Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
No Comments
|
11/18/2022
|
11/17/2022
|
|
Hector Soto Jr.
|
|
|
Engineering Review
|
Approved with Conditions
|
11/18/2022
|
11/17/2022
|
|
Gene Williams, P.E.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs shall be resubmitted to include erosion and sediment control devices and measures, final restoration, and sodding, seeding, fertilizer, topsoil and mulch. Fees to be determined based on the estimate.
|
|
Corrective Action Required
The waiver to the stormwater detention requirements is currently under review by the City Engineer. Final approval is contingent upon this waiver being approved by the City Engineer.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / discussion with the assigned Field Engineering Inspector.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Fire Review
|
Approved with Conditions
|
11/18/2022
|
11/16/2022
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
The International Existing Building Code is NOT adopted by the City of Lee's Summit
|
|
Miscellaneous Correction
903.2.3 Group E. An automatic sprinkler system shall be
provided for Group E occupancies as follows:
1. Throughout all Group E fire areas greater than
12,000 square feet (1115 m2) in area.
2. The Group E fire area is located on a floor other than
a level of exit discharge serving such occupancies.
Exception: In buildings where every classroom
has not fewer than one exterior exit door at
ground level, an automatic sprinkler system is not
required in any area below the lowest level of exit
discharge serving that area.
3. The Group E fire area has an occupant load of 300
or more.
The addition takes the building over the 12,000 square foot threshold for a sprinkler system, unless other approved building provisions are implemented.
|
|
Fire Lanes
IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm).
The existing (non-conforming) fire lane between the buildings shall be maintained.
|
|
|
Building Codes Review
|
No Comments
|
11/18/2022
|
11/14/2022
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
Sanitary connection at manhole not allowed.
11/14/22 - Deferred to Engineering approval
|
|
|
Traffic Review
|
No Comments
|
11/18/2022
|
11/11/2022
|
|
Scott Ready
|
|
|
Engineering Review
|
Corrections
|
11/04/2022
|
11/04/2022
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
An erosion and sediment control plan appeared to be missing. Please submit an erosion and sediment control plan for this project. Since the disturbed area is less than 1 acre, a SWPPP shall not be required.
|
|
Corrective Action Required
The waiver for stormwater is being reviewed. It is our recommendation the waiver should be approved. However, please include the project number PL2022372 on the form, and please limit the exhibits to one (1) (i.e., grading plan?). Recommend highlighting the new building additions in yellow on the single exhibit. We would also suggest a quick analysis of the increase in stormwater peak discharge for the newly-created impervious area by use of a table showing the pre versus post-development peak flows due to the building addtions. A quick calculation shows about 0.3 cfs increase in stormwater peak flows for the 100 year event, and it would be beneficial to show this in the form of a table. Please review and revise as appropriate.
|
|
Corrective Action Required
It appears the public sanitary sewer is being relocated. Separate public sanitary sewer plans shall be required. Doghouse manholes are not allowed in the City of Lee's Summit. Please submit a separate sanitary sewer relocation plan, and eliminate all doghouse manholes. Ensure a minimum of 15 feet clearance from the building and the outside of the sanitary sewer line is maintained by the realignment.
|
|
|
Fire Review
|
Corrections
|
11/04/2022
|
11/01/2022
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
The International Existing Building Code is NOT adopted by the City of Lee's Summit
|
|
Miscellaneous Correction
Corrective Action Required
903.2.3 Group E. An automatic sprinkler system shall be
provided for Group E occupancies as follows:
1. Throughout all Group E fire areas greater than
12,000 square feet (1115 m2) in area.
2. The Group E fire area is located on a floor other than
a level of exit discharge serving such occupancies.
Exception: In buildings where every classroom
has not fewer than one exterior exit door at
ground level, an automatic sprinkler system is not
required in any area below the lowest level of exit
discharge serving that area.
3. The Group E fire area has an occupant load of 300
or more.
The addition takes the building over the 12,000 square foot threshold for a sprinkler system, unless other approved building provisions are implemented.
|
|
Fire Lanes
Corrective Action Required
IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm).
The existing (non-conforming) fire lane between the buildings shall be maintained.
|
|
|
Traffic Review
|
No Comments
|
11/04/2022
|
11/01/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
Planning Review
|
Corrections
|
11/04/2022
|
11/01/2022
|
|
Hector Soto Jr.
|
|
Corrective Action Required
GROUND-MOUNTED UNITS. Is any new HVAC equipment proposed for the addition, or will the existing equipment serve the addition? Show the location of any new ground-mounted equipment.
|
|
Corrective Action Required
EXTERIOR MATERIALS. Label the proposed exterior building materials and colors.
|
|
|
Building Codes Review
|
Corrections
|
11/04/2022
|
10/26/2022
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
Sanitary connection at manhole not allowed.
|
|
|