Planning Application Status

PL2024251




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2024251
Final Plat - Oldham Village second plat
Final Plat
Final Plat
Recorded
09/27/2024
OLDHAM INVESTORS LLC
Second final plat for Oldham Village. Lots 12A - 18 & Tract E
Locations
Contacts
OLDHAM INVESTORS LLC, Address:7200 W 132ND ST STE 150  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
RYNARD INVESTMENT PROPERTIES LLC, Address:312 SW GREENWICH DR STE 196  
BRESETTE DENNIS, Address:29 O ST  
GG HOLDING LLC, Address:14433 MAPLE ST  
R P FIELDS INVESTMENTS LLC, Address:1301 TABITHA LN  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 05/07/2025 05/08/2025
Hector Soto Jr.
Corrective Action Required
05/08/2025

TITLE BLOCK. Fill in the missing lot number in the plat title block reference to the complete plat name. It currently references Lots 12A - (no end range). Fill in the missing 18 to the lot range.
Corrective Action Required
05/08/2025

ROW TO BE VACATED. 1) Revise the note labeled on the portion of ROW above the proposed Tract E from "Existing City R/W Tract B of Ord # Bill-25-063" to "Existing City R/W to be Vacated. Tract B of Ord #10103". 2) Revise the note labeled on the existing portion of SW Jefferson St that is to be vacated to read, "Ex. R/W to be vacated by Ord #10103. See note No. 10". Also, revise the end of Note 10 from "...vacated by separate document" to "...vacated by Ord #10103."
Corrective Action Required
05/08/2025

CC&Rs. Submit a copy of CC&Rs for staff to review that said document contains the required common property language from UDO Section 4.290.
Planning Review Corrections 04/28/2025 04/29/2025
Hector Soto Jr.
Corrective Action Required
04/29/2025

CITY SIGNATURE BLOCK. Update the Planning Commission Secretary's name from Terry Trafton to Charles E. Touzinsky, III.
Corrective Action Required
04/29/2025

ADDRESSES. 1) Based on the future orientation of the building proposed for Lot 18, staff now assigns of said lot as 10 SW Persels Rd. 2) Add an additional label to make it clear that Lot 13 is addressed as 1111 SW Jefferson St. 3) Staff has re-sent all draft address to our Fire Dept and GIS group to get final approval. Any further address revisons will be provided, if necessary.
Planning Review No Comments 01/15/2025 01/16/2025
Hector Soto Jr.
GIS Plat Review No Comments 12/31/2024 01/02/2025
Kathy Kraemer
Engineering Review Approved with Conditions 12/31/2024 12/31/2024
Gene Williams, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
12/31/2024

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
12/31/2024

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
12/31/2024

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #06 Land Disturbance
Corrective Action Required
12/31/2024

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
Planning Review Approved with Conditions 12/31/2024 12/31/2024
Hector Soto Jr.
Corrective Action Required
12/31/2024

APPLICATION. Submit a completed and signed application and Ownership Authorization form.
Corrective Action Required
12/31/2024

SIDEWALKS. A minimum 5' sidewalk shall be required along the north side of SW Persels Rd.
Corrective Action Required
12/31/2024

COMMON AREA - CC&RS. Submit a copy of the CC&Rs for the proposed development for review that includes the required common property language from UDO Section 4.290. The plat shall not be released for recording until such time as the CC&Rs have been submitted and reviewed by staff for compliance. No immediate is required for this comment.
GIS Plat Review Corrections 12/17/2024 12/18/2024
Kathy Kraemer
Corrective Action Required
12/18/2024

Plat does not close <1ft. I can't tell exactly where it is off, but possibly that first line from POB, as the misclosure as Direction/Distance is N 88-30-5 W, 1.062 ft and looks a tad off compared to the georeferenced image, but it could be any east-west line throwing the misclosure.
Traffic Review No Comments 12/17/2024 12/17/2024
Erin Ralovo
Engineering Review Corrections 12/17/2024 12/17/2024
Gene Williams, P.E.
Corrective Action Required
12/17/2024

Plat calls out "S/E" rather than "S.E." as defined in the dedication language. In other words, no easement is defined due to the mismatch. Ensure the callout on the plat matches the dedication language. Correction required.
Planning Review Approved with Conditions 12/17/2024 12/17/2024
Hector Soto Jr.
Corrective Action Required
12/17/2024

APPLICATION. Submit a completed and signed application and Ownership Authorization form.
Corrective Action Required
12/17/2024

SIDEWALKS. A minimum 5' sidewalk shall be required along SW Persels Rd.
Corrective Action Required
12/17/2024

ACCESS EASEMENTS. 1) Add a note to the plat referencing the CC&Rs for dedication of cross-access easements. 2) Provide a copy of the CC&Rs for review of the cross-easement dedication language.
Corrective Action Required
12/17/2024

COMMON AREA - CC&RS. Submit a copy of the CC&Rs for the proposed development for review that includes the required common property language from UDO Section 4.290. The plat shall not be released for recording until such time as the CC&Rs have been submitted and reviewed by staff for compliance.
Corrective Action Required
12/17/2024

CITY SIGNATURE BLOCK. Add the name of Terry Trafton to the Planning Commission Secretary signature line.
Corrective Action Required
12/17/2024

EXISTING RIGHT-OF-WAY. There is an east-west segment of right-of-way that extends west of the current SW Jefferson St alignment just south of the alignment of the short segment of SW Oldham Pkwy that "T"s into M-291 Hwy. Show, label and dimension said section of right-of-way to be vacated and label it as "to be vacated".
Planning Review Corrections 11/26/2024 11/26/2024
Hector Soto Jr.
Corrective Action Required
11/26/2024

APPLICATION. Submit a completed and signed application and Ownership Authorization form. Additionally, the application fee has not yet been paid.
Corrective Action Required
11/26/2024

LEGAL DESCRIPTION. Provide a copy of the legal description in Word format.
Corrective Action Required
11/26/2024

SIDEWALKS. Darken the linework and text showing and calling out the proposed 10' sidewalks along SW Oldham Pkwy and SW Jefferson St. A minimum 5' sidewalk shall be required along SW Persels Rd. Please consult with the City Traffic Engineer to determine if a 10' wide sidewalk will be required along SW Persels Rd.
Corrective Action Required
11/26/2024

PROPERTY LINES. Label the distance and bearing for the south property line of Lot 14.
Corrective Action Required
11/26/2024

UTILITY EASEMENTS. 1) Show, label and dimension all proposed easements. None are shown on the drawing. 2) The plat includes a Sanitary Sewer Easement dedication paragraph, but no sanitary sewer easement (S.E) is shown on the drawing. Remove the dedication paragraph if no specific sanitary sewer easement will be dedicated as part of the subject plat.
Corrective Action Required
11/26/2024

STREETS. Label the ROW width for SW Oldham Pkwy.
Corrective Action Required
11/26/2024

ACCESS EASEMENTS. Show and dedicate all cross-access easements needed to serve the development on the subject plat.
Corrective Action Required
11/26/2024

ERRANT LINEWORK. What does the unlabeled north-south solid line that runs through Lots 12A, 13 and 14 represent?
Corrective Action Required
11/26/2024

COMMON AREA. 1) Submit a copy of the CC&Rs for the proposed development for review that includes the required common property language from UDO Section 4.290. The plat shall not be released for recording until such time as the CC&Rs have been submitted and reviewed by staff for compliance. 2) Revise the common area dedication note to reference Tract E instead of Tracts A-D.
Corrective Action Required
11/26/2024

CITY SIGNATURE BLOCK. 1) Change the name of Josh Johnson to Aimee Nassif, AICP, and the listed title to Deputy Director of Development Services. 2) The approval language and City signature lines on the drawing are those for a minor plat and shall be changed to those for a final plat. Please note that the same was mistakenly done on the associated plat for Oldham Village 1st Plat, but was overlooked on the review. Update the approval language and signature lines on both final plats.
Corrective Action Required
11/26/2024

EXISTING RIGHT-OF-WAY. Show, label and dimension the existing SW Jefferson St and SW Oldham Pkwy right-of-way boundaries that are proposed to be vacated and label them as "to be vacated".
Corrective Action Required
11/26/2024

ACCESS RESTRICTION. Add a note to the plat stating that no direct access onto M-291 Hwy shall be allowed from Lots 13-18. Add a note or symbology to each affected lot that references to the access restriction note. Please do the same for Lots 5 and 8-10 on the associated Oldham Village 1st Plat.
Corrective Action Required
11/26/2024

ADDRESSES. Addresses for Oldham Village 1st and 2nd Plat will be provided under separate cover.
Engineering Review Corrections 11/26/2024 11/26/2024
Gene Williams, P.E.
Corrective Action Required
11/26/2024

Minimum ten (10) foot general utility easements required on all street frontage. Correction required.
Corrective Action Required
11/26/2024

Sanitary sewer easements were not shown. Correction required.
Traffic Review Corrections 11/26/2024 11/25/2024
Erin Ralovo
Corrective Action Required
11/25/2024

Sidewalk on Jefferson is only shown to Lot 18 and not the full length of the development. Sidewalks should be built the full extent of the development.
GIS Plat Review Corrections 11/26/2024 11/19/2024
Kathy Kraemer
Corrective Action Required
11/15/2024

Coordinates are incorrect. #1 and #2 are good, 4 and 6 are the same and actually plot at 1st plat control point 6, and the rest of these coord look like copy pasta from 1st plat.
Corrective Action Required
11/15/2024

A lot of this plat is in current ROW (inc Market St), whilst dedicating ROW for reconfig Oldham and Jefferson. Are there recorded documents vacating this ROW? I am not sure where MoDot owns ROW and where we own ROW based on ours or JaCo's maps, so any vacations would have to be based on ownership: JaCo/LSMO vacation and any MoDot vacations. Additionally, any new parts of roadway should be dedicated, and any parts of the plat that incorporate existing roadway to remain should have a disclaimer in the description, to the effect of "except those parts in existing roadway."
Corrective Action Required
11/15/2024

Line dimension inconsistent between 1st plat and second plat along the south line of the oldham stub; 155.69 vs 155.76
Corrective Action Required
11/15/2024

Plat does not close within 1 ft. Even when adjusting for an error (see previous correction), it's still off. Since I cannot verify any lines hitting at the coordinates (see also previous correction), I can see that after drawing from POB, where the line should hit at coordinate 1, it actually hits at N:303378.618 E:860710.114
Corrective Action Required
11/19/2024

Error on north line of lot 13: 247.41 is 30ft too long
Corrective Action Required
11/19/2024

Please use hashmarks to identify where dimensions start and stop.
Corrective Action Required
11/19/2024

Please put dimension that is missing for lot 12A: north line near 155.89
Corrective Action Required
11/19/2024

Missing bearing and dimension south line of lot 14
Fire Review No Comments 11/26/2024 11/12/2024
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
Final Plat fee $871.00 $871.00 Paid 12/03/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 01/09/2025 5:00 PM Council Chambers 01/09/2025 05:00 PM
Agenda Item
Approved
01/09/2025
City Council Ordinance 1st Reading 01/21/2025 6:00 PM Council Chambers 01/21/2025 06:00 PM
Agenda Item
Approved
City Council Ordinance 2nd Reading 05/20/2025 6:00 PM Council Chambers 05/20/2025 06:00 PM
Agenda Item
Approved
05/20/2025
Documents & Images
Date Uploaded File Type Document Name
11/12/2024 Plans FINAL PLAT_Rev 0_PL2024251
11/26/2024 Letter Applicant Letter_Rev 0_PL2024251
12/03/2024 Receipt Receipt_PL2024251
12/10/2024 Plans FINAL PLAT_Rev 1_PL2024251
12/10/2024 Letter CITY COMMENT RESPONSE_Rev 1_PL2024251
12/18/2024 Letter Applicant Letter_Rev 1_PL2024251
12/20/2024 Plans FINAL PLAT_Rev 2_PL2024251
12/20/2024 Letter CITY COMMENT RESPONSE_Rev 2_PL2024251
01/02/2025 Letter Staff Report_PL2024251
01/02/2025 Letter Applicant Letter_Rev 2_PL2024251
01/08/2025 Plans FINAL PLAT_Rev 3_PL2024251
01/13/2025 Ordinance/Resolution Ordinance
01/14/2025 Declaration of Covenants Restrictions and Easements
01/15/2025 Application Form Signed application and ownership form_PL2024251
04/02/2025 Recorded Document Quitclaim Deed - MODOT to Oldham Investors - Inst #2025E0017762 [RECORDED 3_17_2025]
04/21/2025 Plans FINAL PLAT_Rev 4_PL2024251
04/29/2025 Letter Applicant Letter_Rev 4_PL2024251
04/30/2025 Plans FINAL PLAT_Rev 5_PL2024251
05/06/2025 Agreement (executed) Performance Bond- Public-Executed_Oldham Village
05/08/2025 Letter FP Applicant Letter
07/21/2025 Routing Sheet Final Plat Signature Routing
08/29/2025 Recorded Document Recorded_Oldham Village Second Plat Lots 12A-18 & Tract E
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home