Permit Application Status

PRCOM20140913


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20140913
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
NEW TENANT FINISH
TENANT FINISH OF EXISTING SHELL SPACE FOR NEW GENERAL PRACTITIONER CLINICS
04/29/2014
07/03/2014
11/04/2014
09/29/2014
Locations
Contacts
MCCARTHY BUILDING COMPANIES INC, Address:12851 MANCHESTER RD, Phone:(314) 646-4179  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
PULSE DESIGN GROUP, Address:8207 MELROSE DRIVE  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 07/17/2014
Brian Austerman
Licensed Contractors Approved 05/22/2014 07/02/2014
Development Center
Business License
Resolved
05/19/2014

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
License contractors
Resolved
07/02/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fire Plan Review Approved with Conditions 05/15/2014 05/20/2014
Mike Weisenborn
Building Plan Review Approved with Conditions 05/22/2014 05/19/2014
Joe Frogge
Misc
Corrective Action Required
05/15/2014

Address issue: Action required: Provide suite # for tenant. Coordinate with adjacent tenants and fire department. May be verified at inspection.
Plan Submittal 2012 Codes
Resolved
05/19/2014

All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Update cover sheet to reflect current code cycle. 5/19/14 - corrected
Misc
Resolved
05/19/2014

2012 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: This building is of type IA construction. Update cover sheet and any relevant design elements. 5/19/14 - corrected
Misc
Resolved
05/19/2014

Construction information. - Sheet AE102 has a reference to detail C6/AE302 which I am unable to find. Is this supposed to be C7? - Partition detail C5 on AE302 has incorrect wall pattern. 5/19/14 - corrected
Bldg - Toilet room floor and base 1210.2.1
Resolved
05/19/2014

2012 IBC 1210.2.1 – Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. Action required: Specify wall base for restrooms. Unable to locate type "IB-1." 5/19/14 - corrected
Misc
Resolved
05/19/2014

2012 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. Ventilation supply systems shall be designed to deliver the required rate of outdoor airflow to the breathing zone within each occupiable space. Required Action: Provide verification that outside air requirements are met. 5/19/14 - information provided in response letter
Misc
Resolved
05/19/2014

2012 IBC Fire-resistance-rated glazing. Fire-resistance-rated glazing tested as part of a fire-resistance-rated wall assembly in accordance with ASTM E 119 or UL 263 and labeled in accordance with Section 703.5 shall be permitted in fire doors and fire window assemblies where tested an installed in accordance with their listings and shall not otherwise be required to comply with this section. Action required: Provide specification for window adjacent to door 2F00-G that shows compliance with 2 hour fire rating. Also note that this glazing must be safety tempered. 5/19/14 - spec provided
Accessibility - Fixed sidewall grab bars 604.5.1
Resolved
05/19/2014

ICC A117.1-2009 604.5.1 – Fixed side wall grab bars. Fixed side-wall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Vertical grab bars are shown too far from rear wall. Modify details. 5/19/14 - corrected
Misc
Resolved
05/19/2014

2012 IBC Through penetrations. Penetrations into or through fire walls, fire barriers, smoke barrier walls and fire partitions shall comply with Section 714.3.1 through 714.3.3. Penetrations in smoke barrier walls shall also comply with Section 714.5. Action required: Specify method for plumbing penetrations through rated assemblies. 5/19/14 - information provided in resonse letter
Building Plan Review Rejected 05/09/2014 05/08/2014
Joe Frogge
Misc
Corrective Action Required
05/08/2014

Address issues: Action required: Update cover sheet to reflect correct address of 110 NE Saint Luke's Blvd. Also, provide suite # for tenant. Coordinate with adjacent tenants and fire department.
Plan Submittal 2012 Codes
Corrective Action Required
05/08/2014

All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Update cover sheet to reflect current code cycle.
Misc
Corrective Action Required
05/08/2014

2012 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: This building is of type IA construction. Update cover sheet and any relevant design elements.
Misc
Corrective Action Required
05/08/2014

Construction information. - Sheet AE102 has a reference to detail C6/AE302 which I am unable to find. Is this supposed to be C7? - Partition detail C5 on AE302 has incorrect wall pattern.
Bldg - Toilet room floor and base 1210.2.1
Corrective Action Required
05/08/2014

2012 IBC 1210.2.1 – Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. Action required: Specify wall base for restrooms. Unable to locate type "IB-1."
Misc
Corrective Action Required
05/08/2014

2012 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. Ventilation supply systems shall be designed to deliver the required rate of outdoor airflow to the breathing zone within each occupiable space. Required Action: Provide verification that outside air requirements are met.
Misc
Corrective Action Required
05/08/2014

2012 IBC Fire-resistance-rated glazing. Fire-resistance-rated glazing tested as part of a fire-resistance-rated wall assembly in accordance with ASTM E 119 or UL 263 and labeled in accordance with Section 703.5 shall be permitted in fire doors and fire window assemblies where tested an installed in accordance with their listings and shall not otherwise be required to comply with this section. Action required: Provide specification for window adjacent to door 2F00-G that shows compliance with 2 hour fire rating. Also note that this glazing must be safety tempered.
Accessibility - Fixed sidewall grab bars 604.5.1
Corrective Action Required
05/08/2014

ICC A117.1-2009 604.5.1 – Fixed side wall grab bars. Fixed side-wall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Vertical grab bars are shown too far from rear wall. Modify details.
Misc
Corrective Action Required
05/08/2014

2012 IBC Through penetrations. Penetrations into or through fire walls, fire barriers, smoke barrier walls and fire partitions shall comply with Section 714.3.1 through 714.3.3. Penetrations in smoke barrier walls shall also comply with Section 714.5. Action required: Specify method for plumbing penetrations through rated assemblies.
Licensed Contractors Rejected 05/09/2014 05/07/2014
Joe Frogge
Business License
Corrective Action Required
05/07/2014

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
License contractors
Corrective Action Required
05/07/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fire Plan Review Approved 05/09/2014 05/06/2014
Brian Austerman
Construction documents - Fire protection systems
Corrective Action Required
05/06/2014

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval
Construction documents for fire alarm systems
Corrective Action Required
05/06/2014

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $2,747.50 $2,747.50 Paid 07/03/2014
$2,747.50
7232302-Saint Lukes Road and Bridge Escrow $1,456.80 $1,456.80 Paid 06/12/2014
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Investigation Inspection Complete 7/15/2014 at 12:00 AM 07/15/2014
Rough Framing Inspection - Commercial Partial 7/16/2014 at 12:00 AM 07/16/2014
Misc
Resolved
08/01/2014
RESPONDED TO G.C. QUESTION RE HVAC DUCT OBSTRUCTIONS WHERE PARTITIONS ARE TO EXTEND TO DECK ABOVE.
In-wall Inspection Partial 7/31/2014 7/31/2014 at 12:00 AM 07/31/2014
Misc
Partial Correction
07/31/2014
OK TO COVER WHEN READY LIGHT-GUAGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2F203-213; 217; 218; 220-224; 224A; 224B; 226; 232; 240;
Miscellaneous Inspection Passed 7/31/2014 at 12:00 AM 07/31/2014
Rough Framing Inspection - Commercial Passed 7/16/2014 at 12:00 AM 08/01/2014
Misc
Partial Correction
07/16/2014
RESPONDED TO G.C. QUESTION RE HVAC DUCT OBSTRUCTIONS WHERE PARTITIONS ARE TO EXTEND TO DECK ABOVE.
In-wall Inspection Partial 8/4/2014 8/4/2014 at 12:00 AM 08/04/2014
Misc
Partial Correction
07/31/2014
OK TO COVER WHEN READY LIGHT-GUAGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2F203-213; 217; 218; 220-224; 224A; 224B; 226; 232; 240; [2F200; 228; 230; 231; N.S. 227; 215; 216;
In-wall Inspection Partial 8/6/2014 8/6/2014 at 12:00 AM 08/06/2014
Misc
Partial Correction
08/04/2014
OK TO COVER WHEN READY LIGHT-GUAGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2F200; 203-213; N.S. 215; 216; 217; 218; 220-224; 224A; 224B; 226; 227; 228; 230; 231; 232; 240; [200A; 201; 202; 219; 224C; 229;
Rated Assembly Inspection Partial 8/6/2014 at 12:00 AM 08/06/2014
Misc
Partial Correction
08/06/2014
RATED SOFFIT AT OPENING @ 2F200A: FRAMING AND LINER BOARD OK TO COVER WHEN READY;
Above Ceiling Inspection Partial 8/6/2014 at 12:00 AM 08/06/2014
Misc
Partial Correction
08/06/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 217; 226; 227
Miscellaneous Inspection Passed 8/7/2014 at 12:00 AM 08/07/2014
In-wall Inspection Partial 8/8/2014 8/8/2014 at 12:00 AM 08/08/2014
Misc
Partial Correction
08/06/2014
OK TO COVER WHEN READY LIGHT-GUAGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2F200; 203-213; N.S. 215; 216; 217; 218; 220-224; 224A; 224B; 226; 227; 228; 230; 231; 232; 240; [200A; 201; 202; 219; 224C; 229; [214; 225; 225A; 225B;
Above Ceiling Inspection Partial 8/13/2014 at 12:00 AM 08/13/2014
Misc
Partial Correction
08/13/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 217, 226, 227; SOFFIT OUTSIDE DOOR 2F200A;
Above Ceiling Inspection Partial 8/15/2014 8/15/2014 at 12:00 AM 08/15/2014
Misc
Partial Correction
08/13/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 217, 226, 227; SOFFIT OUTSIDE DOOR 2F200A; CEILING IN 2F206;
Miscellaneous Inspection Partial 8/15/2014 at 12:00 AM 08/15/2014
In-wall Inspection Partial 8/20/2014 8/20/2014 at 12:00 AM 08/20/2014
Misc
Partial Correction
08/08/2014
OK TO COVER WHEN READY LIGHT-GUAGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2F200; 203-213; N.S. 215; 216; 217; 218; 220-224; 224A; 224B; 226; 227; 228; 230; 231; 232; 240; [200A; 201; 202; 219; 224C; 229; [214; 225; 225A; 225B; IN-FILL OPENING AT REMOVED DOOR @ [2F202] PLAN S WALL; FRAMING AND SETTING OF DOOR FRAME FOR NEW DOOR (2F200A)
In-wall Inspection Partial 8/25/2014 8/25/2014 at 12:00 AM 08/25/2014
Misc
Partial Correction
08/20/2014
OK TO COVER WHEN READY LIGHT-GUAGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2F200; 203-213; N.S. 215; 216; 217; 218; 220-224; 224A; 224B; 226; 227; 228; 230; 231; 232; 240; [200A; 201; 202; 219; 224C; 229; [214; 225; 225A; 225B; IN-FILL OPENING AT REMOVED DOOR @ [2F202] PLAN S WALL; FRAMING AND SETTING OF DOOR FRAME FOR NEW DOOR (2F200A); JAMB & BULKHEAD FRAMING AND SETTING OF DOOR FRAME FOR NEW DOOR (2F123);
Above Ceiling Inspection Partial 8/25/2014 8/25/2014 at 12:00 AM 08/25/2014
Misc
Partial Correction
08/15/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 217, 226, 227; SOFFIT OUTSIDE DOOR 2F200A; CEILING IN 2F206;
Misc
Partial Correction
08/25/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 207-208; 209 AFTER ONE MC BATWING IS MOVED FROM CEILING HANGER WIRE TO ELECTRICAL SLACK WIRE; 210; 211; 212; 213; 214; 215; 216 + CORRIDOR RECESS THERETO; 227 N.S.;
Above Ceiling Inspection Partial 8/27/2014 8/27/2014 at 12:00 AM 08/27/2014
Misc
Partial Correction
08/25/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 217, 226, 227; SOFFIT OUTSIDE DOOR 2F200A; CEILING IN 2F206;
Misc
Partial Correction
08/25/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 207-208; 209 AFTER ONE MC BATWING IS MOVED FROM CEILING HANGER WIRE TO ELECTRICAL SLACK WIRE; 210; 211; 212; 213; 214; 215; 216 + CORRIDOR RECESS THERETO; 227 N.S.; [201-205; 217-224; 224A; 224B; 224C; 226; 229; 232;
Above Ceiling Inspection Partial 8/28/2014 8/28/2014 at 12:00 AM 08/28/2014
Misc
Partial Correction
08/27/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 201-205; 207-208; 209; 210; 211; 212; 213; 214; 215; 216; 217-224; 224A; 224B; 224C; 226; 227 N.S.; 229; 232; [200; 200A; 225; 225A; 225B; 230; 231; 234
Misc
Partial Correction
08/27/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 217, 226, 227; SOFFIT OUTSIDE DOOR 2F200A; CEILING IN 2F206;
Miscellaneous Inspection Passed 9/9/2014 9/22/2014 at 12:00 AM 09/22/2014
Miscellaneous Inspection Passed 9/24/2014 at 12:00 AM 09/24/2014
Alarm Test Passed 9/25/2014 at 12:00 AM 09/25/2014
Occupancy Inspection - Fire Temporary C of O 9/25/2014 at 12:00 AM 09/25/2014
Misc
Corrective Action Required
09/25/2014
- secure the loose alarm notification device (horn/strobe) back to the j-box in the corridor outside the main entrance of suite 245 - post the numeric/suite signage in the corridor outside the entrance doors to suite 245 - interior corridor emerg lights need to remain on with switches off during a power outage. install watt stoppers as needed.
Occupancy Inspection - Codes Commercial Temporary C of O 9/25/2014 9/25/2014 at 12:00 AM 09/25/2014
Misc
Resolved
09/25/2014
TWO OUTLETS NOT HOT IN PLUGMOLD IN LAB
Misc
Resolved
09/25/2014
WATER SUPPLY NOT ACTOVE AT ONE SINK; ONE W.C. NOT COMPLETED
Above Ceiling Inspection Passed 8/28/2014 at 12:00 AM 09/25/2014
Misc
Resolved
09/25/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 201-205; 207-208; 209; 210; 211; 212; 213; 214; 215; 216; 217-224; 224A; 224B; 224C; 226; 227 N.S.; 229; 232; [200; 200A; 225; 225A; 225B; 230; 231; 234
Misc
Resolved
09/25/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT 217, 226, 227; SOFFIT OUTSIDE DOOR 2F200A; CEILING IN 2F206;
In-wall Inspection Passed 8/25/2014 at 12:00 AM 09/25/2014
Misc
Resolved
09/25/2014
OK TO COVER WHEN READY LIGHT-GUAGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2F200; 203-213; N.S. 215; 216; 217; 218; 220-224; 224A; 224B; 226; 227; 228; 230; 231; 232; 240; [200A; 201; 202; 219; 224C; 229; [214; 225; 225A; 225B; IN-FILL OPENING AT REMOVED DOOR @ [2F202] PLAN S WALL; FRAMING AND SETTING OF DOOR FRAME FOR NEW DOOR (2F200A); JAMB & BULKHEAD FRAMING AND SETTING OF DOOR FRAME FOR NEW DOOR (2F123);
Rated Assembly Inspection Passed 8/6/2014 at 12:00 AM 09/25/2014
Misc
Resolved
09/25/2014
RATED SOFFIT AT OPENING @ 2F200A: FRAMING AND LINER BOARD OK TO COVER WHEN READY;
Occupancy Inspection - Codes Commercial Full C of O 9/29/2014 at 12:00 AM 09/29/2014
Occupancy Inspection - Fire Passed 9/29/2014 at 12:00 AM 09/29/2014
Misc
Corrective Action Required
09/25/2014
- secure the loose alarm notification device (horn/strobe) back to the j-box in the corridor outside the main entrance of suite 245 - post the numeric/suite signage in the corridor outside the entrance doors to suite 245 - interior corridor emerg lights need to remain on with switches off during a power outage. install watt stoppers as needed.
Documents & Images
Date Uploaded File Type Document Name
05/06/2014 Letter Fire Building Plan Review
05/08/2014 Letter Codes P/R Corrections Document
05/19/2014 Letter Codes P/R Corrections Document
07/02/2014 Letter Codes Plan Review Conditions
07/03/2014 Letter Codes Building Permit
07/17/2014 Letter Fire (Sprinkler) Plan Review
07/31/2014 Letter Inspection Summary
08/04/2014 Letter Inspection Summary
08/06/2014 Letter Inspection Summary
08/08/2014 Letter Inspection Summary
08/13/2014 Letter Inspection Summary
08/15/2014 Letter Inspection Summary
08/20/2014 Letter Inspection Summary
08/25/2014 Letter Inspection Summary
08/27/2014 Letter Inspection Summary
08/28/2014 Letter Inspection Summary
09/25/2014 Letter Codes Temporary Certificate of Occupancy
09/29/2014 Letter Field Certificate of Occupancy
09/30/2014 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home