Planning Application Status

PL2022085




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022085
Tower Park, Lots 7A-1 thru 7A-3 and 7B-1
Final Plat
Final Plat
Recorded
03/08/2022
NLVC LLC
Locations
Contacts
NLVC LLC, Address:3152 SW GRANDSTAND, Phone:(816) 589-4415  
RUSSELL PEARSON, Address:3152 GRANDSTAND CIR, Phone:(913) 735-9861  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
Scott Ready, Phone: 8169691225  
Reviews
Review Type Outcome Est. Completion Date Completed
GIS Review No Comments 07/01/2022 07/07/2022
Kathy Kraemer
Fire Review No Comments 07/01/2022 06/29/2022
Jim Eden
Planning Review Corrections 07/01/2022 06/29/2022
Victoria Nelson
Corrective Action Required
06/29/2022

Easement language. There is no longer a public easement please change it so that it reflects the private easement with accompanying language identifying and defining the purpose and grantee, for AT&T.
Engineering Review Approved with Conditions 07/01/2022 06/28/2022
Sue Pyles, P.E.
DE Future Repair Work
Corrective Action Required
06/24/2022

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Traffic Review No Comments 07/01/2022 06/28/2022
Brad Cooley, P.E., RSPI
GIS Review No Comments 04/15/2022 04/18/2022
Kathy Kraemer
Resolved
04/18/2022

I am working with Jackson Co to establish ownership. Right now it is Dave's Roe. As such, another owner cannot be on this plat, since ownership has to match exactly. If ownership is split by deed before the recording of this plat, then this correction would be void. Please provide the recorded document number for such deed.
Resolved
04/18/2022

The vacation of ROW along Longview Blvd must already be recorded and the document number referenced on the plat.
Engineering Review Approved with Conditions 04/15/2022 04/15/2022
Sue Pyles, P.E.
DE Future Repair Work
Corrective Action Required
04/15/2022

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review No Comments 04/15/2022 04/12/2022
Jim Eden
Traffic Review No Comments 04/15/2022 04/11/2022
Brad Cooley, P.E., RSPI
Planning Review No Comments 04/15/2022 04/11/2022
Victoria Nelson
Miscellaneous Correction
Resolved
04/18/2022

Lot numbers. Following the City’s naming convention for replatted property to use the existing lot number as the base for the new lot number, Lot 7B shall be renamed 7B-1. Lots 7C-7E shall be renamed 7A-1, 7A-2 and 7A-3. Please update all references to lots numbers throughout the document as needed to reflect the revised lot numbers.
Miscellaneous Correction
Resolved
04/18/2022

Plat title. Please revise the plat title to read, “Tower Park, Lots 7A-1 thru 7A-3 and 7B-1”.
Miscellaneous Correction
Resolved
04/18/2022

Sidewalk easement. Please make a sidewalk easement comment to cover the existing 10' sidewalk. Sidewalk Easement Note: A permanent easement is hereby granted to the City of Lee’s Summit to locate, construct and maintain or to authorize the location, construction and maintenance of a sidewalk for pedestrian access over, along and across the strips of land designated as “Sidewalk Easement” or by abbreviation “S/E” on the accompanying plat.
Miscellaneous Correction
Resolved
04/18/2022

Developer Information. Please show the Applicant, Box Real Estate Development, name and address.
Miscellaneous Correction
Resolved
04/18/2022

Locations and features. For the review period, please show the existing building located at 450 SW Longview Blvd like you did for 420, 340, and 440. Please show the entire rear dive aisle.
Miscellaneous Correction
Resolved
04/18/2022

Street name. Please show the “SW” prefix for the SW Tower Park Drive street label.
Miscellaneous Correction
Resolved
04/18/2022

Building setback. Please make a comment stating there is a 0' setback line.
GIS Review Corrections 03/29/2022 03/29/2022
Kathy Kraemer
Corrective Action Required
03/21/2022

Please title/dedicate the plat using the plat name first, rather than "Lots" as this helps with indexing at Jackson County. Example: TOWER PARK COMMERCIAL PHASE 2 LOTS 7B THRU 7E
Corrective Action Required
03/21/2022

Ownership at the county is listed as Daves Roe Bodyshop, not Box. Also, the extra 40 feet into Longview Blvd is LS ROW. If this has been vacated, please provide the recorded document number.
Planning Review Corrections 03/29/2022 03/29/2022
Victoria Nelson
Miscellaneous Correction
Corrective Action Required
03/23/2022

Lot numbers. Following the City’s naming convention for replatted property to use the existing lot number as the base for the new lot number, Lot 7B shall be renamed 7B-1. Lots 7C-7E shall be renamed 7A-1, 7A-2 and 7A-3. Please update all references to lots numbers throughout the document as needed to reflect the revised lot numbers.
Miscellaneous Correction
Corrective Action Required
03/23/2022

Plat title. Please revise the plat title to read, “Tower Park, Lots 7A-1 thru 7A-3 and 7B-1”.
Miscellaneous Correction
Corrective Action Required
03/23/2022

Sidewalk easement. Please make a sidewalk easement comment to cover the existing 10' sidewalk. Sidewalk Easement Note: A permanent easement is hereby granted to the City of Lee’s Summit to locate, construct and maintain or to authorize the location, construction and maintenance of a sidewalk for pedestrian access over, along and across the strips of land designated as “Sidewalk Easement” or by abbreviation “S/E” on the accompanying plat.
Miscellaneous Correction
Corrective Action Required
03/23/2022

Developer Information. Please show the Applicant, Box Real Estate Development, name and address.
Miscellaneous Correction
Corrective Action Required
03/23/2022

Locations and features. For the review period, please show the existing building located at 450 SW Longview Blvd like you did for 420, 340, and 440. Please show the entire rear dive aisle.
Miscellaneous Correction
Corrective Action Required
03/23/2022

Street name. Please show the “SW” prefix for the SW Tower Park Drive street label.
Miscellaneous Correction
Corrective Action Required
03/29/2022

Building setback. Please make a comment stating there is a 0' setback line.
Engineering Review Corrections 03/29/2022 03/24/2022
Sue Pyles, P.E.
Corrective Action Required
03/24/2022

Please provide a Utility Easement for the public storm sewer located within the plat boundary, near the SE corner of Lot 7B.
Traffic Review No Comments 03/29/2022 03/23/2022
Brad Cooley, P.E., RSPI
Fire Review No Comments 03/29/2022 03/14/2022
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Plat fee $850.00 $850.00 Paid 03/11/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 05/12/2022 5:00 PM Council Chambers 05/12/2022 05:00 PM
Public Hearing Review
Approved
05/12/2022
City Council Ordinance 1st Reading 06/07/2022 6:00 PM Council Chambers 06/07/2022 06:00 PM
Public Hearing Review
Approved
City Council Ordinance 2nd Reading 06/14/2022 6:00 PM Council Chambers 06/14/2022 06:00 PM
Public Hearing Review
Approved
Documents & Images
Date Uploaded File Type Document Name
03/11/2022 Plans 2022-03-11 20-106 Final Plat
03/11/2022 Application Form 20220311 Lot 7b-7e Final Plat App [Notarized]
03/11/2022 Application Form Checklist
03/11/2022 Letter Description - Final Plat
03/11/2022 Letter 20-106 BOUNDARY REPORT Final Plat
03/11/2022 Receipt Receipt for transaction:2022-001327
03/29/2022 Letter Applicant Letter - FP (DRCF)
04/08/2022 Plans 2022-04-08 20-106 Final Plat
04/08/2022 Letter Response to Comments dated 3-29-2022 Final Plat
04/18/2022 Letter Applicant Letter - FP (DRCF)
04/29/2022 Letter PL2022- 085 FP Tower Park Commercial Map
05/03/2022 Letter PL2022-085 FP Tower Park Commercial Staff Letter
06/22/2022 Ordinance 9435
06/24/2022 Plans 2022-06-24 20-106 Final Plat
08/17/2022 Ordinance Recorded Ordinance 9435
08/17/2022 Letter Recorded Tower Park Lot 7A-1 to 7A-3 and 7B-1
08/30/2022 Plans Tower Park - recorded plat
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home