE ABOVE BREAK ROOM COUNTER AND ELSEWHERE.
Misc
Corrective Action Required
12/29/2014
BREAK AREA: - OPEN DRAIN LINE FITTING? - CHECK SLOPE OF CONNECTED DRAIN LINE. CORRECT IF NOT POSITIVE. - SECURE WATER LINE TERMINATIONS AT VANITY - IRC P2717.3 BACKFLOW PREVENTION AT DISHWASHER: DRAIN DISCHARGE LINE MUST RISE TO UNDERSIDE OF COUNTER AND BE SECURELY FASTENED (OR APPROVED ALTERNATE MEANS TO MAINTAIN HIGH POINT IN DISCHARGE LINE.)
Misc
Corrective Action Required
12/29/2014
OCCUPANCY STATUS: IF APPROVED BY FIRE DEPARTMENT OK TO SET UP FOR BUSINESS. NO PUBLIC PRIOR TO APPROVAL.
Final Inspection - Commercial Passed 1/6/2015 at 12:00 AM 01/06/2015
Occupancy Inspection - Fire Passed 1/6/2015 at 12:00 AM 01/06/2015
Documents & Images
Date Uploaded File Type Document Name
09/16/2014 Letter Codes P/R Corrections Document
09/16/2014 Letter Fire Building Plan Review
10/06/2014 Letter Fire Building Plan Review
10/07/2014 Letter Codes P/R Corrections Document
10/15/2014 Letter Codes Plan Review Conditions
10/17/2014 Receipt Receipt for transaction: 2014-002008
10/17/2014 Letter Codes Building Permit
12/03/2014 Letter Inspection Summary
12/04/2014 Letter Inspection Summary
12/29/2014 Letter Inspection Summary
01/06/2015 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home