Review Type |
Outcome |
Est. Completion Date |
Completed |
Sprinkler Plan Review
|
Released for Construction
|
|
12/06/2012
|
|
Brian Austerman
|
|
Misc
Corrective Action Required
Call 816-969-1300 to schedule flow and alarm test
|
|
|
Alarm Plan Review
|
Released for Construction
|
|
11/30/2012
|
|
Brian Austerman
|
|
Misc
Corrective Action Required
Per phone conversation with Bill there will be an outside horn strobe that is activated off of the flow switch only. Not to sound on general fire alarm but waterflow only. Verified at alarm testing
|
|
Misc
Corrective Action Required
Duct detectors shall initiate unit shut down and transmit a supervisory signal to the alarm panel, verifiedf at alarm testing
|
|
Misc
Corrective Action Required
Call 816-969-1300 to schedule alarm testing prior to the final inspection
|
|
|
Internal Plan Review (Res)
|
Approved
|
11/30/2012
|
11/01/2012
|
|
Mike Weisenborn
|
|
True
|
License Tax Codes
|
Approved
|
11/30/2012
|
11/01/2012
|
|
Mike Weisenborn
|
|
|
Building Plan Review
|
Approved
|
09/14/2012
|
09/12/2012
|
|
Mike Weisenborn
|
|
Business License
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required - Prior to permit approval, provide the name of the licensed general contractor for the project.
|
|
License contractors
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances.
Action required - Prior to permit approval, provide the names of the licensed mechanical, electrical and plumbing sub-contractors for the project.
|
|
Misc
Documentation from a structural engineer licensed in the State of Missouri, is required for the installation of the new mechanical equipment on the roof.
Action required - Provide documentation stating that the existing roof system is capable of supporting the new equipment or provide details for the required alterations to the structure. This information is required to be signed and sealed.
Mike Weisenborn 09/12/2012 9:58 AM - Additional information has been provided.
|
|
Misc
Plumbing drawings/details have not been provided for the alterations to the systems.
Action required - Provide information for the alterations to the waste, vent, water and gas systems.
Mike Weisenborn 09/12/2012 9:59 AM - Additional information has been provided
|
|
Bldg - Exit signage - Where required
2006 IBC 1011.1 - Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in a corridor is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign.
Action required - Two means of egress is required from the storage room due to common path of travel requirements. Provide additional exit signage at the doors from the storage room to the sales area.
Mike Weisenborn 09/12/2012 9:59 AM - Corrections have been made.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
09/14/2012
|
09/07/2012
|
|
Brian Austerman
|
|
Knox box required
Corrective Action Required
2006 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Action Required: Call 816-969-1300 to obtain an application
|
|
Construction documents - Fire protection systems
Corrective Action Required
2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action Required: This is deffered as it is a seperate submittal
|
|
Construction documents for fire alarm systems
Corrective Action Required
2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action Required: This is deferred as it is a separate submittal
|
|
|
Internal Plan Review (Res)
|
Rejected
|
08/13/2012
|
08/13/2012
|
|
Mike Weisenborn
|
|
|
Zoning Review
|
Approved
|
08/13/2012
|
08/13/2012
|
|
Mike Weisenborn
|
|
|
Building Plan Review
|
Rejected
|
08/13/2012
|
08/13/2012
|
|
Mike Weisenborn
|
|
Business License
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required - Prior to permit approval, provide the name of the licensed general contractor for the project.
|
|
License contractors
Corrective Action Required
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances.
Action required - Prior to permit approval, provide the names of the licensed mechanical, electrical and plumbing sub-contractors for the project.
|
|
Misc
Corrective Action Required
Documentation from a structural engineer licensed in the State of Missouri, is required for the installation of the new mechanical equipment on the roof.
Action required - Provide documentation stating that the existing roof system is capable of supporting the new equipment or provide details for the required alterations to the structure. This information is required to be signed and sealed.
|
|
Misc
Corrective Action Required
Plumbing drawings/details have not been provided for the alterations to the systems.
Action required - Provide information for the alterations to the waste, vent, water and gas systems.
|
|
Bldg - Exit signage - Where required
Corrective Action Required
2006 IBC 1011.1 - Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in a corridor is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign.
Action required - Two means of egress is required from the storage room due to common path of travel requirements. Provide additional exit signage at the doors from the storage room to the sales area.
|
|
|
Fire Plan Review
|
Approved
|
08/13/2012
|
08/08/2012
|
|
Brian Austerman
|
|
Misc
Corrective Action Required
FDC needs labeled showing what address it serves
|
|
Misc
Corrective Action Required
Door to riser room needs labeled as "SPRINKLER ROOM"
|
|
Misc
Corrective Action Required
907.12 Duct smoke detectors.
Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection.
Action Required: For all units 2,000 CFM or greater duct detection is required. Activation will shut down the unit and send a supervisory signal to the panel. Verified at alarm testing
|
|
Construction documents - Fire protection systems
Corrective Action Required
2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action Required: Provide plans for approval for any sprinkler modifications
|
|
Construction documents for fire alarm systems
Corrective Action Required
2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action Required: Provide alarm plans for approval for any alarm system modifications
|
|
Portable fire extinguishers - general
Corrective Action Required
2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Action Required: Provide a minimum size of 2A10B:C extinguishers
|
|
Address numbers required
Corrective Action Required
2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Action Required: Provide addressing on all exterior doors leading into the space
|
|
|