Permit Application Status

PRCOM20140442


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20140442
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
CHANGE OF TENANT
SAINT LUKES MULTISPECIALTY CLINIC TENANT FINISH
03/26/2014
04/15/2014
09/24/2014
06/12/2014
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
A L HUBER INC, Address:10770 EL MONTE, Phone:(913) 341-4880  
GUY GRONBERG ARCHITECTS, Address:113 SE 3RD ST, Phone:(816) 524-0878  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
HEARTLAND ELECTRIC CORPORATION, Address:947 LOCUST HILL CIR, Phone:(816) 318-8500  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 05/14/2014
Brian Austerman
Misc
Corrective Action Required
05/14/2014

Plans received 5/12/14, released 5/14/14
Licensed Contractors Approved 04/30/2014 04/15/2014
Joe Frogge
License contractors
Corrective Action Required
04/03/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action Required: Licensed sub-contractors are are required to be listed on permit. Provide names of MEP sub contractors.
Fire Plan Review Approved 04/10/2014 04/03/2014
Joe Frogge
Building Plan Review Approved with Conditions 04/10/2014 04/03/2014
Joe Frogge
Misc
Resolved
04/03/2014

Type of construction for this building is IA, not IIB as shown on cover sheet. Action Required: This is for informational purposes.
Misc
Corrective Action Required
04/03/2014

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locates specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or protable lighitng equipment are to be used. (refer to code for exceptions) Required Action: All receptacles within 6' of sinks to be GFCI protected. 4/3/14 - Comment covered with general note on original drawings. To be verified at inspection.
Misc
Corrective Action Required
04/03/2014

2011 NEC 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Areas. Wiring in patient care areas shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care areas shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, or metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductor. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles. 2. Metal Boxes and enclosures containing receptacles. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (refer code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action Required. Provide redundantly grounded systems in all exam rooms. 4/3/14 - Conduit may be used as redundant ground but must be listed for this purpose. To be verified at inspection.
Building Plan Review Rejected 04/07/2014 03/28/2014
Joe Frogge
Misc
Corrective Action Required
03/27/2014

Type of construction for this building is IA, not IIB as shown on cover sheet. Action Required: This is for informational purposes.
Misc
Corrective Action Required
03/27/2014

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locates specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or protable lighitng equipment are to be used. (refer to code for exceptions) Required Action: All receptacles within 6' of sinks to be GFCI protected.
Misc
Corrective Action Required
03/27/2014

2011 NEC 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Areas. Wiring in patient care areas shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care areas shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, or metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductor. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles. 2. Metal Boxes and enclosures containing receptacles. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (refer code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action Required. Provide redundantly grounded systems in all exam rooms.
Fire Plan Review Approved 04/07/2014 03/27/2014
Brian Austerman
Construction documents - Fire protection systems
Corrective Action Required
03/27/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval
Construction documents for fire alarm systems
Corrective Action Required
03/27/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval is modifications are made to the system
Portable fire extinguishers - general
Corrective Action Required
03/27/2014

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide fire extinguishers if not existing
Licensed Contractors Rejected 04/07/2014 03/27/2014
Joe Frogge
License contractors
Corrective Action Required
03/27/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action Required: Licensed sub-contractors are are required to be listed on permit. Provide names of MEP sub contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $163.40 $163.40 Paid 04/15/2014
$163.40
8331507-Sewer Connection Fee $210.00 $210.00 Paid 04/15/2014
$210.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Failed 5/15/2014 at 12:00 AM 05/15/2014
Misc
Corrective Action Required
05/15/2014
CHECK ALL JAMB STUDS; SCREW ALL TO BASE TRACK.
Misc
Corrective Action Required
05/15/2014
FIRE-BLOCK ALL LEVEL-TO-LEVEL OPENINGS AT FLOOR SLAB.
Misc
Corrective Action Required
05/15/2014
CLOMPLETE FRAMING & BLOCKING FOR 42", 36", AND 18" GRAB BARS IN 3D314 AND 3D318.
Misc
Corrective Action Required
05/15/2014
IPC - PROTECTION OF COPPER PIPING AT PENETRATION OF STEEL FRAMING MEMBERS: INSTALL GROMMETS OR OTHER APPROVED PROTECTION FROM SHARP EDGES & DISSIMILAR METAL.
Misc
Corrective Action Required
05/15/2014
RE-FRAMING AT 3D316 NOT COMPLETED FOR INSPECTION.
In-wall Inspection Partial 5/16/2014 5/16/2014 at 12:00 AM 05/16/2014
Misc
Corrective Action Required
05/15/2014
JAMB STUDS NOT SCREWED TO BASE TRACK AT 3D312B; DO NOT DRYWALL THIS SPACE.
Misc
Resolved
05/16/2014
FIRE-BLOCK ALL LEVEL-TO-LEVEL OPENINGS AT FLOOR SLAB.
Misc
Partial Correction
05/16/2014
BLOCKING REQUIRED FOR 42", 36", AND 18" GRAB BARS IN 3D314 AND 3D318.
Misc
Resolved
05/16/2014
IPC - PROTECTION OF COPPER PIPING AT PENETRATION OF STEEL FRAMING MEMBERS: INSTALL GROMMETS OR OTHER APPROVED PROTECTION FROM SHARP EDGES & DISSIMILAR METAL.
Misc
Corrective Action Required
05/15/2014
FRAMING OF BULKHEADS AND FACIAS AT 3D316 NOT APPROVED TO COVER.
Misc
Corrective Action Required
05/16/2014
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT ALL EXCEPT 3D312B AND 3D316
In-wall Inspection Passed 5/19/2014 5/19/2014 at 12:00 AM 05/19/2014
Misc
Resolved
05/19/2014
JAMB STUDS NOT SCREWED TO BASE TRACK AT 3D312B; DO NOT DRYWALL THIS SPACE.
Misc
Resolved
05/19/2014
BLOCKING REQUIRED FOR 42", 36", AND 18" GRAB BARS IN 3D314 AND 3D318.
Misc
Resolved
05/19/2014
FRAMING OF BULKHEADS AND FACIAS AT 3D316 NOT APPROVED TO COVER.
Misc
Resolved
05/19/2014
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT ALL EXCEPT 3D312B AND 3D316
Above Ceiling Inspection Partial 6/3/2014 6/3/2014 at 12:00 AM 06/03/2014
Misc
Corrective Action Required
06/03/2014
SMACNA / AIR DIFUSSION COUNCIL / MANUFACTURER'S INSTRUCTIONS > INSTALLATION OF HVAC FLEXIBLE DUCT OR CONNECTORS: CLAMPS & TAPING OF INNER AND OUTER LAYER MUST BE PER INSTRUCTIONS. NON-METALLIC CLAMPS OK ONLY WITH BEADED FITTINGS. LEAVE TILE OUT AT EACH LOCATION WHERE FLEX DUCT OR CONNECTORS ARE INSTALLED. REMOVE ANY ABANDONED FLEX AND CAP HARD PIPE.
Above Ceiling Inspection Partial 6/4/2014 6/4/2014 at 12:00 AM 06/04/2014
Misc
Corrective Action Required
06/03/2014
SMACNA / AIR DIFUSSION COUNCIL / MANUFACTURER'S INSTRUCTIONS > INSTALLATION OF HVAC FLEXIBLE DUCT OR CONNECTORS: CLAMPS & TAPING OF INNER AND OUTER LAYER MUST BE PER INSTRUCTIONS. NON-METALLIC CLAMPS OK ONLY WITH BEADED FITTINGS. LEAVE TILE OUT AT EACH LOCATION WHERE FLEX DUCT OR CONNECTORS ARE INSTALLED. REMOVE ANY ABANDONED FLEX AND CAP HARD PIPE.
Misc
Partial Correction
06/04/2014
ISSUE #1 YET TO BE CORRECTED AT SPACES 302, 303, 304 & 306. DO NOT CLOSE CEILING AT THESE SPACES. AT OTHER SPACES OK TO PLACE ACT WHEN READY.
Above Ceiling Inspection Passed 6/10/2014 6/10/2014 at 12:00 AM 06/10/2014
Misc
Resolved
06/10/2014
SMACNA / AIR DIFUSSION COUNCIL / MANUFACTURER'S INSTRUCTIONS > INSTALLATION OF HVAC FLEXIBLE DUCT OR CONNECTORS: CLAMPS & TAPING OF INNER AND OUTER LAYER MUST BE PER INSTRUCTIONS. NON-METALLIC CLAMPS OK ONLY WITH BEADED FITTINGS. LEAVE TILE OUT AT EACH LOCATION WHERE FLEX DUCT OR CONNECTORS ARE INSTALLED. REMOVE ANY ABANDONED FLEX AND CAP HARD PIPE.
Misc
Resolved
06/10/2014
ISSUE #1 YET TO BE CORRECTED AT SPACES 302, 303, 304 & 306. DO NOT CLOSE CEILING AT THESE SPACES. AT OTHER SPACES OK TO PLACE ACT WHEN READY.
Miscellaneous Inspection Passed 6/11/2014 at 12:00 AM 06/11/2014
Occupancy Inspection - Codes Commercial Full C of O 6/12/2014 6/12/2014 at 12:00 AM 06/12/2014
Alarm Test Passed 6/12/2014 at 12:00 AM 06/12/2014
Occupancy Inspection - Fire Passed 6/12/2014 6/12/2014 at 12:00 AM 06/12/2014
Documents & Images
Date Uploaded File Type Document Name
03/27/2014 Letter Fire Building Plan Review
03/28/2014 Letter Codes P/R Corrections Document
04/15/2014 Letter Codes Plan Review Conditions
04/15/2014 Letter Codes Building Permit
05/14/2014 Letter Fire (Sprinkler) Plan Review
05/15/2014 Letter Inspection Summary
05/16/2014 Letter Inspection Summary
05/19/2014 Letter Inspection Summary
06/03/2014 Letter Inspection Summary
06/03/2014 Letter arch
06/04/2014 Letter Inspection Summary
06/10/2014 Letter Inspection Summary
06/12/2014 Letter Field Certificate of Occupancy
06/13/2014 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home