Summary
PL2025019
100 NE Douglas St - Rezoning and conversion
Commercial Rezoning with Preliminary Development Plan
Commercial Rezoning with Preliminary Development Plan
City Council
01/23/2025
Thompson, David W & Kasey L
Rezoning from R-1 to TNZ. Conversion of a single-family home into a business office.
Locations
Contacts
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Thompson, David W & Kasey L, Address:100 NE Douglas St  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 02/25/2025 02/25/2025
Adair Bright
Miscellaneous Correction
Corrective Action Required
02/25/2025

Parking lot screening should be opaque to a height of 2.5-ft. Please add additional shrubs or evergreens around the deciduous tree that is proposed to remain.
Engineering Review Approved with Conditions 02/25/2025 02/18/2025
Susan Nelson, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
02/18/2025

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
02/18/2025

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
02/18/2025

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
02/18/2025

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Future Repair Work
Corrective Action Required
02/18/2025

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Corrective Action Required
02/18/2025

On the Final Development Plan, please note that only ornamental trees and shrubs may be planted within any easement.
Planning Review Corrections 02/07/2025 02/07/2025
Adair Bright
Corrective Action Required
02/07/2025

Provide a rezoning exhibit.
Corrective Action Required
02/07/2025

Provide a legal description via word or a PDF (we need to be able to copy this for the ordinance).
Corrective Action Required
02/07/2025

Show the proposed parking lot setback to the west and south property lines.
Corrective Action Required
02/07/2025

Provide a typical individual stall dimension.
Corrective Action Required
02/07/2025

Provide a dimension for the proposed sidewalk.
Corrective Action Required
02/07/2025

Provide additional shrubs and evergreens along the west to help screen the parking lot from the adjacent residential.
Corrective Action Required
02/07/2025

As a heads up - a minor plat will be required. Also, parking lot lighting and wall packs will be prohibited per the TNZ district.
Corrective Action Required
02/07/2025

Is the "kennel" proposed to remain?
Engineering Review Corrections 02/07/2025 02/06/2025
Susan Nelson, P.E.
Corrective Action Required
02/06/2025

Please provide a 10-foot-wide utility easement along the right-of-way of Douglas St. and Maple St. Show and document on the minor plat.
Traffic Review No Comments 02/07/2025 02/05/2025
Erin Ralovo
Fire Review Approved with Conditions 02/07/2025 02/04/2025
Jim Eden
Code Statement
Corrective Action Required
02/04/2025

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. Conversion of the house from residential to office use shall meet the requirements of the fire code.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Commercial Rezoning and Preliminary Development Plan fee $3,375.00 $3,375.00 Paid 01/24/2025
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 01/24/2025
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 01/24/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 03/27/2025 5:00 PM Council Chambers 03/27/2025 05:00 PM
Agenda Item
Approved
03/27/2025
City Council Public Hearing 04/22/2025 6:00 PM Council Chambers 04/22/2025 06:00 PM
Agenda Item
Pending
04/22/2025
City Council Ordinance 2nd Reading 05/06/2025 6:00 PM Council Chambers 05/06/2025 06:00 PM
Agenda Item
Pending
05/06/2025
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home