PL2022334
CRACK SHACK AND VIA313 SHELL DEVELOMENT - STREETS OF WEST PRYOR LOT 12
Commercial Final Development Plan
Commercial Final Development Plan
Withdrawn
09/12/2022
CITY OF LEES SUMMIT
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
STREETS OF WEST PRYOR LLC, Address:7200 W 132ND ST STE 150  
SM ENGINEERING, Address:919 W STEWART RD, Phone:(785) 341-9747  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Codes Review No Comments 01/18/2023 01/11/2023
Joe Frogge
Miscellaneous Correction
Resolved
01/11/2023

Provide complete site lighting design including light pole bases. 10/19/22 - Minimum frost protection depth is 36". Modify detail. (fyi - we enforce this an any/all structures that exceed 6' in height, poles included)
Traffic Review No Comments 01/19/2023 01/11/2023
Dawn Bell
Fire Review Approved with Conditions 01/19/2023 01/11/2023
Dawn Bell
Engineering Review Approved with Conditions 01/19/2023 01/11/2023
Dawn Bell
DE Contact Field Eng. Inspector
Corrective Action Required
01/11/2023

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
01/11/2023

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), water tap and meter setup fee, and sanitary sewer development fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $61,338.45
DE Future Repair Work
Corrective Action Required
01/11/2023

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Planning Review No Comments 01/19/2023 01/11/2023
Dawn Bell
Planning Review No Comments 10/21/2022 10/24/2022
Hector Soto Jr.
Engineering Review Approved with Conditions 10/21/2022 10/21/2022
Sue Pyles, P.E.
DE Contact Field Eng. Inspector
Corrective Action Required
10/21/2022

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
10/21/2022

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), water tap and meter setup fee, and sanitary sewer development fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $61,338.45
DE Future Repair Work
Corrective Action Required
10/21/2022

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Traffic Review No Comments 10/19/2022 10/20/2022
Brad Cooley, P.E., RSPI
Building Codes Review Corrections 10/21/2022 10/19/2022
Joe Frogge
Miscellaneous Correction
Resolved
10/19/2022

Water piping is required to be copper from the main to a distance of 10' past meter. Re: Utility Note #9 on sheet C4.0.
Miscellaneous Correction
Resolved
10/19/2022

Sanitary lines are mislabled. Re: Utility plan on sheet C4.0.
Miscellaneous Correction
Corrective Action Required
10/19/2022

Provide complete site lighting design including light pole bases. 10/19/22 - Minimum frost protection depth is 36". Modify detail. (fyi - we enforce this an any/all structures that exceed 6' in height, poles included)
Fire Review Approved with Conditions 10/21/2022 10/18/2022
Jim Eden
Planning Review Corrections 10/07/2022 10/10/2022
Hector Soto Jr.
Corrective Action Required
10/10/2022

MECHANICAL EQUIPMENT. It appears that the building will have roof-top units. Dash in the RTUs on the elevations to the extent possible. To comply with City ordinance, the RTUs shall be fully screened from view on all sides up the height of the units using parapet walls. Take into account any additional height from any curbs on which the RTUs will be set when determining the final parapet wall height. If ground-mounted units will be used instead, the ground units shall be fully screened from view using evergreen landscaping at least equal to the height of the units being screened. Show the location of the ground units on the site plan and landscaping plan.
Corrective Action Required
10/10/2022

LIGHTING. Provide a photometric plan in accordance with UDO Section 8.230. All proposed lighting shall comply with the standards under UDO Sections 8.220, 8.250, 8.260 and 8.270.
Corrective Action Required
10/10/2022

LOT INFORMATION. Label the lot line dimensions and bearings for Lot 12.
Corrective Action Required
10/10/2022

TRASH ENCLOSURE. Provide a detail for the proposed trash enclosure. The enclosure shall comply with the standards under UDO Section 8.180.G.
Corrective Action Required
10/10/2022

SITE DATA TABLE. Add a line item in the table listing the minimum number of required parking spaces (98).
Building Codes Review Corrections 10/07/2022 10/07/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
10/07/2022

Water piping is required to be copper from the main to a distance of 10' past meter. Re: Utility Note #9 on sheet C4.0.
Miscellaneous Correction
Corrective Action Required
10/07/2022

Sanitary lines are mislabled. Re: Utility plan on sheet C4.0.
Miscellaneous Correction
Corrective Action Required
10/07/2022

Provide complete site lighting design including light pole bases.
Engineering Review Corrections 10/07/2022 10/07/2022
Sue Pyles, P.E.
Corrective Action Required
10/07/2022

Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
10/07/2022

Sheet C1.0: The floodplain information is incorrect. Please revise.
Corrective Action Required
10/07/2022

Sheet C4.0: • Revise Utility Note 9 to require 10’ copper beyond the water meter. • The sanitary sewer service lines are mislabeled. Please revise. • Please label the grease interceptors and include the detail number.
Corrective Action Required
10/07/2022

Sheet C5.0: Include the FH in the Profile view label at Sta. 4+51.48.
Traffic Review No Comments 10/07/2022 10/07/2022
Brad Cooley, P.E., RSPI
Fire Review Approved with Conditions 10/07/2022 10/07/2022
Jim Eden
Code Statement
Corrective Action Required
10/07/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 09/13/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
09/13/2022 Receipt Receipt for transaction:2022-007475
09/24/2022 Application Form Lot 12 FDP Application 9_13_22
09/24/2022 Application Form Lot 12 FDP Ownership Affidavit
09/24/2022 Plans RETAIL SHELL - TCS & Via Elevations
09/24/2022 Plans Streets of W Pryor Lot 12 PERMIT 9-23-22 (1)
10/10/2022 Letter Applicant Letter - FDP (DFDP)
10/14/2022 Plans A200 - EXTERIOR ELEVATIONS
10/14/2022 Plans A201 - EXTERIOR ELEVATIONS
10/14/2022 Letter Applicant Letter - FDP (DFDP) Responses
10/14/2022 Engineers Estimate Lot 12 Cost Estimate 10-12-22
10/14/2022 Plans MEP-West Pryor Lot 12-ME1
10/14/2022 Plans Streets of W Pryor Lot 12 PERMIT 10-12-22
10/21/2022 Activity Document Fees PL2022334 Lot 12 Streets of West Pryor FDP
10/24/2022 Letter Applicant Letter - FDP (DFDP)
01/10/2023 Plans MEP-West Pryor Lot 12-ME1
01/10/2023 Letter FDP (DFDP)0 Responses
01/18/2023 Letter Applicant Letter - FDP (DFDP)
03/27/2023 Approved Plans Approved 1.18.23 SWP Lot 12 FDP
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home