Permit Application Status

PRCOM20130305


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20130305
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT MISSOURI
ADDITION COMMERCIAL
POLICE DEPARTMENT ADDITION AND RENOVATION - OCCUPANCY TYPES ARE A-2, I-3 AND S-2
03/05/2013
04/11/2013
09/15/2013
05/09/2014
Locations
Contacts
TREANOR ARCHITECTS PA , Address:1040 VERMONT STREET, Phone:(785) 342-4858  
TITAN BUILT LLC, Address:11865 S CONLEY ST, Phone:(913) 782-6700  
EDWARDS MCDOWELL INC, Address:400 E 10TH AVE, Phone:(816) 221-7878  
S & S ELECTRICAL CONTRACTING LLC, Address:574 NW 1921 RD, Phone:(816) 847-2433  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
CITY OF LEES SUMMIT MISSOURI, Address:207 SW MARKET ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 01/16/2014
Brian Austerman
Misc
Corrective Action Required
01/16/2014

Sequence of operation not shown, to be verified at alarm testing. Duct detectors shall transmit a supervisory signal to the panel and shut down unit. Tampers will transmit a trouble signal to the panel.
Misc
Corrective Action Required
01/16/2014

Call 816-969-1300 to schedule alarm testing
Sprinkler Plan Review Released for Construction 09/17/2013
Brian Austerman
Fire protection equipment identification
Corrective Action Required
09/17/2013

2006 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. Control valves and drains shall be marked if not visible
Installation acceptance testing
Corrective Action Required
09/17/2013

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule hydrostatic and flow testing
Misc
Corrective Action Required
09/17/2013

If exits have been extended that had previously had a standpipe at that exit, the standpipe shall be extended to the new exit
Final Development Plan Review Approved 04/30/2013 04/24/2013
Mike Weisenborn
Building Plan Review Approved with Conditions 04/05/2013 04/10/2013
Mike Weisenborn
Bldg - Special inspections - Statement of special inspections
Corrective Action Required
04/02/2013

2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional. Action required - Provide a statement of special inspections from the company contracted to perform the work.
Bldg - Special inspections - Report requirement
Corrective Action Required
04/02/2013

2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work. Action required - This comment is for information purposes.
Misc
Resolved
04/05/2013

An assembly listing is not provided for wall Type A. Action required - Provide the assembly to be used. Mike Weisenborn 04/05/2013 8:45 AM - Information has been added to the plans.
Bldg - Vertical exit enclosures - When required
Resolved
04/05/2013

2006 IBC 1020.1 - Enclosures required. Interior exit stairways and interior exit ramps shall be enclosed with fire barriers constructed in accordance with Section 706 or horizontal assemblies constructed in accordance with Section 711, or both. Exit enclosures shall have a fire-resistance rating of not less than 2 hours where connecting four stories or more and not less than 1 hour where connecting less than four stories. The number of stories connected by the exit enclosure shall include any basements but not any mezzanines. An exit enclosure shall not be used for any purpose other than means of egress. (See code book for possible exceptions.) Action required - Exception 7 of this code section allows for an un-enclosed stairway if the building is sprinkled, not an H or I occupancy and remote exits are provided from both levels. Although there is an I occupancy in the building, the stair is not located within the occupancy and it is not used as a means of egress from the I. It is my oppinion that the stairway is not required to be rated and the notation can be removed from the plans. If it is to remain rated, door A112a is required to be a 60 minute door and the floor/ceiling in corridor A112 must be rated as they are part of the exit enclosure. Make needed corrections. Mike Weisenborn 04/05/2013 8:47 AM - The rating on the stair has been removed.
Bldg - Posting of occupant load
Corrective Action Required
04/02/2013

2006 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required - The occupant load shall be posted in the classrooms. The occupant load of classroom A and B as will as the occupant load when the divider is open shall be posted. This will be verified on inspection.
Misc
Resolved
04/05/2013

2006 IBC - 508.3.3.4.1 - Construction - Required separations shall be fire barriers constructed in accordance with Section 706 or horizontal assemblies constructed in accordance with Section 711, or both, so as to completely separate adjacent occupancies. Action required - The plans indicate a fire barriers between the B and A-3 occupancies but on the same level but information on the horizontal assembly between the B and A-3 occupancies on different levels is not provided. Provide additional information. Mike Weisenborn 04/05/2013 8:47 AM - Additional information has been added to the plans.
Bldg - Means of egress illumination - Emergency power
Resolved
04/05/2013

2006 IBC 1006.3 - Illumination emergency power. The power supply for means of egress illumination shall normally be provided by the premises electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate the following areas. 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, exit enclosures and exit passageways in building required to have two or more exits. 3. Exterior egress components at other than the level of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1024.1, in buildings required to have two or more exits. 5. Exterior landings, as required by Section 1008.1.5, for exit discharge doorways in building required to have two or more exits. The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 2702. Action required - I can not tell if the required emergency lighting on the exterior of the building at the egress points is being provided. Please provide additional information. Mike Weisenborn 04/05/2013 8:49 AM - Exterior lighting is on the emergency generator.
Bldg - Accessibility - Toilet and bathing facilities
Resolved
04/05/2013

2006 IBC 1109.2 - Toilet and bathing facilities. Toilet rooms and bathing facilities shall be accessible. Where a floor level is not required to be connected by an accessible route, the only toilet rooms or bathing facilities provided within the facility shall not be located on the inaccessible floor. At least one of each type of fixture, element, control or dispenser in each accessible toilet room and bathing facility shall be accessible. Action required - Toilet B120 is not accessible. Make needed corrections. Mike Weisenborn 04/05/2013 8:50 AM - Not required per Section 1103.2.13.
Bldg - Stairways - Profile
Resolved
04/05/2013

2006 IBC 1009.3.3 - Profile. The radius of curvature at the leading edge of the tread shall be not greater than 0.5 inch. Beveling of nosings shall not exceed 0.5 inch. Risers shall be solid and vertical or sloped from the underside of the leading edge of the tread above at an angle not more than 30 degrees from the vertical. The leading edge (nosings) of treads shall project not more than 1.25 inches beyond the tread below and all projections of the leading edges shall be of uniform size, including the leading edge of the floor at the top of a flight. Action required - The stairs do not meet the requirement for closed risers. Make needed corrections. Mike Weisenborn 04/05/2013 8:50 AM - Corrections have been made.
Bldg - Guards - Opening limitations
Resolved
04/05/2013

2006 IBC 1013.3 - Opening limitations. Open guards shall have balusters or ornamental patterns such that a 4-inch-diameter sphere cannot pass through any opening up to a height or 34 inches. From a height of 34 inches to 42 inches above the adjacent walking surfaces, a sphere 8 inches in diameter shall not pass. (See exceptions provided in the code.) Action required - I am unable to locate information showing compliance with this section for 32 3119.13A Decorateive metal security fence. Provide additional information. Mike Weisenborn 04/05/2013 8:52 AM - Addtional information has been provided.
Bldg - Toilet rooms - Walls
Resolved
04/05/2013

2006 IBC 1210.2 - Walls. Walls within 2 feet of urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. Exceptions: 1. Dwelling units and sleeping units. 2. Toilet rooms that are not accessible to the public and which have not more than one water closet. Accessories such as grab bars, towel bars, paper dispensers and soap dishes, provided on or within walls, shall be installed and sealed to protect structural elements from moisture. Action required - If paint is to be used in these areas of the restrooms and the cells it must be an epoxy paint. Make needed corrections. Mike Weisenborn 04/05/2013 8:52 AM - Additional information has been provided.
Bldg - Glazing - Human impact loads
Resolved
04/05/2013

2006 IBC 2406.1 - Human impact loads. Individual glazed areas, including glass mirrors, in hazardous locations as defined in Section 2406.3 shall comply with Sections 2406.1 through 2406.1.4. Action required - Provide additional information showing how this requirement is being met. Mike Weisenborn 04/05/2013 8:53 AM - Additional information has been provided.
Bldg - Elevators - Emergency signs
Corrective Action Required
04/02/2013

2006 IBC 3002.3 - Emergency signs. An approved pictorial sign of a standardized design shall be posted adjacent to each elevator call station on all floors instructing occupants to use the exit stairways, and not to use the elevator in case of fire. The sign shall read: IN FIRE EMERGENCY, DO NOT USE ELEVATOR. USE EXIT STAIRS. The emergency sign shall not be required for elevators that are part of an accessible means of egress complying with Section 1007.4. Action required - This will be verified on inspection.
Elevator Equipment Permit
Corrective Action Required
04/02/2013

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required - This comment is for information purposes.
Misc
Resolved
04/05/2013

I am unable to locate smoke development and flame spread information on the ballistic material used in the firing range. Action required - Provide additional informaiton. Mike Weisenborn 04/05/2013 8:54 AM - Additional information has been provided.
Licensed Contractors Approved 04/30/2013 04/10/2013
Mike Weisenborn
Business License
Resolved
04/10/2013

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required - Provide the name of the licensed general contractor for the project. A minimum of a Class B license is required. This information is required for permit approval.
License contractors
Resolved
04/10/2013

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required - Provide the name of the licensed mechanical, electrical and plumbing contractors. This information is required for permit approval.
Fire Plan Review Approved with Conditions 04/05/2013 04/04/2013
Brian Austerman
Construction documents - Fire protection systems
Corrective Action Required
04/02/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide plans for approval for the sprinkler system Acknowledged 4/4/13
Construction documents for fire alarm systems
Corrective Action Required
04/02/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval Acknowleged 4/4/13
Misc
Corrective Action Required
04/02/2013

1411.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities. Exiting shall be maintained during construction Acknowleged 4/4/13
Portable fire extinguishers - general
Corrective Action Required
04/02/2013

2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a 2A10B:C Extinguisher in the sally port, verified at inspection Added 4/4/13
Knox box required
Corrective Action Required
04/02/2013

2006 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Provide a knox box system on the gates for Fire Department access. Call 969-1300 for a knox box application Acknowleged 4/4/13
Misc
Corrective Action Required
04/02/2013

3304.3.1 High explosives. Explosive materials classified as Division 1.1 or 1.2 or formerly classified as Class A by the U.S. Department of Transportation shall be stored in Type 1, 2 or 3 magazines. Exceptions: 1. Black powder shall be stored in a Type 1, 2, 3 or 4 magazine. 2. Cap-sensitive explosive material that is demonstrated not to be bullet sensitive, shall be stored in a Type 1, 2, 3, 4 or 5 magazine. Will coordinate with LSPD, 4/4/13
Misc
Corrective Action Required
04/02/2013

3304.3 Magazines. The storage of explosives and explosive materials in magazines shall comply with Table 3304.3. Action Required: Storage of explosives shall comply with chapter 33 of the international fire code 2006 ed. For information only Will coordinate with LSPD 4/4/13
Misc
Corrective Action Required
04/02/2013

Provide card access in the knox box for fire department access use in non-detention areas. Acknowledged 4/4/13
Misc
Corrective Action Required
04/02/2013

Access controlled doors shall comply with NFPA 101 chapter 22, 2002 ed. 22.2.11.9- All remote-control release-operated doors shall be provided with a redundant means of operation as follows: (1) Power-operated sliding doors or power operated locks shall be constructed so that, in the event of power failure, a manual mechanical means to release and open the doors is provided at each door, and either emergency power arrainged in accordance with 7.9.2.3 is provided for the power operation or a remote-control manual mechanical release is provided. (2) Mechanically operated sliding doors or mechanically operated locks shall be provided with a manual mechanical means at each door to release and open the door For information only Addressed in resub 4/4/13
Building Plan Review Rejected 03/19/2013 03/19/2013
Mike Weisenborn
Bldg - Special inspections - Statement of special inspections
Corrective Action Required
03/19/2013

2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional. Action required - Provide a statement of special inspections from the company contracted to perform the work.
Bldg - Special inspections - Report requirement
Corrective Action Required
03/19/2013

2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work. Action required - This comment is for information purposes.
Misc
Corrective Action Required
03/19/2013

An assembly listing is not provided for wall Type A. Action required - Provide the assembly to be used.
Bldg - Vertical exit enclosures - When required
Corrective Action Required
03/19/2013

2006 IBC 1020.1 - Enclosures required. Interior exit stairways and interior exit ramps shall be enclosed with fire barriers constructed in accordance with Section 706 or horizontal assemblies constructed in accordance with Section 711, or both. Exit enclosures shall have a fire-resistance rating of not less than 2 hours where connecting four stories or more and not less than 1 hour where connecting less than four stories. The number of stories connected by the exit enclosure shall include any basements but not any mezzanines. An exit enclosure shall not be used for any purpose other than means of egress. (See code book for possible exceptions.) Action required - Exception 7 of this code section allows for an un-enclosed stairway if the building is sprinkled, not an H or I occupancy and remote exits are provided from both levels. Although there is an I occupancy in the building, the stair is not located within the occupancy and it is not used as a means of egress from the I. It is my oppinion that the stairway is not required to be rated and the notation can be removed from the plans. If it is to remain rated, door A112a is required to be a 60 minute door and the floor/ceiling in corridor A112 must be rated as they are part of the exit enclosure. Make needed corrections.
Bldg - Posting of occupant load
Corrective Action Required
03/19/2013

2006 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required - The occupant load shall be posted in the classrooms. The occupant load of classroom A and B as will as the occupant load when the divider is open shall be posted. This will be verified on inspection.
Misc
Corrective Action Required
03/19/2013

2006 IBC - 508.3.3.4.1 - Construction - Required separations shall be fire barriers constructed in accordance with Section 706 or horizontal assemblies constructed in accordance with Section 711, or both, so as to completely separate adjacent occupancies. Action required - The plans indicate a fire barriers between the B and A-3 occupancies but on the same level but information on the horizontal assembly between the B and A-3 occupancies on different levels is not provided. Provide additional information.
Bldg - Means of egress illumination - Emergency power
Corrective Action Required
03/19/2013

2006 IBC 1006.3 - Illumination emergency power. The power supply for means of egress illumination shall normally be provided by the premises electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate the following areas. 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, exit enclosures and exit passageways in building required to have two or more exits. 3. Exterior egress components at other than the level of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1024.1, in buildings required to have two or more exits. 5. Exterior landings, as required by Section 1008.1.5, for exit discharge doorways in building required to have two or more exits. The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 2702. Action required - I can not tell if the required emergency lighting on the exterior of the building at the egress points is being provided. Please provide additional information.
Bldg - Accessibility - Toilet and bathing facilities
Corrective Action Required
03/19/2013

2006 IBC 1109.2 - Toilet and bathing facilities. Toilet rooms and bathing facilities shall be accessible. Where a floor level is not required to be connected by an accessible route, the only toilet rooms or bathing facilities provided within the facility shall not be located on the inaccessible floor. At least one of each type of fixture, element, control or dispenser in each accessible toilet room and bathing facility shall be accessible. Action required - Toilet B120 is not accessible. Make needed corrections.
Bldg - Stairways - Profile
Corrective Action Required
03/19/2013

2006 IBC 1009.3.3 - Profile. The radius of curvature at the leading edge of the tread shall be not greater than 0.5 inch. Beveling of nosings shall not exceed 0.5 inch. Risers shall be solid and vertical or sloped from the underside of the leading edge of the tread above at an angle not more than 30 degrees from the vertical. The leading edge (nosings) of treads shall project not more than 1.25 inches beyond the tread below and all projections of the leading edges shall be of uniform size, including the leading edge of the floor at the top of a flight. Action required - The stairs do not meet the requirement for closed risers. Make needed corrections.
Bldg - Guards - Opening limitations
Corrective Action Required
03/19/2013

2006 IBC 1013.3 - Opening limitations. Open guards shall have balusters or ornamental patterns such that a 4-inch-diameter sphere cannot pass through any opening up to a height or 34 inches. From a height of 34 inches to 42 inches above the adjacent walking surfaces, a sphere 8 inches in diameter shall not pass. (See exceptions provided in the code.) Action required - I am unable to locate information showing compliance with this section for 32 3119.13A Decorateive metal security fence. Provide additional information.
Bldg - Toilet rooms - Walls
Corrective Action Required
03/19/2013

2006 IBC 1210.2 - Walls. Walls within 2 feet of urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. Exceptions: 1. Dwelling units and sleeping units. 2. Toilet rooms that are not accessible to the public and which have not more than one water closet. Accessories such as grab bars, towel bars, paper dispensers and soap dishes, provided on or within walls, shall be installed and sealed to protect structural elements from moisture. Action required - If paint is to be used in these areas of the restrooms and the cells it must be an epoxy paint. Make needed corrections.
Bldg - Glazing - Human impact loads
Corrective Action Required
03/19/2013

2006 IBC 2406.1 - Human impact loads. Individual glazed areas, including glass mirrors, in hazardous locations as defined in Section 2406.3 shall comply with Sections 2406.1 through 2406.1.4. Action required - Provide additional information showing how this requirement is being met.
Bldg - Elevators - Emergency signs
Corrective Action Required
03/19/2013

2006 IBC 3002.3 - Emergency signs. An approved pictorial sign of a standardized design shall be posted adjacent to each elevator call station on all floors instructing occupants to use the exit stairways, and not to use the elevator in case of fire. The sign shall read: IN FIRE EMERGENCY, DO NOT USE ELEVATOR. USE EXIT STAIRS. The emergency sign shall not be required for elevators that are part of an accessible means of egress complying with Section 1007.4. Action required - This will be verified on inspection.
Elevator Equipment Permit
Corrective Action Required
03/19/2013

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required - This comment is for information purposes.
Misc
Corrective Action Required
03/19/2013

I am unable to locate smoke development and flame spread information on the ballistic material used in the firing range. Action required - Provide additional informaiton.
Fire Plan Review Approved with Conditions 03/19/2013 03/13/2013
Brian Austerman
Construction documents - Fire protection systems
Corrective Action Required
03/13/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide plans for approval for the sprinkler system
Construction documents for fire alarm systems
Corrective Action Required
03/13/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval
Misc
Corrective Action Required
03/13/2013

1411.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities. Exiting shall be maintained during construction
Portable fire extinguishers - general
Corrective Action Required
03/13/2013

2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a 2A10B:C Extinguisher in the sally port, verified at inspection
Knox box required
Corrective Action Required
03/13/2013

2006 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Provide a knox box system on the gates for Fire Department access. Call 969-1300 for a knox box application
Misc
Corrective Action Required
03/13/2013

3304.3.1 High explosives. Explosive materials classified as Division 1.1 or 1.2 or formerly classified as Class A by the U.S. Department of Transportation shall be stored in Type 1, 2 or 3 magazines. Exceptions: 1. Black powder shall be stored in a Type 1, 2, 3 or 4 magazine. 2. Cap-sensitive explosive material that is demonstrated not to be bullet sensitive, shall be stored in a Type 1, 2, 3, 4 or 5 magazine.
Misc
Corrective Action Required
03/13/2013

3304.3 Magazines. The storage of explosives and explosive materials in magazines shall comply with Table 3304.3. Action Required: Storage of explosives shall comply with chapter 33 of the international fire code 2006 ed. For information only
Misc
Corrective Action Required
03/13/2013

Provide card access in the knox box for fire department access use in non-detention areas.
Misc
Corrective Action Required
03/13/2013

Access controlled doors shall comply with NFPA 101 chapter 22, 2002 ed. 22.2.11.9- All remote-control release-operated doors shall be provided with a redundant means of operation as follows: (1) Power-operated sliding doors or power operated locks shall be constructed so that, in the event of power failure, a manual mechanical means to release and open the doors is provided at each door, and either emergency power arrainged in accordance with 7.9.2.3 is provided for the power operation or a remote-control manual mechanical release is provided. (2) Mechanically operated sliding doors or mechanically operated locks shall be provided with a manual mechanical means at each door to release and open the door For information only
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $21,337.80 $21,337.80 Paid 04/11/2013
$21,337.80
8331507-Sewer Connection Fee $630.00 $630.00 Paid 04/11/2013
$630.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Failed 5/23/2013 (1:30) 5/23/2013 at 12:00 AM 05/23/2013
Misc
Corrective Action Required
05/23/2013
FOOTING PREP ON (E) FROM (11) TO (13) NOT APPROVED. 3" CLEARANCE FROM RE-BAR TO DIRT NOT PROVIDED.
Footing Inspection - Commercial Partial 5/23/2013 (2:15) 5/23/2013 at 12:00 AM 05/23/2013
Misc
Partial Correction
05/23/2013
OK TO POUR WHEN READY FOOTING ON (E) FROM (11) TO (13) + 8' RETURNS AT EA END;
Footing Inspection - Commercial Partial 5/24/2013 (2:30) 5/24/2013 at 12:00 AM 05/24/2013
Misc
Partial Correction
05/24/2013
OK TO POUR WHEN READY WALL FOOTINGS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PRVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5);
Underslab Plumbing Inspection - Commercial Partial 5/29/2013 5/29/2013 at 12:00 AM 05/29/2013
Misc
Partial Correction
05/29/2013
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT FOLLOWING LOCATIONS: (K.9) TO (N.1) x (5.6) TO (6.2); NOTE IPC 312 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Footing Inspection - Commercial Partial 5/29/2013 (4:00) 5/29/2013 at 12:00 AM 05/29/2013
Misc
Partial Correction
05/24/2013
OK TO POUR WHEN READY WALL FOOTINGS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PRVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5);
Footing Inspection - Commercial Partial 6/6/2013 (9:00) 6/6/2013 at 12:00 AM 06/06/2013
Misc
Partial Correction
05/29/2013
OK TO POUR WHEN READY WALL FOOTINGS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PRVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5);
Misc
Partial Correction
06/06/2013
OK TO POUR WHEN READY ELEVATOR PIT SLAB
Footing Inspection - Commercial Partial 6/7/2013 (1:00) 6/7/2013 at 12:00 AM 06/07/2013
Misc
Partial Correction
06/06/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PRVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7;
Misc
Partial Correction
06/06/2013
OK TO POUR WHEN READY ELEVATOR PIT SLAB
Foundation Inspection - Commercial Partial 6/10/2013 at 12:00 AM 06/10/2013
Misc
Partial Correction
06/10/2013
OK TO POUR WHEN READY ELEVATOR PIT WALLS
Footing Inspection - Commercial Partial 6/11/2013 (1:00) 6/11/2013 at 12:00 AM 06/11/2013
Misc
Partial Correction
06/07/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PRVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A);
Misc
Resolved
06/11/2013
OK TO POUR WHEN READY ELEVATOR PIT SLAB
Misc
Partial Correction
06/11/2013
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2;
Concrete Walls and Columns Inspection Partial 6/14/2013 at 12:00 AM 06/14/2013
Misc
Partial Correction
06/14/2013
PREPARATION TO POUR C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6 -- OK TO CLOSE FORMS WHEN READY;
Concrete Walls and Columns Inspection Partial 6/17/2013 at 12:00 AM 06/17/2013
Misc
Partial Correction
06/14/2013
PREPARATION TO POUR C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6 -- OK TO CLOSE FORMS WHEN READY;
Concrete Walls and Columns Inspection Partial 6/18/2013 at 12:00 AM 06/18/2013
Misc
Partial Correction
06/17/2013
PREPARATION TO POUR C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6 -- OK TO CLOSE FORMS WHEN READY;
Concrete Walls and Columns Inspection Partial 6/19/2013 at 12:00 AM 06/19/2013
Misc
Partial Correction
06/18/2013
PREPARATION TO POUR C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6 -- OK TO CLOSE FORMS WHEN READY;
Concrete Walls and Columns Inspection Partial 6/21/2013 at 12:00 AM 06/21/2013
Misc
Partial Correction
06/19/2013
PREPARATION TO POUR C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6 -- OK TO CLOSE FORMS WHEN READY;
Underslab Plumbing Inspection - Commercial Partial 6/24/2013 6/24/2013 at 12:00 AM 06/24/2013
Misc
Partial Correction
06/24/2013
OK TO COVER WHEN READY FOLLOWING PORTIONS OF UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING: H.6/7.3 TO H.6/7.1 TO F.7/7.1 TO F.7/7.9; NOTE IPC 312 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Misc
Partial Correction
06/24/2013
OK TO COVER WHEN READY FOLLOWING PORTIONS OF UNDER-SLAB STORM DRAIN PIPING: J.15/7.4 TO J.15/7.1 TO F.7/7.1 TO F.7/7.9; NOTE IPC 312 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Concrete Walls and Columns Inspection Partial 6/25/2013 at 12:00 AM 06/25/2013
Misc
Partial Correction
06/21/2013
PREPARATION TO POUR C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6 -- OK TO CLOSE FORMS WHEN READY; 11/C.6 TO 11/B.7 + G.8/7.1 TO G.8/8 TO C.55/11 + G.8/8 TO 10/B.7;
Footing Inspection - Commercial Partial 6/26/2013 (9:00) 6/26/2013 at 12:00 AM 06/26/2013
Misc
Partial Correction
06/11/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PRVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A); 11/B.4 TO A/11 TO A/12.7;
Misc
Partial Correction
06/11/2013
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2;
Concrete Walls and Columns Inspection Partial 6/26/2013 at 12:00 AM 06/26/2013
Misc
Partial Correction
06/25/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; 11/C.6 TO 11/B.7 + G.8/7.1 TO G.8/8 TO C.55/11 + G.8/8 TO 10/B.7;
Footing Inspection - Commercial Partial 6/27/2013 6/27/2013 at 12:00 AM 06/27/2013
Misc
Partial Correction
06/26/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PREVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A); 11/B.4 TO A/11 TO A/12.7; A/12.7 TO A/13 TO 13/B.45;
Misc
Partial Correction
06/26/2013
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2;
Concrete Walls and Columns Inspection Partial 6/28/2013 at 12:00 AM 06/28/2013
Misc
Partial Correction
06/26/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11 + G.8/10 TO 10/B.7;
Concrete Walls and Columns Inspection Partial 7/2/2013 at 12:00 AM 07/02/2013
Misc
Partial Correction
06/28/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11 + G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5 + 10/B.7 TO 10/B.4 TO 11/B.4;
Concrete Walls and Columns Inspection Partial 7/3/2013 at 12:00 AM 07/03/2013
Misc
Partial Correction
07/02/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11 + G.8/10 TO 10/B.7; PENDING :11/C.6 TO 11/A.5 + 10/B.7 TO 10/B.4 TO 11/B.4;
Concrete Walls and Columns Inspection Partial 7/8/2013 at 12:00 AM 07/08/2013
Misc
Partial Correction
07/03/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4;
Concrete Walls and Columns Inspection Partial 7/9/2013 at 12:00 AM 07/09/2013
Misc
Partial Correction
07/08/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 E/13 TO 13/XXX;
Concrete Walls and Columns Inspection Partial 7/10/2013 at 12:00 AM 07/10/2013
Misc
Partial Correction
07/09/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 E/13 TO 13/D.5;
Concrete Walls and Columns Inspection Partial 7/10/2013 at 12:00 AM 07/10/2013
Misc
Partial Correction
07/10/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 TO E/13 TO 13/D.5;
Concrete Walls and Columns Inspection Partial 7/15/2013 at 12:00 AM 07/15/2013
Misc
Partial Correction
07/10/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 TO E/13 TO 13/D.5; PENDING: 11/A.5 TO A/11 TO A/13 TO 13/A.4;
Concrete Walls and Columns Inspection Partial 7/16/2013 at 12:00 AM 07/16/2013
Misc
Partial Correction
07/15/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 TO E/13 TO 13/D.5; 11/A.5 TO A/11 TO A/13 TO 13/A.5; PENDING:
Concrete Walls and Columns Inspection Partial 7/17/2013 at 12:00 AM 07/17/2013
Misc
Partial Correction
07/16/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 TO E/13 TO 13/D.5; 11/A.5 TO A/11 TO A/13 TO 13/A.5; PENDING:
Concrete Walls and Columns Inspection Partial 7/22/2013 at 12:00 AM 07/22/2013
Misc
Partial Correction
07/17/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 TO E/13 TO 13/D.5; 11/A.5 TO A/11 TO A/13 TO 13/A.5; PENDING: 13/A.5 TO 13/D.4 TO COMLETE N MAIN WALL;
Concrete Walls and Columns Inspection Partial 7/23/2013 at 12:00 AM 07/23/2013
Misc
Partial Correction
07/22/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 TO E/13 TO 13/D.5; 11/A.5 TO A/11 TO A/13 TO 13/A.5; PENDING: 13/A.5 TO 13/D.4 TO COMLETE N MAIN WALL;
Concrete Walls and Columns Inspection Partial 7/24/2013 at 12:00 AM 07/24/2013
Misc
Partial Correction
07/23/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 TO E/13 TO 13/D.5; 11/A.5 TO A/11 TO A/13 TO 13/A.5; 13/A.5 TO 13/D.4 TO COMLETE N MAIN WALL;
Underslab Electrical Inspection - Commercial Partial 7/30/2013 7/30/2013 at 12:00 AM 07/30/2013
Misc
Partial Correction
07/30/2013
OK TO COVER WHEN READY UNDER-SLAB ELECTRICAL CONDUIT FROM (11) TO (13) ON ~(D.4);
Underslab Electrical Inspection - Commercial Partial 7/30/2013 at 12:00 AM 07/30/2013
Misc
Partial Correction
07/30/2013
OK TO COVER WHEN READY THREE 3" PVC SCH 40 UNDER-SLAB ELECTRICAL CONDUITS FROM (11) TO (13) ON ~(D.4);
Footing Inspection - Commercial Not Ready 7/31/2013 (11:00) 7/31/2013 at 12:00 AM 07/31/2013
Misc
Partial Correction
06/27/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PREVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A); 11/B.4 TO A/11 TO A/12.7; A/12.7 TO A/13 TO 13/B.45;
Misc
Partial Correction
06/27/2013
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2;
Footing Inspection - Commercial Partial 8/5/2013 at 12:00 AM 08/05/2013
Misc
Partial Correction
07/31/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PREVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A); 11/B.4 TO A/11 TO A/12.7; A/12.7 TO A/13 TO 13/B.45; -E/13 TO F/13; L.8/9 TO N.4/9; N.4/8 TO N.4/9
Misc
Partial Correction
07/31/2013
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2;
Footing Inspection - Commercial Partial 8/8/2013 (11:30) 8/8/2013 at 12:00 AM 08/08/2013
Misc
Partial Correction
08/05/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PREVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A); 11/B.4 TO A/11 TO A/12.7; A/12.7 TO A/13 TO 13/B.45; -E/13 TO F/13; L.8/9 TO N.4/9; N.4/8 TO N.4/9 -AREA B/C: N.1/5.7 TO P/7.6
Misc
Partial Correction
08/05/2013
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2;
Footing Inspection - Commercial Partial 8/9/2013 (2:00) 8/9/2013 at 12:00 AM 08/09/2013
Misc
Partial Correction
08/08/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PREVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A); 11/B.4 TO A/11 TO A/12.7; A/12.7 TO A/13 TO 13/B.45; E/13 TO F/13; L.8/9 TO N.4/9; N.4/8 TO N.4/9; AREA B/C: N.1/5.7 TO P/7.6; [6/P.2 TO 7/P.2; 6/N.1 TO 6/N.8; COMPLETION OF SE CRNR G.B. + G.B. SECT 14/S101B ON N.1 + S 8'x4' COLUMN FTG (OVER-DUG DUE TO SOIL CONDITION);
Misc
Partial Correction
08/08/2013
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2;
Footing Inspection - Commercial Partial 8/13/2013 (1:00) 8/13/2013 at 12:00 AM 08/13/2013
Misc
Partial Correction
08/09/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PREVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A); 11/B.4 TO A/11 TO A/12.7; A/12.7 TO A/13 TO 13/B.45; E/13 TO F/13; L.8/9 TO N.4/9; N.4/8 TO N.4/9; AREA B/C: N.1/5.7 TO P/7.6; [6/P.2 TO 7/P.2; 6/N.1 TO 6/N.8; COMPLETION OF SE CRNR G.B. + G.B. SECT 14/S101B ON N.1 + S 8'x4' DEEP FTG (OVER-DUG DUE TO SOIL CONDITION); 7.1/N.1 TO 7.1/P; N.7/7 TO N.7/6; 6.3/N.7 TO 6.3/N.1; 8'x4' DEEP FTG @ 6.3/N.1; REMAINDER OF SECT 11/S101B FTGS @ ELEV PIT;
Misc
Partial Correction
08/09/2013
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2;
Footing Inspection - Commercial Partial 8/14/2013 (1:00) 8/14/2013 at 12:00 AM 08/14/2013
Misc
Partial Correction
08/13/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PREVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A); 11/B.4 TO A/11 TO A/12.7; A/12.7 TO A/13 TO 13/B.45; E/13 TO F/13; L.8/9 TO N.4/9; N.4/8 TO N.4/9; AREA B/C: N.1/5.7 TO P/7.6; [6/P.2 TO 7/P.2; 6/N.1 TO 6/N.8; COMPLETION OF SE CRNR G.B. + G.B. SECT 14/S101B ON N.1 + S 8'x4' DEEP FTG (OVER-DUG DUE TO SOIL CONDITION); 7.1/N.1 TO 7.1/P; N.7/7 TO N.7/6; 6.3/N.7 TO 6.3/N.1; 8'x4' DEEP FTG @ 6.3/N.1; REMAINDER OF SECT 11/S101B FTGS @ ELEV PIT; 7.2/L.8 TO 7.2/P; P/7.5 TO 7.9/P TO N.4/7.9 TO N.4/8.1;
Misc
Partial Correction
08/13/2013
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2;
Footing Inspection - Commercial Partial 8/15/2013 (10:30) 8/15/2013 at 12:00 AM 08/15/2013
Misc
Partial Correction
08/14/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PREVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A); 11/B.4 TO A/11 TO A/12.7; A/12.7 TO A/13 TO 13/B.45; E/13 TO F/13; L.8/9 TO N.4/9; N.4/8 TO N.4/9; AREA B/C: N.1/5.7 TO P/7.6; [6/P.2 TO 7/P.2; 6/N.1 TO 6/N.8; COMPLETION OF SE CRNR G.B. + G.B. SECT 14/S101B ON N.1 + S 8'x4' DEEP FTG (OVER-DUG DUE TO SOIL CONDITION); 7.1/N.1 TO 7.1/P; N.7/7 TO N.7/6; 6.3/N.7 TO 6.3/N.1; 8'x4' DEEP FTG @ 6.3/N.1; REMAINDER OF SECT 11/S101B FTGS @ ELEV PIT; 7.2/L.8 TO 7.2/P; P/7.5 TO 7.9/P TO N.4/7.9 TO N.4/8.1;
Misc
Partial Correction
08/14/2013
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2; F.1/11.8; F.2/12 OVER-DUG DUE TO SOIL CONDITION
Underslab Plumbing Inspection - Commercial Partial 8/16/2013 at 12:00 AM 08/16/2013
Misc
Partial Correction
06/24/2013
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT FOLLOWING LOCATIONS: (K.9) TO (N.1) x (5.6) TO (6.2); 6" PVC ST & 4" PVC SAN PER PR-02 FROM F.5/12.3 N & OFFSET TO F.4 5' OUTSIDE B/L; NOTE IPC 312 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Underslab Plumbing Inspection - Commercial Not Ready 8/20/2013 8/20/2013 at 12:00 AM 08/20/2013
Misc
Partial Correction
08/16/2013
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT FOLLOWING LOCATIONS: (K.9) TO (N.1) x (5.6) TO (6.2); 6" PVC ST & 4" PVC SAN PER PR-02 FROM F.5/12.3 N & OFFSET TO F.4 5' OUTSIDE B/L; NOTE IPC 312 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Misc
Corrective Action Required
08/20/2013
UNDER-SLAB PLUMBING DOES NOT AGREE WITH DRAWINGS
Underslab Electrical Inspection - Commercial Partial 8/20/2013 at 12:00 AM 08/20/2013
Misc
Partial Correction
07/30/2013
OK TO COVER WHEN READY THREE 3" PVC SCH 40 UNDER-SLAB ELECTRICAL CONDUITS FROM (11) TO (13) ON ~(D.4)
Misc
Partial Correction
08/20/2013
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT EAST OF (K); OK TO COVER WHEN READY
Underslab Plumbing Inspection - Commercial Partial 8/21/2013 8/21/2013 at 12:00 AM 08/21/2013
Misc
Partial Correction
08/20/2013
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT FOLLOWING LOCATIONS: (K.9) TO (N.1) x (5.6) TO (6.2); 6" PVC ST & 4" PVC SAN PER PR-02 FROM F.5/12.3 N & OFFSET TO F.4 5' OUTSIDE B/L; AREA B AND LOWER LIFT @ AREA C PER PR#2 MODIFICATIONS; NOTE IPC 312 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Misc
Resolved
08/21/2013
UNDER-SLAB PLUMBING DOES NOT AGREE WITH DRAWINGS
Underslab Electrical Inspection - Commercial Partial 8/21/2013 8/21/2013 at 12:00 AM 08/21/2013
Misc
Resolved
08/21/2013
OK TO COVER WHEN READY THREE 3" PVC SCH 40 UNDER-SLAB ELECTRICAL CONDUITS FROM (11) TO (13) ON ~(D.4)
Misc
Resolved
08/21/2013
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT EAST OF (K); OK TO COVER WHEN READY
Misc
Partial Correction
08/21/2013
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: AREA B
Underslab Plumbing Inspection - Commercial Partial 8/28/2013 8/28/2013 at 12:00 AM 08/28/2013
Misc
Partial Correction
08/21/2013
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT FOLLOWING LOCATIONS: (K.9) TO (N.1) x (5.6) TO (6.2); 6" PVC ST & 4" PVC SAN PER PR-02 FROM F.5/12.3 N & OFFSET TO F.4 5' OUTSIDE B/L; AREA B AND LOWER LIFT @ AREA C PER PR#2 MODIFICATIONS; PIPING FROM TRENCH DRAIN + COMPLETION OF PIPING AT SAND INTERCEPTOR THEN SAN + STORM THRU N WALL FOOTING; NOTE IPC 312 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Underslab Electrical Inspection - Commercial Partial 8/28/2013 8/28/2013 at 12:00 AM 08/28/2013
Misc
Partial Correction
08/21/2013
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: AREA; AREA B FROM (E)TO(L.8)x(7.1)TO13); [111] & [108];
Underslab Electrical Inspection - Commercial Partial 8/29/2013 8/29/2013 at 12:00 AM 08/29/2013
Misc
Partial Correction
08/28/2013
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: AREA; AREA B FROM (E)TO(L.8)x(7.1)TO13); [111] & [108]; AREA C;
Footing Inspection - Commercial Partial 9/5/2013 (1:00) 9/5/2013 at 12:00 AM 09/05/2013
Misc
Partial Correction
08/15/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PREVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A); 11/B.4 TO A/11 TO A/12.7; A/12.7 TO A/13 TO 13/B.45; E/13 TO F/13; L.8/9 TO N.4/9; N.4/8 TO N.4/9; AREA B/C: N.1/5.7 TO P/7.6; [6/P.2 TO 7/P.2; 6/N.1 TO 6/N.8; COMPLETION OF SE CRNR G.B. + G.B. SECT 14/S101B ON N.1 + S 8'x4' DEEP FTG (OVER-DUG DUE TO SOIL CONDITION); 7.1/N.1 TO 7.1/P; N.7/7 TO N.7/6; 6.3/N.7 TO 6.3/N.1; 8'x4' DEEP FTG @ 6.3/N.1; REMAINDER OF SECT 11/S101B FTGS @ ELEV PIT; 7.2/L.8 TO 7.2/P; P/7.5 TO 7.9/P TO N.4/7.9 TO N.4/8.1;
Misc
Partial Correction
08/15/2013
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2; F.1/11.8; F.2/12 OVER-DUG DUE TO SOIL CONDITION
Misc
Partial Correction
09/05/2013
OK TO POUR WHEN READY SECTION (14/S200) MASS FOOTING FROM 11' E OF (A) TO (B);
Footing Inspection - Commercial Partial 9/9/2013 (11:30) 9/9/2013 at 12:00 AM 09/09/2013
Misc
Partial Correction
09/05/2013
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PREVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A); 11/B.4 TO A/11 TO A/12.7; A/12.7 TO A/13 TO 13/B.45; E/13 TO F/13; L.8/9 TO N.4/9; N.4/8 TO N.4/9; AREA B/C: N.1/5.7 TO P/7.6; [6/P.2 TO 7/P.2; 6/N.1 TO 6/N.8; COMPLETION OF SE CRNR G.B. + G.B. SECT 14/S101B ON N.1 + S 8'x4' DEEP FTG (OVER-DUG DUE TO SOIL CONDITION); 7.1/N.1 TO 7.1/P; N.7/7 TO N.7/6; 6.3/N.7 TO 6.3/N.1; 8'x4' DEEP FTG @ 6.3/N.1; REMAINDER OF SECT 11/S101B FTGS @ ELEV PIT; 7.2/L.8 TO 7.2/P; P/7.5 TO 7.9/P TO N.4/7.9 TO N.4/8.1;
Misc
Partial Correction
09/05/2013
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2; F.1/11.8; F.2/12 OVER-DUG DUE TO SOIL CONDITION
Misc
Partial Correction
09/05/2013
OK TO POUR WHEN READY SECTION (14/S200) MASS FOOTING FROM 11' E OF (A) TO (B);
Misc
Partial Correction
09/09/2013
OK TO POUR WHEN READY RETAINING WALL FOOTING SECTIONS 14/S200 & 16/S200 FROM (C) TO (C.3)
Concrete Walls and Columns Inspection Partial 9/10/2013 9/10/2013 at 12:00 AM 09/10/2013
Misc
Partial Correction
07/24/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 TO E/13 TO 13/D.5; 11/A.5 TO A/11 TO A/13 TO 13/A.5; 13/A.5 TO 13/D.4 TO COMPLETE N MAIN WALL;
Misc
Partial Correction
09/10/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE RETAINING WALLS: 9/10/13;
Concrete Walls and Columns Inspection Partial 9/11/2013 at 12:00 AM 09/11/2013
Misc
Partial Correction
09/10/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 TO E/13 TO 13/D.5; 11/A.5 TO A/11 TO A/13 TO 13/A.5; 13/A.5 TO 13/D.4 TO COMPLETE N MAIN WALL;
Misc
Partial Correction
09/10/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE RETAINING WALLS PER SECTIONS 14/S200 & 16/S200 AND WALLS PER SECTION 15/S200
Rough Electrical Inspection - Commercial Partial 9/12/2013 9/12/2013 at 12:00 AM 09/12/2013
Misc
Resolved
09/12/2013
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: AREA; AREA B FROM (E)TO(L.8)x(7.1)TO13); [111] & [108]; AREA C;
Rough Electrical Inspection - Commercial Partial 9/12/2013 at 12:00 AM 09/12/2013
Misc
Partial Correction
09/12/2013
OK TO COVER WHEN READY ELECTRICAL CONDUIT AND BOXES AT FLOATING ISOLATION SOUND MAT AT NEW MAIN LEVEL @ FOLLOWING LOCATIONS: (A) TO (C) x (12) TO (13);
Concrete Walls and Columns Inspection Partial 9/12/2013 at 12:00 AM 09/12/2013
Misc
Partial Correction
09/11/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 TO E/13 TO 13/D.5; 11/A.5 TO A/11 TO A/13 TO 13/A.5; 13/A.5 TO 13/D.4 TO COMPLETE N MAIN WALL;
Misc
Partial Correction
09/11/2013
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE RETAINING WALLS PER SECTIONS 14/S200 & 16/S200 AND WALLS PER SECTION 15/S200
Rough Electrical Inspection - Commercial Partial 9/13/2013 9/13/2013 at 12:00 AM 09/13/2013
Misc
Partial Correction
09/12/2013
OK TO COVER WHEN READY ELECTRICAL CONDUIT AND BOXES AT FLOATING ISOLATION SOUND MAT AT NEW MAIN LEVEL @ (A) TO (C) x (11) TO (13)
Rough Framing Inspection - Commercial Failed 9/26/2013 9/26/2013 at 12:00 AM 09/26/2013
Misc
Corrective Action Required
09/26/2013
LIGHT GAUGE FRAMING @ PARAPET WALLS: SCREW ALL FLANGE CONNECTIONS PER APPROVED ERECTION DRAWINGS.
Rough Framing Inspection - Commercial Partial 9/27/2013 at 12:00 AM 09/27/2013
Misc
Corrective Action Required
09/26/2013
OK TO CVOER WHEN READY LIGHT GAUGE FRAMING @ PARAPET WALLS AT: PERIMETER AT ELEVATION 132'-8";
Rough Framing Inspection - Commercial Partial 9/30/2013 at 12:00 AM 09/30/2013
Misc
Partial Correction
09/30/2013
OK TO CVOER WHEN READY LIGHT GAUGE FRAMING @ PARAPET WALLS AT: PERIMETER AT ELEVATION 132'-8" AND 130'-8"; LOWER WALL 132'-10" AT CLEARSTORY;
Rough Framing Inspection - Commercial Partial 10/7/2013 10/7/2013 at 12:00 AM 10/07/2013
Misc
Partial Correction
09/30/2013
OK TO CVOER WHEN READY LIGHT GAUGE FRAMING @ PARAPET WALLS AT: PERIMETER AT ELEVATION 132'-8" AND 130'-8"; LOWER WALL 132'-10" AT CLEARSTORY; ROOF FACE OF PARAPET WALLS AT ELEVATION 117';
Misc
Corrective Action Required
10/07/2013
CORRECTIONS TO BE MADE AT PARAPET WALLS AT ELEVATION 117': - ALL SLIDE SCREWS MUST AT MID-HEIGHT OF SLOTS; STUDS MUST BE CUT TO ACCOMDATE - NO SCREWS THROUGH BODY OF CLIP TO STUDS
Misc
Corrective Action Required
10/07/2013
SCREW BOTH FLANGES BOTH ENDS OF CRIPPLE STUDS ABOVE DOOR OPENINGS
Rough Framing Inspection - Commercial Partial 10/8/2013 at 12:00 AM 10/08/2013
Misc
Partial Correction
10/07/2013
OK TO CVOER WHEN READY LIGHT GAUGE FRAMING @ PARAPET WALLS AT: PERIMETER AT ELEVATION 132'-8" AND 130'-8"; LOWER WALL 132'-10" AT CLEARSTORY; ROOF FACE OF PARAPET WALLS AT ELEVATION 117';
Misc
Resolved
10/08/2013
CORRECTIONS TO BE MADE AT PARAPET WALLS AT ELEVATION 117': - ALL SLIDE SCREWS MUST AT MID-HEIGHT OF SLOTS; STUDS MUST BE CUT TO ACCOMDATE - NO SCREWS THROUGH BODY OF CLIP TO STUDS
Misc
Corrective Action Required
10/07/2013
SCREW BOTH FLANGES BOTH ENDS OF CRIPPLE STUDS ABOVE DOOR OPENINGS
Underslab Electrical Inspection - Commercial Partial 10/21/2013 10/21/2013 at 12:00 AM 10/21/2013
Misc
Partial Correction
10/18/2013
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: AREA; AREA B FROM (E)TO(L.8)x(7.1)TO13); [111] & [108]; AREA C; BOOKING DESK 105;
Rough Electrical Inspection - Commercial Not Ready 10/31/2013 at 12:00 AM 10/31/2013
Misc
Partial Correction
09/13/2013
OK TO COVER WHEN READY ELECTRICAL CONDUIT AND BOXES AT FLOATING ISOLATION SOUND MAT AT NEW MAIN LEVEL @ (A) TO (C) x (11) TO (13)
Misc
Corrective Action Required
10/31/2013
NO PERSONNEL FOUND ON SITE 10/31. RE-SCHEDULED TO 11/1.
Above Ceiling Inspection Partial 11/1/2013 11/1/2013 at 12:00 AM 11/01/2013
Misc
Partial Correction
11/01/2013
OVERHEAD WATER & DWV PIPING IN AREA "B": ONE UNISTRUT HANGER TO BE INSTALLED; OK TO INSTALL PIPE INSULATION WHEN READY
Rough Electrical Inspection - Commercial Partial 11/1/2013 at 12:00 AM 11/01/2013
Misc
Partial Correction
10/31/2013
OK TO COVER WHEN READY ELECTRICAL CONDUIT AND BOXES AT FLOATING ISOLATION SOUND MAT AT NEW MAIN LEVEL @ (A) TO (C) x (11) TO (13)
Misc
Partial Correction
11/01/2013
NO ISSUES FOUND ON WIRING AND TERMINATIONS IN PANEL MSB2
Rough Electrical Inspection - Commercial Partial 11/12/2013 at 12:00 AM 11/12/2013
Misc
Partial Correction
11/01/2013
OK TO COVER WHEN READY ELECTRICAL CONDUIT AND BOXES AT FLOATING ISOLATION SOUND MAT AT NEW MAIN LEVEL AT AREAS: (A) TO (C) x (11) TO (13); THEATER SEATING AREA A205 INSPECTED BY MH WEEK OF 11/4/2013;
Misc
Partial Correction
11/01/2013
NO ISSUES FOUND ON WIRING AND TERMINATIONS IN PANEL MSB2
Underground Electrical Inspection - Commercial Partial 11/12/2013 at 12:00 AM 11/12/2013
Misc
Partial Correction
11/12/2013
BURIED CONDUIT FOR SITE ELECTRICAL:
Underground Electrical Inspection - Commercial Partial 11/13/2013 at 12:00 AM 11/13/2013
Misc
Partial Correction
11/12/2013
BURIED CONDUIT FOR SITE ELECTRICAL:
Underground Electrical Inspection - Commercial Partial 11/14/2013 at 12:00 AM 11/14/2013
Misc
Partial Correction
11/13/2013
BURIED CONDUIT FOR SITE ELECTRICAL:
In-wall Inspection Failed 11/22/2013 11/22/2013 at 12:00 AM 11/22/2013
Misc
Corrective Action Required
11/22/2013
114a: ENSURE JAMBS ARE SCREWED AT BOTTOM TRACKS; SCREW ALL FLANGE CONNECTIONS AT CRIPPLES ABOVE OPENINGS.
Above Ceiling Inspection Failed 11/22/2013 11/22/2013 at 12:00 AM 11/22/2013
Misc
Partial Correction
11/01/2013
OVERHEAD WATER & DWV PIPING IN AREA "B": ONE UNISTRUT HANGER TO BE INSTALLED; OK TO INSTALL PIPE INSULATION WHEN READY
Misc
Corrective Action Required
11/22/2013
ABOVE CEILINGS AT B101; 110; 116; 117; 120; 122; 132 FULLY SCREW ALL FLANGE CONNECTIONS OF CEILING JOISTS; COMPLETE DISCONTINUOUS DUCTWORK
In-wall Inspection Partial 11/26/2013 11/26/2013 at 12:00 AM 11/26/2013
Misc
Partial Correction
11/26/2013
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: AREA "A" MAIN LEVEL FROM (C.5) WEST EXCEPT RR'S A212 & A213; B114a; B120;
Above Ceiling Inspection Partial 11/26/2013 11/26/2013 at 12:00 AM 11/26/2013
Misc
Partial Correction
11/22/2013
OVERHEAD WATER & DWV PIPING IN AREA "B": ONE UNISTRUT HANGER TO BE INSTALLED; OK TO INSTALL PIPE INSULATION WHEN READY
Misc
Corrective Action Required
11/22/2013
NO CEILING FRAMING FOUND AT FOLLOWING SPACES REQUESTED FOR ABOVE-CEILING INSPECTION: B107; B123; B125; B127; B133; B134; B107
Misc
Corrective Action Required
11/26/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: B101; B110; B115; B116; B120;
Misc
Corrective Action Required
11/26/2013
AT SPACE B117 CLARIFY UNCONNECTED DWV SAN TEE WITH RUBBER CAP
Above Ceiling Inspection Partial 11/27/2013 at 12:00 AM 11/27/2013
Misc
Resolved
11/27/2013
OVERHEAD WATER & DWV PIPING IN AREA "B": ONE UNISTRUT HANGER TO BE INSTALLED; OK TO INSTALL PIPE INSULATION WHEN READY
Misc
Corrective Action Required
11/26/2013
SPACES TO RECEIVE PROPRIETARY CEILING NOT READY FOR ABOVE-CEILING INSPECTION: B107; B123; B125; B127; B133; B134; B107
Misc
Corrective Action Required
11/26/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: B101; B110; B115; B116; B120;
Misc
Resolved
11/27/2013
AT SPACE B117 CLARIFY UNCONNECTED DWV SAN TEE WITH RUBBER CAP
In-wall Inspection Partial 11/27/2013 at 12:00 AM 11/27/2013
Misc
Partial Correction
11/26/2013
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: AREA "A" MAIN LEVEL FROM (C.5) WEST EXCEPT RR'S A212 & A213; B114a; B120; AREA "A" MAIN LEVEL FROM (C.5) EAST;
Underslab Plumbing Inspection - Commercial Passed 8/28/2013 at 12:00 AM 12/03/2013
Misc
Resolved
12/03/2013
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT FOLLOWING LOCATIONS: (K.9) TO (N.1) x (5.6) TO (6.2); 6" PVC ST & 4" PVC SAN PER PR-02 FROM F.5/12.3 N & OFFSET TO F.4 5' OUTSIDE B/L; AREA B AND LOWER LIFT @ AREA C PER PR#2 MODIFICATIONS; PIPING FROM TRENCH DRAIN + COMPLETION OF PIPING AT SAND INTERCEPTOR THEN SAN + STORM THRU N WALL FOOTING; NOTE IPC 312 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Underground Plumbing Inspection - Commercial Passed 12/3/2013 at 12:00 AM 12/03/2013
In-wall Inspection Not Ready 12/16/2013 12/13/2013 at 12:00 AM 12/13/2013
Misc
Partial Correction
11/27/2013
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: AREA "A" MAIN LEVEL FROM (C.5) WEST EXCEPT RR'S A212 & A213; B114a; B120; AREA "A" MAIN LEVEL FROM (C.5) EAST; 12/13/13: A212 & A213 NOT READY; ISSUES DISCUSSED WITH MATT
Miscellaneous Inspection Passed 12/18/2013 at 12:00 AM 12/18/2013
Sprinkler - Hydrostatic Test Partial 12/20/2013 at 9:00 AM 12/20/2013
Above Ceiling Inspection Partial 12/20/2013 12/20/2013 at 12:00 AM 12/20/2013
Misc
Corrective Action Required
11/27/2013
SPACES TO RECEIVE PROPRIETARY CEILING NOT READY FOR ABOVE-CEILING INSPECTION: B107; B123; B125; B127; B133; B134; B107
Misc
Partial Correction
12/20/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: B101; B110; B115; B116; B120;
Misc
Partial Correction
12/20/2013
AREAS TO RECEIVE SECURITY TILE CEILING OK TO PLACE CRITICAL TILE: 104; 106; 112; 126; 119;
Above Ceiling Inspection Partial 12/26/2013 at 12:00 AM 12/26/2013
Misc
Corrective Action Required
12/20/2013
SPACES TO RECEIVE PROPRIETARY CEILING NOT READY FOR ABOVE-CEILING INSPECTION: B107; B123; B125; B127; B133; B134; B107
Misc
Partial Correction
12/20/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: B101; B110; B115; B116; B120;
Misc
Partial Correction
12/20/2013
AREAS TO RECEIVE SECURITY TILE CEILING OK TO PLACE CRITICAL TILE: 104; 106; 112; 126; 119;
Misc
Partial Correction
12/26/2013
ABOVE-CEILING SYSTEMS APPROVED WITH BELOW CONDITIONS AT FOLLOWING CELL SPACES WITH SECURITY CEILING SYSTEM INSTALLED IN ADVANCE: 107; 123; 125; 127; 128; 130; 133; 134 ENSURE ACOUSTICAL INSULATION IS COMPLETELY INSTALLED AND IN PROPER LOCATION BEFORE OCCUPANCY. TEMPORARY ELECTRICAL WIRING TO BE REMOVED. ALSO REMOVE ALL SCRAP MC ELECTRICAL CABLE AND OTHER DEBRIS.
In-wall Inspection Partial 12/26/2013 12/26/2013 at 12:00 AM 12/26/2013
Misc
Partial Correction
12/13/2013
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: AREA "A" MAIN LEVEL FROM (C.5) WEST EXCEPT RR'S A212 & A213; B114a; B120; AREA "A" MAIN LEVEL FROM (C.5) EAST; A212; A213;
Above Ceiling Inspection Not Ready 12/27/2013 12/27/2013 at 12:00 AM 12/27/2013
Misc
Corrective Action Required
12/26/2013
SPACES TO RECEIVE PROPRIETARY CEILING NOT READY FOR ABOVE-CEILING INSPECTION: B107; B123; B125; B127; B133; B134; B107
Misc
Partial Correction
12/26/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: B101; B110; B115; B116; B120;
Misc
Partial Correction
12/26/2013
AREAS TO RECEIVE SECURITY TILE CEILING OK TO PLACE CRITICAL TILE: 104; 106; 112; 126; 119;
Misc
Partial Correction
12/26/2013
ABOVE-CEILING SYSTEMS APPROVED WITH BELOW CONDITIONS AT FOLLOWING CELL SPACES WITH SECURITY CEILING SYSTEM INSTALLED IN ADVANCE: 107; 123; 125; 127; 128; 130; 133; 134 ENSURE ACOUSTICAL INSULATION IS COMPLETELY INSTALLED AND IN PROPER LOCATION BEFORE OCCUPANCY. TEMPORARY ELECTRICAL WIRING TO BE REMOVED. ALSO REMOVE ALL SCRAP MC ELECTRICAL CABLE AND OTHER DEBRIS.
Above Ceiling Inspection Partial 12/30/2013 12/30/2013 at 12:00 AM 12/30/2013
Misc
Resolved
12/30/2013
SPACES TO RECEIVE PROPRIETARY CEILING NOT READY FOR ABOVE-CEILING INSPECTION: B107; B123; B125; B127; B133; B134; B107
Misc
Partial Correction
12/27/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: B101; B110; B115; B116; B120;
Misc
Resolved
12/30/2013
AREAS TO RECEIVE SECURITY TILE CEILING OK TO PLACE CRITICAL TILE:
Misc
Partial Correction
12/27/2013
ABOVE-CEILING SYSTEMS APPROVED WITH CONDITIONS STATED BELOW AT FOLLOWING SPACES WITH SECURITY CEILING SYSTEM INSTALLED: 104; 105; 106; 107; 108; 111; 114; 114a; 118; 123; 125; 127; 128; 130; 133; 134 ENSURE ACOUSTICAL INSULATION WHERE REQUIRED IS COMPLETELY INSTALLED AND IN PROPER LOCATION BEFORE OCCUPANCY. TEMPORARY ELECTRICAL WIRING TO BE REMOVED. ALSO REMOVE ALL SCRAP MC ELECTRICAL CABLE AND OTHER DEBRIS.
In-wall Inspection Partial 1/2/2014 1/2/2014 at 12:00 AM 01/02/2014
Misc
Partial Correction
12/26/2013
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: AREA "A" MAIN LEVEL FROM (C.5) WEST EXCEPT RR'S A212 & A213; B114a; B120; AREA "A" MAIN LEVEL FROM (C.5) EAST; A212; A213; BUILDING C: LINES: P, 7.9, N.4, 9, I.8, LINE 13 FROM E TO F (mrc)
In-wall Inspection Partial 1/6/2014 1/6/2014 at 12:00 AM 01/06/2014
Misc
Partial Correction
01/02/2014
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: AREA "A" MAIN LEVEL FROM (C.5) WEST INCLUDING A212 & A213; B114a; B120; AREA "A" MAIN LEVEL FROM (C.5) EAST; A102; A103; {CMU @ A104, 105, 106}; A107; A108; A109; A110; A111; A112; A113; BUILDING C: LINES: P, 7.9, N.4, 9, I.8, LINE 13 FROM E TO F (mrc)
Above Ceiling Inspection Failed 1/15/2014 at 12:00 AM 01/15/2014
Misc
Partial Correction
12/30/2013
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: B101; B110; B115; B116; B120;
Misc
Partial Correction
12/30/2013
ABOVE-CEILING SYSTEMS APPROVED WITH CONDITIONS STATED BELOW AT FOLLOWING SPACES WITH SECURITY CEILING SYSTEM INSTALLED: 104; 105; 106; 107; 108; 111; 114; 114a; 118; 123; 125; 127; 128; 130; 133; 134 ENSURE ACOUSTICAL INSULATION WHERE REQUIRED IS COMPLETELY INSTALLED AND IN PROPER LOCATION BEFORE OCCUPANCY. TEMPORARY ELECTRICAL WIRING TO BE REMOVED. ALSO REMOVE ALL SCRAP MC ELECTRICAL CABLE AND OTHER DEBRIS.
Misc
Corrective Action Required
01/15/2014
AT TRAINING 104/105 DO NOT COVER SOFFIT. FULLY SCREW ALL CONNECTIONS. SCREW BOTH FLANGES OF TENSION STUDS TOP AND BOTTOM.
Above Ceiling Inspection Partial 1/16/2014 1/16/2014 at 12:00 AM 01/16/2014
Misc
Partial Correction
01/15/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: B101; B110; B115; B116; B120;
Misc
Partial Correction
01/15/2014
ABOVE-CEILING SYSTEMS APPROVED WITH CONDITIONS STATED BELOW AT FOLLOWING SPACES WITH SECURITY CEILING SYSTEM INSTALLED: 104; 105; 106; 107; 108; 111; 114; 114a; 118; 123; 125; 127; 128; 130; 133; 134; [SOFFITS AT 104/105;
Misc
Resolved
01/16/2014
AT TRAINING 104/105 DO NOT COVER SOFFIT. FULLY SCREW ALL CONNECTIONS. SCREW BOTH FLANGES OF TENSION STUDS TOP AND BOTTOM.
Above Ceiling Inspection Partial 1/16/2014 at 12:00 AM 01/16/2014
Misc
Partial Correction
01/16/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: B101; B110; B115; B116; B120; [SOFFITS AT 104/105;
Misc
Partial Correction
01/16/2014
ABOVE-CEILING SYSTEMS APPROVED WITH CONDITIONS STATED BELOW AT FOLLOWING SPACES WITH SECURITY CEILING SYSTEM INSTALLED: 104; 105; 106; 107; 108; 111; 114; 114a; 118; 123; 125; 127; 128; 130; 133; 134;
Miscellaneous Inspection Partial 1/16/2014 at 12:00 AM 01/16/2014
Misc
Partial Correction
01/16/2014
PRE-FINAL PLANNING
Miscellaneous Inspection Partial 1/17/2014 at 12:00 AM 01/17/2014
Misc
Partial Correction
01/16/2014
PRE-FINAL PLANNING
Alarm Test Partial 1/21/2014 at 8:00 AM 01/21/2014
Miscellaneous Inspection Partial 1/21/2014 at 12:00 AM 01/21/2014
Misc
Partial Correction
01/17/2014
PRE-FINAL PLANNING
Miscellaneous Inspection Passed 1/21/2014 at 12:00 AM 01/21/2014
Misc
Resolved
01/21/2014
PRE-FINAL PLANNING
Occupancy Inspection - Codes Commercial Failed 1/22/2014 1/22/2014 at 12:00 AM 01/22/2014
Misc
Corrective Action Required
01/22/2014
USE & OCCUPANCY OF AREA "B": > RESOLVE FIRE DEPARTMENT ISSUES > NO WATER DEPARTMENT ISSUES PER BEN H. > RESOLVE ISSUES IN TOILET E119: SEE BELOW
Misc
Corrective Action Required
01/22/2014
ACCESSIBLE TOILET E119: 1) 18" VERTICAL GRAB BAR LOCATION 2) MIRROR HEIGHT 3) PADDING AT UNDER-LAV PIPING 4) WALL SUFACES MUST BE NON-ABSORBENT 5) BASE MUST SEAL WALL-FLOOR JOINT
Occupancy Inspection - Fire Not Ready 1/22/2014 at 12:00 AM 01/22/2014
Occupancy Inspection - Fire Temporary C of O 1/24/2014 at 12:00 AM 01/24/2014
Misc
Corrective Action Required
01/24/2014
Occupancy Inspection - Codes Commercial Partial 1/30/2014 at 12:00 AM 01/30/2014
Misc
Corrective Action Required
01/22/2014
FOLLOWING AREA(S) OK FOR USE & OCCUPANCY: AREA "B";
Misc
Resolved
01/30/2014
ACCESSIBLE TOILET E119: 1) 18" VERTICAL GRAB BAR LOCATION 2) MIRROR HEIGHT 3) PADDING AT UNDER-LAV PIPING 4) WALL SUFACES MUST BE NON-ABSORBENT 5) BASE MUST SEAL WALL-FLOOR JOINT
Above Ceiling Inspection Failed 2/13/2014 2/13/2014 at 12:00 AM 02/13/2014
Misc
Partial Correction
01/16/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: B101; B110; B115; B116; B120; [SOFFITS AT 104/105;
Misc
Partial Correction
01/16/2014
ABOVE-CEILING SYSTEMS APPROVED WITH CONDITIONS STATED BELOW AT FOLLOWING SPACES WITH SECURITY CEILING SYSTEM INSTALLED: 104; 105; 106; 107; 108; 111; 114; 114a; 118; 123; 125; 127; 128; 130; 133; 134;
Misc
Corrective Action Required
02/13/2014
ACT CEILING TILE FRAMING & ABOVE-CEILING SYSTEMS: CEILING SUPPORT WIRES MUST BE AT MINIMUM 45 DEGREES WITH HORIZONTAL. CHECK ALL.
Misc
Corrective Action Required
02/13/2014
E.C. TO CHECK ALL TO ENSURE NOT BAT-WINGED TO CEILING SUPPORT WIRES. + ONE OPEN J.B.
Above Ceiling Inspection Partial 2/14/2014 2/14/2014 at 12:00 AM 02/14/2014
Misc
Resolved
02/14/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: B101; B110; B115; B116; B120; [SOFFITS AT 104/105;
Misc
Resolved
02/14/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: B101; B110; B115; B116; B120; [SOFFITS AT 104/105;
Misc
Resolved
02/14/2014
ABOVE-CEILING SYSTEMS APPROVED WITH CONDITIONS STATED BELOW AT FOLLOWING SPACES WITH SECURITY CEILING SYSTEM INSTALLED: 104; 105; 106; 107; 108; 111; 114; 114a; 118; 123; 125; 127; 128; 130; 133; 134;
Misc
Resolved
02/14/2014
ABOVE-CEILING SYSTEMS APPROVED WITH CONDITIONS STATED BELOW AT FOLLOWING SPACES WITH SECURITY CEILING SYSTEM INSTALLED: 104; 105; 106; 107; 108; 111; 114; 114a; 118; 123; 125; 127; 128; 130; 133; 134;
Misc
Resolved
02/14/2014
ACT CEILING TILE FRAMING & ABOVE-CEILING SYSTEMS: CEILING SUPPORT WIRES MUST BE AT MINIMUM 45 DEGREES WITH HORIZONTAL. CHECK ALL.
Misc
Resolved
02/14/2014
ACT CEILING TILE FRAMING & ABOVE-CEILING SYSTEMS: CEILING SUPPORT WIRES MUST BE AT MINIMUM 45 DEGREES WITH HORIZONTAL. CHECK ALL.
Misc
Resolved
02/14/2014
E.C. TO CHECK ALL TO ENSURE NOT BAT-WINGED TO CEILING SUPPORT WIRES. + ONE OPEN J.B.
Misc
Resolved
02/14/2014
E.C. TO CHECK ALL TO ENSURE NOT BAT-WINGED TO CEILING SUPPORT WIRES. + ONE OPEN J.B.
Misc
Partial Correction
02/14/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 203-208; 210-213; 216;
Above Ceiling Inspection Partial 2/18/2014 2/18/2014 at 12:00 AM 02/18/2014
Misc
Partial Correction
02/14/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 203-208; 210-213; 216; S-2;
Misc
Partial Correction
02/18/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A219 AFTER ALL CEILING JOIST CONNECTIONS ARE SCREWED BOTH FLANGES;
Above Ceiling Inspection Partial 2/21/2014 2/21/2014 at 12:00 AM 02/21/2014
Misc
Partial Correction
02/18/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 203-208; 210-213; 216; S-2; 102; 107; 109; 110; 111; 112;
Misc
Resolved
02/21/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: A219 AFTER ALL CEILING JOIST CONNECTIONS ARE SCREWED BOTH FLANGES;
Above Ceiling Inspection Partial 2/25/2014 2/25/2014 at 12:00 AM 02/25/2014
Misc
Partial Correction
02/21/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 203-208; 210-213; 216; S-2; 102; 107; 109; 110; 111; 112; 108 AFTER TEMP ELECT WIRING IS REMOVED. SPRINKLER DISTRIBUTION PIPING YET TO BE CONNECTED @ S WALL;
Misc
Corrective Action Required
02/25/2014
SPACE 113: - CHECK & CORRECT CEILING SUPPORT WIRES SO NONE HAVE BENT PATH TO STRUCTURE ABOVE - CHECK ALL MC CABLE FOR SUPPORT @ 6' MAX AND SECURING WITHIN 12" OF BOX EXCEPT FIXTURE WHIPS > 6' LONG - F.A. WIRING NOT COMPLETED - REMOVE TEMP ELECT WIRING - SPRINKLER DROPS NOT TO ELEVATION
Above Ceiling Inspection Partial 2/27/2014 2/27/2014 at 12:00 AM 02/27/2014
Misc
Partial Correction
02/25/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 203-208; 210-213; 216; S-2; 102; 107; 109; 110; 111; 112; 108; EXSTG E106; A113; A201; A202A; A218 + ELEV LOBBY; A223;
Misc
Resolved
02/27/2014
SPACE 113: - CHECK & CORRECT CEILING SUPPORT WIRES SO NONE HAVE BENT PATH TO STRUCTURE ABOVE - CHECK ALL MC CABLE FOR SUPPORT @ 6' MAX AND SECURING WITHIN 12" OF BOX EXCEPT FIXTURE WHIPS > 6' LONG - F.A. WIRING NOT COMPLETED - REMOVE TEMP ELECT WIRING - SPRINKLER DROPS NOT TO ELEVATION
Miscellaneous Inspection Partial 2/28/2014 at 12:00 AM 02/28/2014
Miscellaneous Inspection Partial 3/3/2014 at 12:00 AM 03/03/2014
In-wall Inspection Passed 1/6/2014 at 12:00 AM 03/03/2014
Misc
Resolved
03/03/2014
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: AREA "A" MAIN LEVEL FROM (C.5) WEST INCLUDING A212 & A213; B114a; B120; AREA "A" MAIN LEVEL FROM (C.5) EAST; A102; A103; {CMU @ A104, 105, 106}; A107; A108; A109; A110; A111; A112; A113; BUILDING C: LINES: P, 7.9, N.4, 9, I.8, LINE 13 FROM E TO F (mrc)
Foundation Inspection - Commercial Passed 6/14/2013 (1:00) 6/10/2013 at 12:00 AM 03/03/2014
Misc
Resolved
03/03/2014
OK TO POUR WHEN READY ELEVATOR PIT WALLS
Above Ceiling Inspection Passed 2/27/2014 at 12:00 AM 03/03/2014
Misc
Resolved
03/03/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 203-208; 210-213; 216; S-2; 102; 107; 109; 110; 111; 112; 108; EXSTG E106; A113; A201; A202A; A218 + ELEV LOBBY; A223;
Concrete Walls and Columns Inspection Passed 9/12/2013 at 12:00 AM 03/03/2014
Misc
Resolved
03/03/2014
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE WALLS AT FOLLOWING LOCATIONS: E/12.8 TO E/11 TO 11/C.6; G.8/7.1 TO G.8/10 TO C.55/11; G.8/10 TO 10/B.7; 11/C.6 TO 11/A.5; 10/B.7 TO 10/B.4 TO 11/B.4; E/12.8 TO E/13 TO 13/D.5; 11/A.5 TO A/11 TO A/13 TO 13/A.5; 13/A.5 TO 13/D.4 TO COMPLETE N MAIN WALL;
Misc
Resolved
03/03/2014
PREPARATION TO POUR WHEN READY C.I.P. CONCRETE RETAINING WALLS PER SECTIONS 14/S200 & 16/S200 AND WALLS PER SECTION 15/S200
Footing Inspection - Commercial Passed 9/9/2013 at 12:00 AM 03/03/2014
Misc
Resolved
03/03/2014
OK TO POUR WHEN READY WALL FOOTINGS + INTEGRAL COLUMN FOOTINS AT FOLLOWING LOCATIONS: ON (E) FROM (11) TO (13) + 8' RETURNS; ON (11) FROM (B.4) TO PREVIOUS POUR AT (D.8); (B.4)/(11) TO (B.4)/(10) TO (C.6)/(10) TO (C.6)/(11); MEN'S R.R. FROM NORTH TO (7.5); K.6/7 TO K.6/7.2 TO F.8/12 TO F/12 TO L.8/7.8 + L.8/7 TO L.8/8.7; H.7/7.1 TO H.7/8; G.8/7.1 TO G.8/7.6 (NOTED RE-BAR ADDED PER A/E REDNOTES ON SHEET S101A); 11/B.4 TO A/11 TO A/12.7; A/12.7 TO A/13 TO 13/B.45; E/13 TO F/13; L.8/9 TO N.4/9; N.4/8 TO N.4/9; AREA B/C: N.1/5.7 TO P/7.6; [6/P.2 TO 7/P.2; 6/N.1 TO 6/N.8; COMPLETION OF SE CRNR G.B. + G.B. SECT 14/S101B ON N.1 + S 8'x4' DEEP FTG (OVER-DUG DUE TO SOIL CONDITION); 7.1/N.1 TO 7.1/P; N.7/7 TO N.7/6; 6.3/N.7 TO 6.3/N.1; 8'x4' DEEP FTG @ 6.3/N.1; REMAINDER OF SECT 11/S101B FTGS @ ELEV PIT; 7.2/L.8 TO 7.2/P; P/7.5 TO 7.9/P TO N.4/7.9 TO N.4/8.1;
Misc
Resolved
03/03/2014
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: J.4/7.2; F.1/11.8; F.2/12 OVER-DUG DUE TO SOIL CONDITION
Misc
Resolved
03/03/2014
OK TO POUR WHEN READY SECTION (14/S200) MASS FOOTING FROM 11' E OF (A) TO (B);
Misc
Resolved
03/03/2014
OK TO POUR WHEN READY RETAINING WALL FOOTING SECTIONS 14/S200 & 16/S200 FROM (C) TO (C.3)
Rough Electrical Inspection - Commercial Passed 11/12/2013 at 12:00 AM 03/03/2014
Misc
Resolved
03/03/2014
OK TO COVER WHEN READY ELECTRICAL CONDUIT AND BOXES AT FLOATING ISOLATION SOUND MAT AT NEW MAIN LEVEL AT AREAS: (A) TO (C) x (11) TO (13); THEATER SEATING AREA A205 INSPECTED BY MH WEEK OF 11/4/2013;
Misc
Resolved
03/03/2014
NO ISSUES FOUND ON WIRING AND TERMINATIONS IN PANEL MSB2
Rough Framing Inspection - Commercial Passed 10/8/2013 at 12:00 AM 03/03/2014
Misc
Resolved
03/03/2014
OK TO CVOER WHEN READY LIGHT GAUGE FRAMING @ PARAPET WALLS AT: PERIMETER AT ELEVATION 132'-8" AND 130'-8"; LOWER WALL 132'-10" AT CLEARSTORY; ROOF FACE OF PARAPET WALLS AT ELEVATION 117';
Misc
Resolved
03/03/2014
SCREW BOTH FLANGES BOTH ENDS OF CRIPPLE STUDS ABOVE DOOR OPENINGS
Underground Electrical Inspection - Commercial Passed 11/14/2013 at 12:00 AM 03/03/2014
Misc
Resolved
03/03/2014
BURIED CONDUIT FOR SITE ELECTRICAL:
Underslab Electrical Inspection - Commercial Passed 10/21/2013 at 12:00 AM 03/03/2014
Misc
Resolved
03/03/2014
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: AREA; AREA B FROM (E)TO(L.8)x(7.1)TO13); [111] & [108]; AREA C; BOOKING DESK 105;
Miscellaneous Inspection Partial 3/4/2014 at 12:00 AM 03/04/2014
Sprinkler - Hydrostatic Test Partial 3/4/2014 at 1:00 PM 03/04/2014
Sprinkler - Hydrostatic Test Passed 3/6/2014 at 12:00 AM 03/06/2014
Sprinkler - Hydrostatic Test Passed 12/20/2013 at 12:00 AM 03/06/2014
Alarm Test Passed 3/7/2014 at 12:00 AM 03/07/2014
Occupancy Inspection - Fire Temporary C of O 3/7/2014 at 12:00 AM 03/07/2014
Misc
Corrective Action Required
03/07/2014
- sprinkler room doors interior and exterior, label the doors "sprinkler room" - label the sprinkler risers with coverage areas - elevators need to meet state specifications, need a copy of the state certification -label the warning strobe in the control room CO SENSOR -install strobes in the main level trainig area restrooms - install a smoke detector above the main fire alarm panel -test the CO sensor in the C-area garage -uncover all exit signs main level training area -emergency lighting throughout lower level not working -adjust the rate of fall on all roll down doors -temp/lighting still inplace in A-106 area -door E117B needs to unlock on a alarm activation -paint the bonnet silver of all private hydrants.
Occupancy Inspection - Codes Commercial Partial 3/7/2014 3/7/2014 at 12:00 AM 03/07/2014
Misc
Partial Correction
03/07/2014
FOLLOWING AREA(S) OK FOR USE & OCCUPANCY: AREA "B"; REMAINDER OF AREAS A, & B OK TO SET UP FOR BUSINESS. NO OPERATION PRIOR TO APPROVAL.
Occupancy Inspection - Codes Commercial Partial 3/7/2014 at 12:00 AM 03/07/2014
Misc
Partial Correction
03/07/2014
FOLLOWING AREA(S) OK FOR USE & OCCUPANCY: AREA "B"; REMAINDER OF AREAS A & B OK TO SET UP FOR BUSINESS. NOT READY FOR FULL INSPECTION FOR OCCUPANCY. NO OPERATION PRIOR TO APPROVAL.
Underground Electrical Inspection - Commercial Partial 3/18/2014 3/18/2014 at 12:00 AM 03/18/2014
Misc
Corrective Action Required
03/18/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1; 2; 3; 4; 5; 6; ACI CODE REQUIREMENT FOR 3" COVERAGE TO DIRT APPLIES TO ALL RE-BAR AT ALL FOOTINGS AND LIGHT POLE BASES.
Underground Electrical Inspection - Commercial Partial 3/19/2014 3/19/2014 at 12:00 AM 03/19/2014
Misc
Partial Correction
03/19/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1-6; 7; 8; 9; 10; 11;
Underground Electrical Inspection - Commercial Partial 3/20/2014 3/20/2014 at 12:00 AM 03/20/2014
Misc
Partial Correction
03/19/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1-6; 7; 8; 9; 10; 11;
Misc
Partial Correction
03/20/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE (NE 15' TO BE DUG DEEPER AND VERIFIED LATER);
Underground Electrical Inspection - Commercial Partial 3/21/2014 3/21/2014 at 12:00 AM 03/21/2014
Misc
Partial Correction
03/20/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1-6; 7; 8; 9; 10; 11;
Misc
Partial Correction
03/20/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66';
Underground Electrical Inspection - Commercial Partial 3/21/2014 at 12:00 AM 03/21/2014
Misc
Partial Correction
03/21/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1-6; 7; 8; 9; 10; 11;
Misc
Partial Correction
03/21/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE;
Underground Electrical Inspection - Commercial Partial 3/24/2014 3/24/2014 at 12:00 AM 03/24/2014
Misc
Partial Correction
03/21/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1-11; [12; 13; 14 IFF CAGES ARE RAISED BEFORE POUR TO PROVIDE >=3" CLEARANCE BELOW RODS]
Misc
Partial Correction
03/21/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE;
Occupancy Inspection - Codes Commercial Failed 3/25/2014 at 12:00 AM 03/25/2014
Misc
Corrective Action Required
03/25/2014
FOLLOWING AREA(S) OK FOR USE & OCCUPANCY: AREA "B";
Misc
Corrective Action Required
03/25/2014
FACE OF LINE CURRENT ELECTRICAL BOXES IN RANGE MUST BE FLUSH WITH FACE OF WALL MATERIAL FOR WHICH NO FLAME RESISTANCE CHARACTERISTICS ARE PROVIDED.
Misc
Corrective Action Required
03/25/2014
ELECTRICAL RECEPTACLE AT RTU2 NOT HOT FOR TEST. MUST BE TESTED FOR GFCI PROTECTION.
Misc
Corrective Action Required
03/25/2014
TECH DATA ON CO SENSORS ACKNOWLEGED RECEIVED. TO BE REVIEWED.
Misc
Corrective Action Required
03/25/2014
NEC 210.63 ELECTRICAL RECEPTACLE OUTLET FOR SERVICING OF HACR EQUIPMENT: REQUIRED WITHIN 25' OF EQUIPMENT AT SAME LEVEL AS EQUIPMENT. NOT FOUND AT RTU1 & ERV1
Misc
Corrective Action Required
03/25/2014
ALL ELECTRICAL PANELS: - AS DISCUSSED PREVIOUSLY MAKE CB POSITIONS LABELS SECURELY AFFIXED TO PANEL FRONTS. MANY ARE ALREADY PEELING OFF. - REVIEW ALL PANEL SCHEDULES FOR COMPLETENESS AND ACCURACY. RE-PRINT, ELIMINATING ILLEGIBLE AND UNCLEAR LABELING.
Misc
Corrective Action Required
03/25/2014
NEC 210-8; E3802.2: GFCI PROTECTION OF ELECTRICAL RECEPTACLES: DUPLEX ELECTRICAL RECEPTACLE AT [A210] NOT GFCI PROTECTED. IF DESIGNATED AS "DEDICATED" FOR APPLIANCE RECEPTACLE MUST BE SINGLE PLUG.
Misc
Corrective Action Required
03/25/2014
FLOOR SINK AT [A214] NOT SEALED TO WALL. IS WALL TO BE PAINTED? (ALT 1?).
Misc
Corrective Action Required
03/25/2014
IS ROOFTOP ELECT CONDUIT TO BE PAINTED? SEE OUTSIDE CLERESTORY.
Misc
Corrective Action Required
03/25/2014
JAMB AT DOOR (A103) FRAME HAS INCOMPLETE BACKER ROD AND CAULK.
Misc
Corrective Action Required
03/25/2014
RE-INSPECTION REQUIRED ABOVE CEILING AT [A107]. PROVIDE LADDER AND REMOVE TWO CEILING TILES.
Misc
Corrective Action Required
03/25/2014
RESOLVE ANY FIRE DEPARTMENT ISSUES
Misc
Corrective Action Required
03/25/2014
RESOLVE ANY WATER DEPARTMENT ISSUES
Misc
Corrective Action Required
03/25/2014
RESOLVE ANY PUBLIC WORKS DEPARTMENT ISSUES
Misc
Corrective Action Required
03/25/2014
RESOLVE ANY PLANNING DEPARTMENT ISSUES
Misc
Corrective Action Required
03/25/2014
WHEN EXTERIOR AND SITE WORK IS COMPLETED REQUEST FURTHER INSPECTION. NOTE SOME DOWNSPOUTS ARE NOT IN PLACE. ENSURE ALL ARE FULLY ATTACHED TO BUILDING.
Underground Electrical Inspection - Commercial Partial 3/25/2014 3/25/2014 at 12:00 AM 03/25/2014
Misc
Partial Correction
03/24/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1-11; [12; 13; 14 IFF CAGES ARE RAISED BEFORE POUR TO PROVIDE >=3" CLEARANCE BELOW RODS]
Misc
Partial Correction
03/24/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE; FROM #3 TO #4; FROM #5 TO 180 LF WEST; PARTIAL AT BOLLARDS AT EAST FRONT OF BUILDING;
Underground Electrical Inspection - Commercial Partial 3/26/2014 3/26/2014 at 12:00 AM 03/26/2014
Misc
Resolved
03/26/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1-11; [12; 13; 14 IFF CAGES ARE RAISED BEFORE POUR TO PROVIDE >=3" CLEARANCE BELOW RODS]
Misc
Partial Correction
03/25/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE; FROM #3 TO #4; FROM #5 TO 180 LF WEST; PARTIAL AT BOLLARDS AT EAST FRONT OF BUILDING; GIVEN DECISION TO UTILIZE METALLIC CONDUIT, PER NEC, COMPLIANT COVER CONSISTS OF 2" CONCRETE + EARTH BACKFILL WITH CONDUIT AT 6" BELOW GRADE
Occupancy Inspection - Codes Commercial Partial 3/27/2014 at 12:00 AM 03/27/2014
Misc
Partial Correction
03/27/2014
FOLLOWING AREA(S) OK FOR USE & OCCUPANCY: AREA "B";
Misc
Resolved
03/27/2014
FACE OF LINE CURRENT ELECTRICAL BOXES IN RANGE MUST BE FLUSH WITH FACE OF WALL MATERIAL FOR WHICH NO FLAME RESISTANCE CHARACTERISTICS ARE PROVIDED.
Misc
Corrective Action Required
03/25/2014
ELECTRICAL RECEPTACLE AT RTU2 NOT HOT FOR TEST. MUST BE TESTED FOR GFCI PROTECTION.
Misc
Resolved
03/27/2014
TECH DATA ON CO SENSORS ACKNOWLEGED RECEIVED. TO BE REVIEWED.
Misc
Resolved
03/27/2014
NEC 210.63 ELECTRICAL RECEPTACLE OUTLET FOR SERVICING OF HACR EQUIPMENT: REQUIRED WITHIN 25' OF EQUIPMENT AT SAME LEVEL AS EQUIPMENT. NOT FOUND AT RTU1 & ERV1
Misc
Resolved
03/27/2014
ALL ELECTRICAL PANELS: - AS DISCUSSED PREVIOUSLY MAKE CB POSITIONS LABELS SECURELY AFFIXED TO PANEL FRONTS. MANY ARE ALREADY PEELING OFF. - REVIEW ALL PANEL SCHEDULES FOR COMPLETENESS AND ACCURACY. RE-PRINT, ELIMINATING ILLEGIBLE AND UNCLEAR LABELING.
Misc
Resolved
03/27/2014
NEC 210-8; E3802.2: GFCI PROTECTION OF ELECTRICAL RECEPTACLES: DUPLEX ELECTRICAL RECEPTACLE AT [A210] NOT GFCI PROTECTED. IF DESIGNATED AS "DEDICATED" FOR APPLIANCE RECEPTACLE MUST BE SINGLE PLUG.
Misc
Resolved
03/27/2014
FLOOR SINK AT [A214] NOT SEALED TO WALL. IS WALL TO BE PAINTED? (ALT 1?).
Misc
Resolved
03/27/2014
IS ROOFTOP ELECT CONDUIT TO BE PAINTED? SEE OUTSIDE CLERESTORY.
Misc
Resolved
03/27/2014
JAMB AT DOOR (A103) FRAME HAS INCOMPLETE BACKER ROD AND CAULK.
Misc
Resolved
03/27/2014
RE-INSPECTION REQUIRED ABOVE CEILING AT [A107]. PROVIDE LADDER AND REMOVE TWO CEILING TILES.
Misc
Corrective Action Required
03/25/2014
RESOLVE ANY FIRE DEPARTMENT ISSUES
Misc
Resolved
03/27/2014
RESOLVE ANY WATER DEPARTMENT ISSUES
Misc
Resolved
03/27/2014
RESOLVE ANY PUBLIC WORKS DEPARTMENT ISSUES
Misc
Corrective Action Required
03/25/2014
RESOLVE ANY PLANNING DEPARTMENT ISSUES
Misc
Corrective Action Required
03/25/2014
WHEN EXTERIOR AND SITE WORK IS COMPLETED REQUEST FURTHER INSPECTION. NOTE SOME DOWNSPOUTS ARE NOT IN PLACE. ENSURE ALL ARE FULLY ATTACHED TO BUILDING.
Underground Electrical Inspection - Commercial Partial 3/27/2014 at 12:00 AM 03/27/2014
Misc
Partial Correction
03/26/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE; FROM #3 TO #4; FROM #5 TO 180 LF WEST; AT BOLLARDS AT EAST FRONT OF BUILDING MINUMUM 6" DEPTH APPROVED BASED ON "GENERAL" LINE IN NEC TABLE 300.5
Occupancy Inspection - Fire Passed 3/28/2014 at 12:00 AM 03/28/2014
Occupancy Inspection - Fire Temporary C of O 3/27/2014 at 12:00 AM 03/28/2014
Misc
Corrective Action Required
03/07/2014
- sprinkler room doors interior and exterior, label the doors "sprinkler room" - label the sprinkler risers with coverage areas - elevators need to meet state specifications, need a copy of the state certification -label the warning strobe in the control room CO SENSOR -install strobes in the main level trainig area restrooms - install a smoke detector above the main fire alarm panel -test the CO sensor in the C-area garage -uncover all exit signs main level training area -emergency lighting throughout lower level not working -adjust the rate of fall on all roll down doors -temp/lighting still inplace in A-106 area -door E117B needs to unlock on a alarm activation -paint the bonnet silver of all private hydrants.
Occupancy Inspection - Planning Temporary C of O 03/28/2014
Corrective Action Required
03/28/2014
Complete landscaping and sodding per the approved plan.
Corrective Action Required
03/28/2014
Install parking lot light poles per the approved plan.
Corrective Action Required
03/28/2014
Complete rear parking lot expansion (surface course + striping) per the approved plan.
Corrective Action Required
03/28/2014
Complete sidewalk connection to addition's east side entrance per the approved plan.
Occupancy Inspection - Codes Commercial Temporary C of O 3/28/2014 at 12:00 AM 03/28/2014
Misc
Resolved
03/28/2014
FOLLOWING AREA(S) OK FOR USE & OCCUPANCY: AREA "B";
Misc
Corrective Action Required
03/27/2014
ELECTRICAL RECEPTACLE AT RTU2 NOT HOT FOR TEST. MUST BE TESTED FOR GFCI PROTECTION.
Misc
Resolved
03/28/2014
RESOLVE ANY FIRE DEPARTMENT ISSUES
Misc
Corrective Action Required
03/27/2014
RESOLVE ANY PLANNING DEPARTMENT ISSUES
Misc
Corrective Action Required
03/27/2014
WHEN EXTERIOR AND SITE WORK IS COMPLETED REQUEST FURTHER INSPECTION. NOTE SOME DOWNSPOUTS ARE NOT IN PLACE. ENSURE ALL ARE FULLY ATTACHED TO BUILDING.
Underground Electrical Inspection - Commercial Partial 4/1/2014 4/1/2014 at 12:00 AM 04/01/2014
Misc
Partial Correction
03/27/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE; FROM #3 TO #4; FROM #5 TO 180 LF WEST; AT BOLLARDS AT EAST FRONT OF BUILDING MINUMUM 6" DEPTH APPROVED BASED ON "GENERAL" LINE IN NEC TABLE 300.5; 1" PVC CONDUITS TRENCHED FROM [A] TO [B] TO [C] AS MARKED ON SITE ELECTRICAL PERMIT PRINT;
Underground Electrical Inspection - Commercial Partial 4/1/2014 4/1/2014 at 12:00 AM 04/01/2014
Misc
Partial Correction
04/01/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE; FROM #3 TO #4; FROM #5 TO 180 LF WEST; AT BOLLARDS AT EAST FRONT OF BUILDING MINUMUM 6" DEPTH APPROVED BASED ON "GENERAL" LINE IN NEC TABLE 300.5; 1" PVC CONDUITS TRENCHED FROM [A] TO [B] TO [C] TO [D] AS MARKED ON SITE ELECTRICAL PERMIT PRINT;
Underground Electrical Inspection - Commercial Partial 4/7/2014 4/7/2014 at 12:00 AM 04/07/2014
Misc
Partial Correction
04/01/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE; FROM #3 TO #4; FROM #5 TO 180 LF WEST; AT BOLLARDS AT EAST FRONT OF BUILDING MINUMUM 6" DEPTH APPROVED BASED ON "GENERAL" LINE IN NEC TABLE 300.5; 1" PVC CONDUITS TRENCHED FROM [A] TO [B] TO [C] TO [D] + [E] TO [F] AS MARKED ON SITE ELECTRICAL PERMIT PRINT;
Underground Electrical Inspection - Commercial Partial 4/8/2014 4/8/2014 at 12:00 AM 04/08/2014
Misc
Partial Correction
04/07/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE; FROM #3 TO #4; FROM #5 TO 180 LF WEST; AT BOLLARDS AT EAST FRONT OF BUILDING MINUMUM 6" DEPTH APPROVED BASED ON "GENERAL" LINE IN NEC TABLE 300.5; 1" PVC CONDUITS TRENCHED FROM [A] TO [B] TO [C] TO [D] + [E] TO [F] TO LP#11 AS MARKED ON SITE ELECTRICAL PERMIT PRINT;
Underground Electrical Inspection - Commercial Partial 4/9/2014 at 12:00 AM 04/09/2014
Misc
Partial Correction
04/08/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE; FROM #3 TO #4; FROM #5 TO 180 LF WEST; AT BOLLARDS AT EAST FRONT OF BUILDING MINUMUM 6" DEPTH APPROVED BASED ON "GENERAL" LINE IN NEC TABLE 300.5; 1" PVC CONDUITS TRENCHED FROM [A] TO [B] TO [C] TO [D] + [E] TO [F] TO LP#11 + RECEPTACLE PEDESTALS @ [G] + QUAZITE BOX @ [H] AS MARKED ON SITE ELECTRICAL PERMIT PRINT;
Underground Electrical Inspection - Commercial Partial 4/10/2014 at 12:00 AM 04/10/2014
Misc
Partial Correction
04/09/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE; FROM #3 TO #4; FROM #5 TO 180 LF WEST; AT BOLLARDS AT EAST FRONT OF BUILDING MINUMUM 6" DEPTH APPROVED BASED ON "GENERAL" LINE IN NEC TABLE 300.5; 1" PVC CONDUITS TRENCHED FROM [A] TO [B] TO [C] TO [D] + [E] TO [F] TO LP#11 + RECEPTACLE PEDESTALS @ [G] + QUAZITE BOX @ [H] AS MARKED ON SITE ELECTRICAL PERMIT PRINT;
Underground Electrical Inspection - Commercial Partial 4/11/2014 4/11/2014 at 12:00 AM 04/11/2014
Misc
Partial Correction
04/10/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE; FROM #3 TO #4; FROM #5 TO 180 LF WEST; AT BOLLARDS AT EAST FRONT OF BUILDING MINUMUM 6" DEPTH APPROVED BASED ON "GENERAL" LINE IN NEC TABLE 300.5; 1" PVC CONDUITS TRENCHED FROM [A] TO [B] TO [C] TO [D] + [E] TO [F] TO LP#11 + RECEPTACLE PEDESTALS @ [G] + QUAZITE BOX @ [H] AS MARKED ON SITE ELECTRICAL PERMIT PRINT; MORE AS OF 4/11/14;
Underground Electrical Inspection - Commercial Partial 4/17/2014 4/17/2014 at 12:00 AM 04/17/2014
Misc
Partial Correction
04/11/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE; FROM #3 TO #4; FROM #5 TO 180 LF WEST; AT BOLLARDS AT EAST FRONT OF BUILDING MINUMUM 6" DEPTH APPROVED BASED ON "GENERAL" LINE IN NEC TABLE 300.5; 1" PVC CONDUITS TRENCHED FROM [A] TO [B] TO [C] TO [D] + [E] TO [F] TO LP#11 + RECEPTACLE PEDESTALS @ [G] + QUAZITE BOX @ [H] AS MARKED ON SITE ELECTRICAL PERMIT PRINT; MORE AS OF 4/11/14;
Misc
Partial Correction
04/17/2014
@ SOUTH SIDE OF PROPERTY, WEST SIDE OF GATE TO JUNCTION BOX APPROVED. RUN AT EAST SIDE OF GATE, CONDUIT APPROVED BETWEEN TWO EXISTING POLES
Occupancy Inspection - Codes Commercial Temporary C of O 4/29/2014 at 12:00 AM 04/29/2014
Misc
Resolved
04/29/2014
ELECTRICAL RECEPTACLE AT RTU2 NOT HOT FOR TEST. MUST BE TESTED FOR GFCI PROTECTION.
Misc
Corrective Action Required
03/28/2014
RESOLVE ANY PLANNING DEPARTMENT AND FINISH SITEWORK ISSUES.
Misc
Resolved
04/29/2014
WHEN EXTERIOR AND SITE WORK IS COMPLETED REQUEST FURTHER INSPECTION. NOTE SOME DOWNSPOUTS ARE NOT IN PLACE. ENSURE ALL ARE FULLY ATTACHED TO BUILDING.
Occupancy Inspection - Planning Passed 05/09/2014
Occupancy Inspection - Codes Commercial Full C of O 5/9/2014 at 12:00 AM 05/09/2014
Misc
Resolved
05/09/2014
RESOLVE ANY PLANNING DEPARTMENT AND FINISH SITEWORK ISSUES.
Underground Electrical Inspection - Commercial Passed 4/17/2014 at 12:00 AM 05/09/2014
Misc
Resolved
05/09/2014
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM LP#8 ~ 75 LF NE; FROM LP #1 TO #2; FROM LP #4 WEST 66'; FROM #4 TO #5; FROM #4 TO QUAZITE BOX 15' WEST; FROM #3 TO 80' N/NE; FROM #3 TO #4; FROM #5 TO 180 LF WEST; AT BOLLARDS AT EAST FRONT OF BUILDING MINUMUM 6" DEPTH APPROVED BASED ON "GENERAL" LINE IN NEC TABLE 300.5; 1" PVC CONDUITS TRENCHED FROM [A] TO [B] TO [C] TO [D] + [E] TO [F] TO LP#11 + RECEPTACLE PEDESTALS @ [G] + QUAZITE BOX @ [H] AS MARKED ON SITE ELECTRICAL PERMIT PRINT; MORE AS OF 4/11/14;
Misc
Resolved
05/09/2014
@ SOUTH SIDE OF PROPERTY, WEST SIDE OF GATE TO JUNCTION BOX APPROVED. RUN AT EAST SIDE OF GATE, CONDUIT APPROVED BETWEEN TWO EXISTING POLES
Driveway Inspection Passed 03/19/2015
Documents & Images
Date Uploaded File Type Document Name
03/19/2013 Letter Plan Review Conditions
04/10/2013 Letter Plan Review Conditions
04/11/2013 Letter Building Permit
06/07/2013 Letter Inspection Summary
06/10/2013 Letter Inspection Summary
06/11/2013 Letter Inspection Summary
06/14/2013 Letter Inspection Summary
06/24/2013 Letter Inspection Summary
06/25/2013 Letter Fire Building Plan Review
06/26/2013 Letter Inspection Summary
06/27/2013 Letter Fire Building Plan Review
06/27/2013 Letter Inspection Summary
06/28/2013 Letter Inspection Summary
07/08/2013 Letter Inspection Summary
07/10/2013 Letter Inspection Summary
07/16/2013 Letter Inspection Summary
07/30/2013 Letter Inspection Summary
07/30/2013 Letter Inspection Summary
08/05/2013 Letter Inspection Summary
08/08/2013 Letter Inspection Summary
08/09/2013 Letter Inspection Summary
08/13/2013 Letter Inspection Summary
08/14/2013 Letter Inspection Summary
08/15/2013 Letter Inspection Summary
08/16/2013 Letter Inspection Summary
08/20/2013 Letter Inspection Summary
08/21/2013 Letter Inspection Summary
08/21/2013 Letter Inspection Summary
08/28/2013 Letter Inspection Summary
08/29/2013 Letter Inspection Summary
09/05/2013 Letter Inspection Summary
09/09/2013 Letter Inspection Summary
09/12/2013 Letter Inspection Summary
09/12/2013 Letter Inspection Summary
09/13/2013 Letter Inspection Summary
09/17/2013 Letter Fire (Sprinkler) Plan Review
09/26/2013 Letter Inspection Summary
09/27/2013 Letter Inspection Summary
09/30/2013 Letter Inspection Summary
10/07/2013 Letter Inspection Summary
10/08/2013 Letter Inspection Summary
10/21/2013 Letter Inspection Summary
11/01/2013 Letter Inspection Summary
11/12/2013 Letter Inspection Summary
11/22/2013 Letter Inspection Summary
11/26/2013 Letter Inspection Summary
11/27/2013 Letter Inspection Summary
12/03/2013 Letter Inspection Summary
12/20/2013 Letter Inspection Summary
12/26/2013 Letter Inspection Summary
12/30/2013 Letter Inspection Summary
01/02/2014 Letter Inspection Summary
01/06/2014 Letter Inspection Summary
01/15/2014 Letter Inspection Summary
01/16/2014 Letter Inspection Summary
01/16/2014 Letter Inspection Summary
01/16/2014 Letter Fire (Alarm) Plan Review Notice
01/22/2014 Letter Inspection Summary
01/30/2014 Letter Inspection Summary
02/14/2014 Letter Inspection Summary
02/18/2014 Letter Inspection Summary
02/21/2014 Letter Inspection Summary
02/25/2014 Letter Inspection Summary
02/27/2014 Letter Inspection Summary
03/07/2014 Letter Inspection Summary
03/07/2014 Letter Inspection Summary
03/18/2014 Letter Inspection Summary
03/19/2014 Letter Inspection Summary
03/20/2014 Letter Inspection Summary
03/21/2014 Letter Inspection Summary
03/21/2014 Letter DOC032114-001.pdf
03/21/2014 Letter Inspection Summary
03/24/2014 Letter Inspection Summary
03/25/2014 Letter Inspection Summary
03/25/2014 Letter Inspection Summary
03/26/2014 Letter Inspection Summary
03/27/2014 Letter Inspection Summary
03/28/2014 Letter Codes Temporary Certificate of Occupancy
04/01/2014 Letter Inspection Summary
04/01/2014 Letter Inspection Summary
04/07/2014 Letter Inspection Summary
04/08/2014 Letter Inspection Summary
04/08/2014 Letter DOC040814-005.pdf
04/09/2014 Letter Inspection Summary
04/17/2014 Letter Inspection Summary
04/29/2014 Letter Codes Temporary Certificate of Occupancy
05/09/2014 Letter Field Certificate of Occupancy
05/23/2014 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home