Review Type |
Outcome |
Est. Completion Date |
Completed |
Building Codes Review
|
No Comments
|
01/18/2023
|
01/11/2023
|
|
Joe Frogge
|
|
Miscellaneous Correction
Provide complete site lighting design including light pole bases.
10/19/22 - Minimum frost protection depth is 36". Modify detail. (fyi - we enforce this an any/all structures that exceed 6' in height, poles included)
|
|
|
Traffic Review
|
No Comments
|
01/19/2023
|
01/11/2023
|
|
Dawn Bell
|
|
|
Fire Review
|
Approved with Conditions
|
01/19/2023
|
01/11/2023
|
|
Dawn Bell
|
|
|
Engineering Review
|
Approved with Conditions
|
01/19/2023
|
01/11/2023
|
|
Dawn Bell
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), water tap and meter setup fee, and sanitary sewer development fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $61,338.45
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Planning Review
|
No Comments
|
01/19/2023
|
01/11/2023
|
|
Dawn Bell
|
|
|
Planning Review
|
No Comments
|
10/21/2022
|
10/24/2022
|
|
Hector Soto Jr.
|
|
|
Engineering Review
|
Approved with Conditions
|
10/21/2022
|
10/21/2022
|
|
Sue Pyles, P.E.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), water tap and meter setup fee, and sanitary sewer development fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $61,338.45
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Traffic Review
|
No Comments
|
10/19/2022
|
10/20/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
Building Codes Review
|
Corrections
|
10/21/2022
|
10/19/2022
|
|
Joe Frogge
|
|
Miscellaneous Correction
Water piping is required to be copper from the main to a distance of 10' past meter. Re: Utility Note #9 on sheet C4.0.
|
|
Miscellaneous Correction
Sanitary lines are mislabled. Re: Utility plan on sheet C4.0.
|
|
Miscellaneous Correction
Corrective Action Required
Provide complete site lighting design including light pole bases.
10/19/22 - Minimum frost protection depth is 36". Modify detail. (fyi - we enforce this an any/all structures that exceed 6' in height, poles included)
|
|
|
Fire Review
|
Approved with Conditions
|
10/21/2022
|
10/18/2022
|
|
Jim Eden
|
|
|
Planning Review
|
Corrections
|
10/07/2022
|
10/10/2022
|
|
Hector Soto Jr.
|
|
Corrective Action Required
MECHANICAL EQUIPMENT. It appears that the building will have roof-top units. Dash in the RTUs on the elevations to the extent possible. To comply with City ordinance, the RTUs shall be fully screened from view on all sides up the height of the units using parapet walls. Take into account any additional height from any curbs on which the RTUs will be set when determining the final parapet wall height. If ground-mounted units will be used instead, the ground units shall be fully screened from view using evergreen landscaping at least equal to the height of the units being screened. Show the location of the ground units on the site plan and landscaping plan.
|
|
Corrective Action Required
LIGHTING. Provide a photometric plan in accordance with UDO Section 8.230. All proposed lighting shall comply with the standards under UDO Sections 8.220, 8.250, 8.260 and 8.270.
|
|
Corrective Action Required
LOT INFORMATION. Label the lot line dimensions and bearings for Lot 12.
|
|
Corrective Action Required
TRASH ENCLOSURE. Provide a detail for the proposed trash enclosure. The enclosure shall comply with the standards under UDO Section 8.180.G.
|
|
Corrective Action Required
SITE DATA TABLE. Add a line item in the table listing the minimum number of required parking spaces (98).
|
|
|
Building Codes Review
|
Corrections
|
10/07/2022
|
10/07/2022
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
Water piping is required to be copper from the main to a distance of 10' past meter. Re: Utility Note #9 on sheet C4.0.
|
|
Miscellaneous Correction
Corrective Action Required
Sanitary lines are mislabled. Re: Utility plan on sheet C4.0.
|
|
Miscellaneous Correction
Corrective Action Required
Provide complete site lighting design including light pole bases.
|
|
|
Engineering Review
|
Corrections
|
10/07/2022
|
10/07/2022
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Submit an Engineer's Estimate of Probable Construction Costs.
|
|
Corrective Action Required
Sheet C1.0: The floodplain information is incorrect. Please revise.
|
|
Corrective Action Required
Sheet C4.0:
• Revise Utility Note 9 to require 10’ copper beyond the water meter.
• The sanitary sewer service lines are mislabeled. Please revise.
• Please label the grease interceptors and include the detail number.
|
|
Corrective Action Required
Sheet C5.0: Include the FH in the Profile view label at Sta. 4+51.48.
|
|
|
Traffic Review
|
No Comments
|
10/07/2022
|
10/07/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
Fire Review
|
Approved with Conditions
|
10/07/2022
|
10/07/2022
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|