Planning Application Status

PL2023169




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2023169
The Learning Experience at Arborwalk West
Commercial Final Development Plan
Commercial Final Development Plan
Approved
06/23/2023
150 HIGHWAY LEES SUMMIT LLC
Locations
Contacts
150 HIGHWAY LEES SUMMIT LLC, Address:7217 W 110TH ST  
CHRISTIE DEV ASSOC LLC, Address:7387 WEST 162ND STREET STE 200, Phone:(913) 649-4500  
SM ENGINEERING, Address:919 W STEWART RD, Phone:(785) 341-9747  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review Approved with Conditions 09/28/2023 10/02/2023
Erin Ralovo
Corrective Action Required
10/02/2023

All public improvements need to be complete before final occupancy can be granted.
Planning Review No Comments 09/28/2023 10/02/2023
Shannon McGuire
Engineering Review Approved with Conditions 09/28/2023 09/22/2023
Sue Pyles, P.E.
DE C&O #06 Land Disturbance
Corrective Action Required
09/22/2023

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #11 Pavement Thickness
Corrective Action Required
09/22/2023

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
09/22/2023

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
09/22/2023

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), the water tap and meter setup fee, and the sanitary sewer development fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $71,212.84
DE Future Repair Work
Corrective Action Required
09/22/2023

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review Approved with Conditions 09/28/2023 09/21/2023
Scott Ready
Code Statement
Corrective Action Required
09/21/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Building Codes Review No Comments 09/28/2023 09/21/2023
Scott Ready
Building Codes Review No Comments 09/08/2023 09/11/2023
Joe Frogge
Miscellaneous Correction
Resolved
09/11/2023

Specify sanitary pipe materials.
Traffic Review Approved with Conditions 09/08/2023 09/11/2023
Erin Ralovo
Corrective Action Required
09/11/2023

Public Improvement plans must be approved and constructed with this application.
Corrective Action Required
09/11/2023

Modot will be required to approve the turn lane improvements.
Engineering Review Corrections 09/08/2023 09/08/2023
Sue Pyles, P.E.
Corrective Action Required
09/08/2023

The response letter references Raintree Village Sanitary plans with a 9/29/22 revision date. The approved set of plans for that project has a revision date of 2/28/23. The approved plans has a different end location than the 9/29 set because the two projects were no longer being designed together. Please revise these plans accordingly. The public sanitary main must be extended to the west plat boundary.
Planning Review No Comments 09/08/2023 09/07/2023
Shannon McGuire
Fire Review Approved with Conditions 09/08/2023 09/07/2023
Jim Eden
Code Statement
Corrective Action Required
08/31/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Engineering Review Corrections 08/07/2023 08/08/2023
Sue Pyles, P.E.
Corrective Action Required
08/07/2023

Please submit the following: • Engineer's Estimate of Probable Construction Costs. • SWPPP and a copy of the MDNR Land Disturbance Permit.
Corrective Action Required
08/08/2023

Please include the following in the plan set: • ADA-ramp specific designs for each ramp. • Standard details for all items in the plan set.
Corrective Action Required
08/08/2023

Please remove the Service Connection/Meter Well standard detail (duplicate) and the Trenching/Patching Roadway standard detail (not needed due to water line connection point revision).
Corrective Action Required
08/08/2023

The plans show the public sanitary sewer along M150 being extended to the west property line. This public extension is terminating at the MH shown on the east side of the property.
Corrective Action Required
08/08/2023

Please relocate the point of connection to the existing water main to a location not under pavement. This will require the connection point to move to the north 45-50 feet.
Corrective Action Required
08/08/2023

Connection of the domestic water line must be made on prior to the backflow vault. The water meter and irrigation meters need to be located just inside the utility easement.
Corrective Action Required
08/08/2023

The proposed public storm sewer is shown as public along the entire east side of the lot. The public storm sewer will only be from the structure located just south of the entrance to the connection to existing along M150. Please include the storm sewer to the north in this plan set.
Corrective Action Required
08/08/2023

Include material type for the sanitary sewer and water lines.
Corrective Action Required
08/08/2023

Is the intent to grade Lots 1 & 2 but not construct any storm sewer? It’s hard to tell because it isn’t shown in the same line type as the other proposed improvements throughout the plan set. Please clarify.
Corrective Action Required
08/08/2023

Design and Construction Manual Section 5604.5 requires a minimum drop across a storm structure. This is a requirement for all structure types, including Nyloplast.
Planning Review Corrections 08/07/2023 08/07/2023
Shannon McGuire
Corrective Action Required
08/07/2023

Legal Description - A legal description which accurately describes the limits of the property shall be provided. As the property has not yet been platted you may provide the metes and bounds description.
Corrective Action Required
08/07/2023

Oil & Gas Wells – Please shoe the location of all oil and/or gas wells within the subject property. If none are present please add a note and cite your source of information. A visual inspection of the property is not adequate.
Corrective Action Required
08/07/2023

Photometric Diagram - Please update the photo metric plan to reflect the approved site plan.
Corrective Action Required
08/07/2023

Lighting Spec Sheets – Please provide the manufacturer’s specification sheets for proposed exterior lighting to include both parking lot pole mounted and wall mounted fixtures. The specification sheets shall indicate the exact fixture to be used.
Corrective Action Required
08/07/2023

Mechanical Screening – will there be any ground mounted mechanical equipment? Id there is please show the location, size, and type of material to be used in all screening of ground mounted mechanical equipment. Also provide the manufacturer’s specification sheets for proposed mechanical equipment to be used.
Corrective Action Required
08/07/2023

Ground cover - Open areas not covered with other materials shall be covered with sod. Please add a note to the landscaping plan stating compliance with this requirement.
Corrective Action Required
08/07/2023

Trash enclosures – Please proved a detailed drawing (elevations) of enclosure and screening methods to be used in connection with trash storage containers on the property.
Corrective Action Required
08/07/2023

Parking lot lighting - Light fixtures shall not exceed 28 feet in height, measured to the top of the fixture from grade.
Corrective Action Required
08/07/2023

Improvement of Parking Area - Trash enclosure areas shall be improved with a Portland cement concrete pad and a Portland cement concrete approach 30 feet in length, measured from the enclosure opening. The pad and approach shall be improved with a minimum six inches of full depth unreinforced Portland cement concrete constructed on a sub-grade of four inches of granular base course. Please label the dimension of the proposed approach.
Corrective Action Required
08/07/2023

Accessible Parking Space Size - Accessible parking spaces shall have an adjacent aisle 5 feet wide, and one in every 8 accessible spaces (but no less than one) shall be adjacent to an aisle 8 feet wide. Please label the width of the ADA aisle.
Corrective Action Required
08/07/2023

Accessible Parking Standards - All accessible parking shall comply with the requirements of the federal Americans with Disabilities Act.
Corrective Action Required
08/07/2023

Signs - All signs must comply with the sign requirements as outlined in the sign section of the UDO and will be reviewed under separate application.
Corrective Action Required
08/07/2023

Platting – The property requires platting prior to the issuance of building permits.
Building Codes Review Corrections 08/02/2023 08/03/2023
Joe Frogge
Miscellaneous Correction
Corrective Action Required
08/03/2023

Specify sanitary pipe materials.
Fire Review Approved with Conditions 08/02/2023 08/01/2023
Jim Eden
Code Statement
Corrective Action Required
08/08/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Traffic Review Corrections 08/02/2023 07/28/2023
Erin Ralovo
Corrective Action Required
07/28/2023

MoDOT approval for the turn lane on M150 will be required.
Corrective Action Required
07/28/2023

Public Improvements plans are required as noted on the Final Development Plan. Final approval will not be possible until Public Improvement Plans are approved.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 08/22/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
07/19/2023 Plans 30_ TLEMO22-164-A-051-ELEVATIONS
07/19/2023 Plans Arborwalk West E0_1 - Photometrics
07/19/2023 Plans Learning Experience Lee's Summit PERMIT 7-19-23
07/19/2023 Application Form TLE Application and Affidavit
08/08/2023 Letter Applicant Letter - FDP (DFDP)
08/22/2023 Receipt Receipt for transaction:2023-006513
08/30/2023 Engineers Estimate Arbor Walk West TLE Estimate 8-30-23
08/30/2023 Letter Arborwalk West MDNR Permit
08/30/2023 Engineer Report/Study Arborwalk West SWPPP
08/30/2023 Specifications dsx1-led
08/30/2023 Plans Learning Experience Lee's Summit PERMIT 8-29-23
08/30/2023 Plans Lumark-Crosstour-LED_xtor4b_1
08/30/2023 Plans Lumark-Crosstour-LED_xtor4b
08/30/2023 Plans MEP-Arborwalk West-E0_1
08/31/2023 Letter Responses To Applicant Letter - FDP (DFDP) (2)
09/11/2023 Letter Applicant Letter - FDP (DFDP)
09/21/2023 Plans Learning Experience Lee's Summit PERMIT 9-20-23
09/21/2023 Letter Responses to Applicant Letter - FDP (DFDP)
09/22/2023 Activity Document Fees PL2023169 The Learning Experience at Arborwalk West FDP
10/02/2023 Letter Applicant Letter - FDP (DFDP)
11/27/2023 Approved Plans Approved FDP_11272023_Learning Experience_Arborwalk West
07/31/2024 Engineer Report/Study Traffic Study Memo
08/12/2024 Engineer Report/Study Traffic Study Memo_Revised
08/12/2024 Engineer Report/Study Traffi Study Memo Exhibit
08/12/2024 Engineer Report/Study Traffic Study Memo_Revised_08122024
08/15/2024 Letter MoDOT Approval Memo_8.15.2024
08/16/2024 Engineer Report/Study Traffic Study Memo_Revised_Approved_08162024
08/16/2024 Letter MoDOT Approval Memo_Revised_08162024
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home