Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
No Comments
|
11/06/2023
|
11/03/2023
|
|
Sue Pyles, P.E.
|
|
|
Planning Review
|
No Comments
|
11/02/2023
|
11/01/2023
|
|
Shannon McGuire
|
|
|
GIS Review
|
No Comments
|
11/02/2023
|
10/26/2023
|
|
Scott Ready
|
|
|
Planning Review
|
Corrections
|
10/23/2023
|
10/25/2023
|
|
Shannon McGuire
|
|
Corrective Action Required
Please update Josh Johnson title to reflect the correct title, Director of Development Services.
|
|
|
Engineering Review
|
Corrections
|
10/23/2023
|
10/23/2023
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Please reference the Arborwalk West Public Street and Storm plans for the location of storm sewer Structure A-4, which is the upstream end of the public storm sewer system. A 25’ utility easement will be required for this public system. Please locate in accordance with the proposed layout.
|
|
Corrective Action Required
Include dedication language for the private sanitary sewer easement.
|
|
Corrective Action Required
Is the 30’ utility easement across the south end of Lots 1 & 2 for the proposed sanitary sewer extension? If so, this location can’t be reviewed until those public plans have been submitted for review.
|
|
|
GIS Review
|
No Comments
|
10/23/2023
|
10/17/2023
|
|
Kathy Kraemer
|
|
|
Planning Review
|
Corrections
|
09/29/2023
|
10/02/2023
|
|
Shannon McGuire
|
|
Corrective Action Required
Please provide a completed application form with signature.
|
|
Corrective Action Required
Please provide a completed ownership Affidavit form with signature.
|
|
Corrective Action Required
This is a Minor Plat, please remove “Final Plat” from the title and replace it with “Minor Plat.”
|
|
Corrective Action Required
Upon resubmittal do not resubmit the Preliminary Plat sheet.
|
|
Corrective Action Required
Please provide more detail in the Location Map, i.e. major cross streets.
|
|
Corrective Action Required
The proposed name of the subdivision shall include the lot #’s. “Arborwalk West Addition, Lots 1-3”.
|
|
Corrective Action Required
Is “Block ‘A’ establishing a common area tract? If so it needs to be labeled as a Tract rather than a Block.
|
|
Corrective Action Required
It is hard to read the proposed lot lines. Please increase the weight of the proposed lot lines.
|
|
Corrective Action Required
Please label Lot 2 with its street number 1660 SW M 150 Hwy.
|
|
Corrective Action Required
Sidewalks are required along the eastern property boundary. Please show the required sidewalk.
|
|
Corrective Action Required
The easement dedication paragraph is insufficient. All Utilities Easements must be dedicated to someone and defined as to their use. Utility easement dedication should read as follows: “An easement is hereby granted to the City of Lee’s Summit, Missouri, to locate, construct and maintain or to authorize the location, construction and maintenance of poles, wires, anchors, conduits and/or structures for water, gas, sanitary sewer, storm sewer, surface drainage channel, electricity, telephone, cable television, or any other necessary public utility or services, any or all of them upon, over or under those areas outlined or designated upon this plat as “Utility Easement” (U.E.) or within any street or thoroughfare dedicated to public use on this plat. The grantor, on behalf of himself, his heirs, his assigns and successors in interest, hereby waives, to the fullest extent allowed by law including, without limitation, section 527.188 RSMO. (2006) any right to request restoration of rights previously transferred and vacation of the easements herein granted.
|
|
Corrective Action Required
You have labeled various access easements but have not provided a dedication for them. All easements must be defined as to who it is dedicated to and the uses allowed. Typical access easement language is as follows “An easement to provide for access to and from lots 1, 2 & 3 is hereby established as shown on the plat and designated as Access Easement (A.E.). Said easement is for the mutual benefit of the present and future owners, their mortgagees, tenants, business invitees and any emergency vehicles, equipment and personnel.”
|
|
Corrective Action Required
You must dedicate and define the Storm Sewer Easement and the Sanitary Sewer Easement.
|
|
Corrective Action Required
The City certification should read as follows "This is to certify that the Minor Plat of “Plat Name” was submitted to and duly approved by the City of Lee’s Summit Missouri, pursuant to Chapter 33, the Unified Development Ordinance of the City of Lee’s Summit Code of Ordinances."
|
|
|
Engineering Review
|
Corrections
|
09/29/2023
|
09/22/2023
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
The storm sewer easement along the east property line don't match submitted storm sewer alignment. Please revise accordingly.
|
|
Corrective Action Required
The sanitary sewer along the west property line is supposed to be in a private easement. Please revise accordingly.
|
|
|
GIS Review
|
Corrections
|
09/29/2023
|
09/20/2023
|
|
Kathy Kraemer
|
|
Corrective Action Required
The dwg and the legal should match. Between coordinates 4 and 5, the length is listed as 18.91 for both chord and arc on the dwg, but the legal calls out 18.89 for both
|
|
Corrective Action Required
The bearing on the dwg does not match the legal. Between coord 5 and 6, legal calls out S24-25-57E, but dwg is S24-24-57E.
|
|
Corrective Action Required
Legal and dwg don't match: just before coord 10, dwg lists 82.39 length, legal says 82.42
|
|
Corrective Action Required
Just after coord 10, the distance on dwg is 43.74 but legal calls out 43.71
|
|
|