Summary
PL2024269
Douglas Station Lot 1
Minor Plat
Minor Plat
Approved
10/17/2024
DOUGLAS STATION PARTNERS LLC
Minor Plat
Locations
Contacts
DOUGLAS STATION PARTNERS LLC, Address:8305 NE 89TH ST  
Matthew J Schlicht, Address:50 SE 30th Street, Phone:(816) 623-9888  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Matthew J Schlicht, Address:50 SE 30th Street, Phone:(816) 623-9888  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 04/07/2025 04/07/2025
Hector Soto Jr.
Corrective Action Required
04/07/2025

VACATION OF RIGHT-OF-WAY. The associated vacation of right-of-way application (Appl. #PL2024-093) shall complete the approval process and have the ordinance number added to the plat, instead of the County recording number, prior to begining the signature process. The City Council public hearing is scheduled for April 8, 2025, and April 15, 2025, for the public hearing and second ordinance reading, respectively.
Engineering Review No Comments 04/07/2025 04/04/2025
Gene Williams, P.E.
GIS Plat Review No Comments 04/07/2025 03/31/2025
Kathy Kraemer
GIS Plat Review Corrections 02/11/2025 02/11/2025
Kathy Kraemer
Corrective Action Required
02/06/2025

Your POB is wrong. You reference it, but do not actually incorporate the 4.22 ROW that was given to LSMO on Doc 2022E0005322. The coordinates before the 4.22 ROW was taken indicate N:306934.462m E:860131.444m which is almost your exact coordinate there. It's expected, then, to be off on the X coordinate, and it is....coordinate is closer to 860132.726m, which is 1.287m, which, converts to 4.22 Please factor in the ROW of 4.22 and adjust your coordinate. Also double check the traverse because starting 4.22 ft off affects the plat lines, and the bearings on the ROW doc don't match the plat.
Corrective Action Required
02/06/2025

Plat does not close. Off by ~3ft.
Corrective Action Required
02/06/2025

Please put all plat dimensions on the outside of the plat, and lot dimensions inside the lot lines. The one near coordinate 4 is missing the plat dimension.
Engineering Review Corrections 02/11/2025 02/11/2025
Gene Williams, P.E.
Corrective Action Required
02/11/2025

No easements are dedicated by this plat because you are defining "utility easement" as "U/E", and the plat shows "U.E.". Ensure all easement callouts on the plat match what is shown on the dedication language. Correction required.
Corrective Action Required
02/11/2025

Southwest corner of the plat shows an easement that is tapered. This easement should be ten (10) feet minimum and not tapered. Correction required.
Planning Review Corrections 02/11/2025 02/10/2025
Hector Soto Jr.
Corrective Action Required
02/10/2025

VACATION OF RIGHT-OF-WAY. The associated vacation of right-of-way application (Appl. #PL2024-093) shall complete the approval process and have the approving ordinance recorded with the County prior to approval of the minor plat. The recording information shall be added to the plat. Staff is tentatively targeting the March 13, 2025, Planning Commission meeting for the initial public hearing for the requested vacation of right-of-way. The subsequent City Council meeting dates would tentatively be scheduled for April 8, 2025, and April 15, 2025, for the public hearing and second ordinance reading, respectively.
Corrective Action Required
02/10/2025

SIDEWALKS. Extend the linework representing the existing 5' sidewalk along SW Main St to the southern boundary of the proposed lot.
Engineering Review Corrections 11/01/2024 11/01/2024
Gene Williams, P.E.
Corrective Action Required
11/01/2024

Splitting this plat into two (2) lots will change the Final Development Plan review process significantly in terms of sanitary sewer and water line review. Why are two (2) lots being proposed? The Final Development Plan was reviewed based on one (1) lot, not two (2) lots. Correction and explanation required.
Corrective Action Required
11/01/2024

No other comments are provided until the above issue has been resolved.
Traffic Review No Comments 11/01/2024 10/31/2024
Erin Ralovo
Planning Review Corrections 11/01/2024 10/29/2024
Hector Soto Jr.
Corrective Action Required
10/29/2024

LOT LAYOUT. What is the purpose of keeping the subject property as two separate lots (albeit with adjusted lot lines from what currently exists) versus making the entire associated apartment development a single lot? Is the idea that the apartment development will be phased between the two proposed lots? If the intent is phasing, the associated FDP shows no phasing line(s) at all, nor does it show the proposed lot lines from this minor plat. The proposed lot lines need to be overlayed onto the associated FDP for review.
Corrective Action Required
10/29/2024

STREET NAME. This area is a transition point between the NW and NE address grid quadrant. Add a street name label for NE Sycamore St to the right of the street name label for NW Sycamore St.
Corrective Action Required
10/29/2024

ADDRESSES. Label the lots with their respective addresses: Lot 1 - 3 NE Sycamore St; and Lot 2 - 11 NE Sycamore St.
Corrective Action Required
10/29/2024

SIDEWALKS. Add and label 5' wide sidewalks along the NW/NE Sycamore St, NW Sloan St and NW Main St street frontages.
Corrective Action Required
10/29/2024

EASEMENTS. 1) A general utility easement shall be dedicated as part of this plat for the entire portion of the ROW that is proposed to be vacated along the west boundary of the subject property so that there is a continuous easement from the west edge of the existing 10' U/E to the new ROW boundary. 2) With the creation of two lots for the subject development, a blanket cross-access easement between Lots 1 and 2 shall be required. Add a dedication paragraph to that effect to the plat.
Corrective Action Required
10/29/2024

CITY SIGNATURE BLOCK. Replace Josh Johnson's name and title with the following: Aimee Nassif, AICP, Deputy Director of Development Services.
Corrective Action Required
10/29/2024

ROW BOUNDARY. The property boundary configuration at the intersection of NW Main St and NW Sloan St doesn't match the boundary of the proposed ROW vacation under Appl. #PL2024-093. Which is correct? Revise the ROW vacation exhibit, associated FDP and associated minor plat as needed to reflect the correct configuration.
Fire Review No Comments 11/01/2024 10/25/2024
Jim Eden
GIS Plat Review Corrections 11/01/2024 10/23/2024
Kathy Kraemer
Corrective Action Required
10/23/2024

Please make sure all lot dimensions are on the plat. Lot 1 is missing several, and lot 2 is missing 1
Corrective Action Required
10/23/2024

The south line is incorrect. It should be 594.45, because 4.22 was taken for ROW on the referenced doc.
Corrective Action Required
10/23/2024

Please provide ITB on curve near Sloan and Main, the R=380. After N25-25-39E/22.42
Corrective Action Required
10/23/2024

Vacation must precede platting. Please reference the recorded vacation on the plat. As of now, it is not vacated.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Minor Plat fee $725.00 $725.00 Paid 02/06/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
10/17/2024 Plans MINOR PLAT_REV 0_PL2024269
11/06/2024 Letter Applicant Letter - MP (DRCL)
02/04/2025 Plans MINOR PLAT 1 LOT_REV 1_PL2024269
02/04/2025 Letter CITY COMMENT RESPONSE LETTER
02/06/2025 Receipt Receipt for transaction:2025-000780
02/12/2025 Letter Applicant Letter - MP (DRCL)
03/31/2025 Plans MINOR PLAT 1 LOT_REV 2_PL2024269
04/08/2025 Letter Applicant Letter - MP (DRCL)
05/01/2025 Routing Sheet Minor Plat Signature Routing
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home