Summary
PL2022377
Tailor Made Landing, Lots 1-2 & Tract A
Final Plat
Final Plat
Recorded
10/21/2022
TAILOR MADE EXTERIORS LLC
Fieldhouse Facility
Locations
Contacts
TAILOR MADE EXTERIORS LLC, Address:4521 NE SUN CT STE A  
MATT SCHLICHT, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Rick Mullin - Tailor Made Exteriors, Phone:(816) 918-5640  
TAILOR MADE INDUSTRIES LLC, Address:1600 SE HAMBLEN RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 11/21/2023 11/16/2023
Shannon McGuire
GIS Review No Comments 11/21/2023 11/14/2023
Scott Ready
Traffic Review No Comments 11/21/2023 11/14/2023
Scott Ready
Fire Review No Comments 11/21/2023 11/14/2023
Scott Ready
Engineering Review Approved with Conditions 11/21/2023 11/14/2023
Scott Ready
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
11/14/2023

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
11/14/2023

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
11/14/2023

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #06 Land Disturbance
Corrective Action Required
11/14/2023

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
11/14/2023

All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
DE C&O #14 Common Area Sidewalks
Corrective Action Required
11/14/2023

All sidewalks adjacent to a common area tract, unplatted land or any land where no structure is intended to be built, and is required, shall be constructed by the developer at the time the street is constructed.
Planning Review Corrections 11/02/2023 11/02/2023
Shannon McGuire
Corrective Action Required
11/02/2023

The below comments where noted on the applicants Letters dated November 8, 2022 & October 2, 2023 and have not been addressed. Comment #1 - Please provide a signed application and signed/notarized ownership affidavit. Comment #7 - On all streets (major and minor arterials, industrial and commercial collectors, and residential collectors), sidewalks shall be required on both sides of the street. This includes along SE Hamblen and the required new street serving this subdivision. Comment # 8 - As a common area tract is being proposed, please provided a copy of the property owners association bylaws as evidence of the establishment of the agency for the ownership and maintenance of the common open space and all assurances of the financial and administrative ability of such agency.
Corrective Action Required
11/02/2023

Please label each lot/tract with its street number • Lot 1 – 1600 SE Hamblen Rd • Lot 2 – 1550 SE Hamblen Rd • Tract A – 1510 SE Hamblen Rd
Engineering Review Approved with Conditions 11/02/2023 10/27/2023
Gene Williams, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
10/27/2023

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
10/27/2023

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
10/27/2023

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #06 Land Disturbance
Corrective Action Required
10/27/2023

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
10/27/2023

All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
DE C&O #14 Common Area Sidewalks
Corrective Action Required
10/27/2023

All sidewalks adjacent to a common area tract, unplatted land or any land where no structure is intended to be built, and is required, shall be constructed by the developer at the time the street is constructed.
GIS Review No Comments 11/02/2023 10/26/2023
Scott Ready
Traffic Review No Comments 11/02/2023 10/26/2023
Scott Ready
Fire Review No Comments 11/02/2023 10/26/2023
Scott Ready
Traffic Review No Comments 09/28/2023 10/02/2023
Erin Ralovo
Planning Review Corrections 09/28/2023 10/02/2023
Shannon McGuire
Corrective Action Required
10/02/2023

The below comment where noted on the applicants Letter dated November 8, 2022 and have not been addressed. Comment #1 - Please provide a signed application and signed/notarized ownership affidavit. Comment #7 - On all streets (major and minor arterials, industrial and commercial collectors, and residential collectors), sidewalks shall be required on both sides of the street. This includes along SE Hamblen and the required new street serving this subdivision. Comment # 8 - As a common area tract is being proposed, please provided a copy of the property owners association bylaws as evidence of the establishment of the agency for the ownership and maintenance of the common open space and all assurances of the financial and administrative ability of such agency.
Corrective Action Required
10/02/2023

Please update the Development Services Department signature block to reflect the current City official, Joshua Johnson, AICP.
Corrective Action Required
10/02/2023

You have labeled a 75’ access easement but have not provided a dedication for it. All easements must be defined as to who it is dedicated to and the uses allowed. Typical access easement language is as follows “An easement to provide for access to and from lots 1 & 2 is hereby established as shown on the plat and designated as Access Easement (A.E.). Said easement is for the mutual benefit of the present and future owners, their mortgagees, tenants, business invitees and any emergency vehicles, equipment and personnel.”
Engineering Review Corrections 09/28/2023 09/28/2023
Gene Williams, P.E.
Corrective Action Required
09/28/2023

Please evaluate the 100 year clogged/zero available storage water surface elevation within the detention basin, and show the outline in graphic format on the plat for the review copy. A minimum 20 foot setback is required from this water surface elevation and any property line. Please ensure this distance is met, and remove the outline of the water surface elevation on the final mylars.
Corrective Action Required
09/28/2023

Please add the following notation concerning the detention basin and maintenance of the detention basin within the common area tract to be maintained by the property owner's association: "All storm water conveyance, retention, or detention facilities to be located on common property shall be owned and maintained by the {property owners’ association, homeowners’ association - please be specific as to which one} in accordance with the standards set forth in the covenants, conditions, and restrictions. These stormwater detention facilities shall be inspected by the {property owners’ association, homeowners association, or owner, as appropriate} on the frequency specified in the current City of Lee’s Summit Design and Construction Manual, to assure that all inlet and outlet structures are fully-functional, the detention basin has full storage capacity and all landscaping, vegetation and structural improvements are being maintained in accordance with the current City of Lee’s Summit Property Maintenance Code."
Corrective Action Required
09/28/2023

The outlet structure appears to be contained within a 15 foot by 48 foot general utility easement. Please remove this easement, as this is private infrastructure not maintained by the City.
Corrective Action Required
09/28/2023

"Access Easment" is not defined anywhere on the plat. It would appear, therefore, that no access easement exists on the proposed plat. Please provide specific dedication language and matching notation which defines the access easement and who it is granted to and by. Please revise as appropriate.
GIS Review No Comments 09/28/2023 09/25/2023
Kathy Kraemer
Fire Review No Comments 09/28/2023 09/21/2023
Scott Ready
Traffic Review Corrections 11/04/2022 11/04/2022
Brad Cooley, P.E., RSPI
Corrective Action Required
11/04/2022

This property is subject to the Unimproved Road Policy. "No industrial developments will be permitted on unimproved roads". This requirement was deferred with the original PDP (File # 2017-1515) with the requirement that any additional development at this location would require improvements to Hamblen Road. The URP would require Hamblen be built to an urban standard from the subject property to Bailey Road.
Planning Review Corrections 11/04/2022 11/03/2022
Shannon McGuire
Corrective Action Required
11/03/2022

Please provide a signed application and signed/notarized ownership affidavit.
Corrective Action Required
11/03/2022

Please label the total acreage of the proposed subdivision.
Corrective Action Required
11/03/2022

Please a note to the plat establishing ownership and maintenance responsibility for all common area tracts, private easements, or other non-public areas.
Corrective Action Required
11/03/2022

Please update Ryan Elam’s signature block to reflect his current title, Assistant City Manager.
Corrective Action Required
11/03/2022

The approved PDP -#PL2017-166 (acting as the preliminary plat) showed a street with cul-de-sac serving the lot of this subdivision. Please show the street as was approved by the PDP. For all streets dedicated and accepted in any subdivision, the minimum standards for right-of-way width, pavement width, street grades, and street alignment shall be as set out in the “Design and Construction Manual”.
Corrective Action Required
11/03/2022

Access to individual lots shall not be allowed from an arterial or collector street when access from a local or access street is available. Please add a limited access note to the plat reflecting no direct vehicular access to SE Hamblen Rd.
Corrective Action Required
11/03/2022

On all streets (major and minor arterials, industrial and commercial collectors, and residential collectors), sidewalks shall be required on both sides of the street. This includes along SE Hamblen and the required new street serving this subdivision.
Corrective Action Required
11/03/2022

As a common area tract is being proposed, please provided a copy of the property owners association bylaws as evidence of the establishment of the agency for the ownership and maintenance of the common open space and all assurances of the financial and administrative ability of such agency.
Fire Review No Comments 11/04/2022 10/31/2022
Jim Eden
Engineering Review Corrections 11/04/2022 10/25/2022
Gene Williams, P.E.
Corrective Action Required
10/25/2022

Please evaluate the 100 year clogged/zero available storage water surface elevation within the detention basin, and show the outline in graphic format on the plat for the review copy. A minimum 20 foot setback is required from this water surface elevation and any property line. Please ensure this distance is met, and remove the outline of the water surface elevation on the final mylars.
Corrective Action Required
10/25/2022

How will Lot 2 be served with sanitary sewer service? From our notes, the installation of the sanitary sewer at Hamblen Rd. during construction of the Tailor-Made facility many years ago was problematic, and it would appear an extension is required to provide adequate sanitary sewer service to Lot 2. Please evaluate, and provide sanitary sewer plans if necessary.
Corrective Action Required
10/25/2022

The manner in which the plat is drawn would seem to indicate you are proposing a 30 foot general utility easement along the street frontage. This is due to the lack of a physical end to the easement shown on the north and south sides of the lots. In other words, it would appear the building line along the street frontage is also a utility easement. Please evaluate and revise as appropriate.
Corrective Action Required
10/25/2022

In terms of the easement issue discussed above, please show the location of the outlet structure for the detention basin in relation to the easement. If encroaching within the easement, the outlet structure and/or the detention basin may need modification to remove the encroachment. Please evaluate, and revise as appropriate.
Corrective Action Required
10/25/2022

A minimum 10 foot general utility easement is required along the street frontage of Hamblen Rd. Please revise.
Corrective Action Required
10/25/2022

Please revise the drainage note, as there will not be a Master Drainage Plan associated with this plat.
Corrective Action Required
10/25/2022

Please add the following notation concerning the detention basin and maintenance of the detention basin within the common area tract to be maintained by the property owner's association: "All storm water conveyance, retention, or detention facilities to be located on common property shall be owned and maintained by the {property owners’ association, homeowners’ association - please be specific as to which one} in accordance with the standards set forth in the covenants, conditions, and restrictions. These stormwater detention facilities shall be inspected by the {property owners’ association, homeowners association, or owner, as appropriate} on the frequency specified in the current City of Lee’s Summit Design and Construction Manual, to assure that all inlet and outlet structures are fully-functional, the detention basin has full storage capacity and all landscaping, vegetation and structural improvements are being maintained in accordance with the current City of Lee’s Summit Property Maintenance Code."
Corrective Action Required
10/25/2022

According to my notes, a public road with a cul-de-sac was to be dedicated and constructed for this development. Please review and revise as appropriate, and ensure easements are dedicated along all street frontages in accordance with City standards, including the 15 foot utility easement at cul-de-sac bulbs.
Corrective Action Required
10/25/2022

Please show the location of sidewalk and ADA-accessible ramps along all roads. Please revise as appropriate.
Corrective Action Required
10/25/2022

It may be necessary to relocate the existing private sanitary sewer service if it is located within the limits of the requested easements described above. Please show the line in relation to the requested easements along the public road.
Corrective Action Required
10/25/2022

Are you requesting the private water main to be dedicated as public? According to my notes, this was the plan from many years ago when the private water main was installed. If so, a backflow preventer should be shown near the private water main and near the existing building, and a gate valve to denote the end of the public service. Separate engineering plans shall be required for any work to the public water main.
GIS Review No Comments 11/04/2022 10/24/2022
Kathy Kraemer
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Plat fee $856.00 $856.00 Paid 11/03/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 12/14/2023 5:00 PM Council Chambers 12/14/2023 05:00 PM
Agenda Item
Continued
12/14/2023
Planning Commission Meeting 01/11/2024 5:00 PM Council Chambers 01/11/2024 05:00 PM
Agenda Item
Approved
01/11/2024
City Council Ordinance 2nd Reading 01/16/2024 6:00 PM Council Chambers 01/16/2024 06:00 PM
Agenda Item
Approved
City Council Ordinance 2nd Reading 01/23/2024 6:00 PM Council Chambers 01/23/2024 06:00 PM
Agenda Item
Approved
Documents & Images
Date Uploaded File Type Document Name
10/21/2022 Application Form FINAL PLAT APPLICATION
10/21/2022 Plans TAILOR MADE FINAL PLAT-FINAL PLAT
11/03/2022 Receipt Receipt for transaction:2022-008691
11/08/2022 Letter Applicant Letter - FP (DRCF)
05/31/2023 Letter Tailormade Landing TIS
09/21/2023 Plans FINAL PLAT
10/02/2023 Letter Applicant Letter - FP (DRCF)
10/25/2023 Plans TAILORMADE FINAL PLAT
11/02/2023 Letter Applicant Letter - FP (DRCF)
11/14/2023 Plans FINAL PLAT 231114
11/14/2023 Application Form SIGNED APPLICATION FINAL PLAT
11/14/2023 Letter Tailor Made Landings - HOA CC&R
11/20/2023 Letter Applicant Letter -FP
01/26/2024 Letter Final Plat Signature Routing
02/06/2024 Activity Document Tailormade Landing_Plat Routing Sheet_Completed
02/06/2024 Recorded Document Final Plat Tailor Made Landing Lots 1-2 & Tract A
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home