Planning Application Status

PL2023167




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2023167
The Summit Church - Maintenance Facility
Commercial Final Development Plan
Commercial Final Development Plan
Approved
06/23/2023
THE UNITED METHODIST CHURCH OF LEES SUMM
Locations
Contacts
THE UNITED METHODIST CHURCH OF LEES SUMM, Address:3381 NW CHIPMAN RD  
STEVE SKINNER CONSTRUCTION, Address:30112 E 155TH , Phone:(816) 225-2517  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 09/13/2023 09/11/2023
Hector Soto Jr.
Building Codes Review Approved with Conditions 09/13/2023 09/06/2023
Scott Ready
Miscellaneous Correction
Corrective Action Required
09/06/2023

Architectural plan not reviewed under this Planning number. Action required: comment is informational.
Traffic Review No Comments 09/13/2023 09/06/2023
Scott Ready
Fire Review No Comments 09/13/2023 09/06/2023
Scott Ready
Engineering Review No Comments 09/13/2023 09/06/2023
Scott Ready
Planning Review Corrections 09/06/2023 09/06/2023
Hector Soto Jr.
Corrective Action Required
09/06/2023

SITE DATA TABLE. The site data table lists the proposed building area as 1,221.85 sq. ft. The proposed building area for a 35' x 35' building is 1,225 sq. ft. Revise.
Corrective Action Required
09/06/2023

CONTOURS. Will any grading be done as part of this project? Existing contours are shown, but no proposed contours are shown to denote that any grading will be done for this project.
Corrective Action Required
09/06/2023

LIGHT FIXTURES. Will any light fixtures be mounted on the proposed building? If so, light fixtures shall have full 90-degree cut-offs so as to direct light downward and so the light source is not visible from off the property. Wall-mounted lighting shall comply with the light standards under UDO Section 8.260. If wall-mounted lighting is proposed, a photometric plan shall be provided in accordance with UDO Section 8.230.
Engineering Review No Comments 09/06/2023 09/06/2023
Sue Pyles, P.E.
Fire Review No Comments 09/06/2023 09/06/2023
Jim Eden
Traffic Review No Comments 09/06/2023 09/06/2023
Erin Ralovo
Building Codes Review Approved with Conditions 09/06/2023 08/23/2023
Joe Frogge
Miscellaneous Correction
Corrective Action Required
08/23/2023

Architectural plan not reviewed under this Planning number. Action required: comment is informational.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 08/22/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
08/22/2023 Application Form Final Development Plan Application Signed
08/22/2023 Plans A_100 - Final Development Plan
08/22/2023 Plans C_100
08/22/2023 Receipt Receipt for transaction:2023-006485
09/06/2023 Plans C_100
09/06/2023 Letter COMMENT RESPONSE 9-6-2023
09/06/2023 Letter Applicant Letter - FDP (DFDP)
09/12/2023 Letter Applicant Letter - FDP (DFDP)
09/12/2023 Plans PHASE 3 PLANS
09/18/2023 Approved Plans Approved FDP_The Summit Church Maintenance Facility_09122023
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: