Review Type |
Outcome |
Est. Completion Date |
Completed |
GIS Review
|
No Comments
|
07/01/2022
|
07/07/2022
|
|
Kathy Kraemer
|
|
|
Fire Review
|
No Comments
|
07/01/2022
|
06/29/2022
|
|
Jim Eden
|
|
|
Planning Review
|
Corrections
|
07/01/2022
|
06/29/2022
|
|
Victoria Nelson
|
|
Corrective Action Required
Easement language. There is no longer a public easement please change it so that it reflects the private easement with accompanying language identifying and defining the purpose and grantee, for AT&T.
|
|
|
Engineering Review
|
Approved with Conditions
|
07/01/2022
|
06/28/2022
|
|
Sue Pyles, P.E.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Traffic Review
|
No Comments
|
07/01/2022
|
06/28/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
GIS Review
|
No Comments
|
04/15/2022
|
04/18/2022
|
|
Kathy Kraemer
|
|
I am working with Jackson Co to establish ownership. Right now it is Dave's Roe. As such, another owner cannot be on this plat, since ownership has to match exactly. If ownership is split by deed before the recording of this plat, then this correction would be void. Please provide the recorded document number for such deed.
|
|
The vacation of ROW along Longview Blvd must already be recorded and the document number referenced on the plat.
|
|
|
Engineering Review
|
Approved with Conditions
|
04/15/2022
|
04/15/2022
|
|
Sue Pyles, P.E.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Fire Review
|
No Comments
|
04/15/2022
|
04/12/2022
|
|
Jim Eden
|
|
|
Traffic Review
|
No Comments
|
04/15/2022
|
04/11/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
Planning Review
|
No Comments
|
04/15/2022
|
04/11/2022
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Lot numbers. Following the City’s naming convention for replatted property to use the existing lot number as the base for the new lot number, Lot 7B shall be renamed 7B-1. Lots 7C-7E shall be renamed 7A-1, 7A-2 and 7A-3. Please update all references to lots numbers throughout the document as needed to reflect the revised lot numbers.
|
|
Miscellaneous Correction
Plat title. Please revise the plat title to read, “Tower Park, Lots 7A-1 thru 7A-3 and 7B-1”.
|
|
Miscellaneous Correction
Sidewalk easement. Please make a sidewalk easement comment to cover the existing 10' sidewalk.
Sidewalk Easement Note:
A permanent easement is hereby granted to the City of Lee’s Summit to locate, construct and maintain or to authorize the location, construction and maintenance of a sidewalk for pedestrian access over, along and across the strips of land designated as “Sidewalk Easement” or by abbreviation “S/E” on the accompanying plat.
|
|
Miscellaneous Correction
Developer Information. Please show the Applicant, Box Real Estate Development, name and address.
|
|
Miscellaneous Correction
Locations and features. For the review period, please show the existing building located at 450 SW Longview Blvd like you did for 420, 340, and 440. Please show the entire rear dive aisle.
|
|
Miscellaneous Correction
Street name. Please show the “SW” prefix for the SW Tower Park Drive street label.
|
|
Miscellaneous Correction
Building setback. Please make a comment stating there is a 0' setback line.
|
|
|
GIS Review
|
Corrections
|
03/29/2022
|
03/29/2022
|
|
Kathy Kraemer
|
|
Corrective Action Required
Please title/dedicate the plat using the plat name first, rather than "Lots" as this helps with indexing at Jackson County. Example: TOWER PARK COMMERCIAL PHASE 2 LOTS 7B THRU 7E
|
|
Corrective Action Required
Ownership at the county is listed as Daves Roe Bodyshop, not Box. Also, the extra 40 feet into Longview Blvd is LS ROW. If this has been vacated, please provide the recorded document number.
|
|
|
Planning Review
|
Corrections
|
03/29/2022
|
03/29/2022
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Corrective Action Required
Lot numbers. Following the City’s naming convention for replatted property to use the existing lot number as the base for the new lot number, Lot 7B shall be renamed 7B-1. Lots 7C-7E shall be renamed 7A-1, 7A-2 and 7A-3. Please update all references to lots numbers throughout the document as needed to reflect the revised lot numbers.
|
|
Miscellaneous Correction
Corrective Action Required
Plat title. Please revise the plat title to read, “Tower Park, Lots 7A-1 thru 7A-3 and 7B-1”.
|
|
Miscellaneous Correction
Corrective Action Required
Sidewalk easement. Please make a sidewalk easement comment to cover the existing 10' sidewalk.
Sidewalk Easement Note:
A permanent easement is hereby granted to the City of Lee’s Summit to locate, construct and maintain or to authorize the location, construction and maintenance of a sidewalk for pedestrian access over, along and across the strips of land designated as “Sidewalk Easement” or by abbreviation “S/E” on the accompanying plat.
|
|
Miscellaneous Correction
Corrective Action Required
Developer Information. Please show the Applicant, Box Real Estate Development, name and address.
|
|
Miscellaneous Correction
Corrective Action Required
Locations and features. For the review period, please show the existing building located at 450 SW Longview Blvd like you did for 420, 340, and 440. Please show the entire rear dive aisle.
|
|
Miscellaneous Correction
Corrective Action Required
Street name. Please show the “SW” prefix for the SW Tower Park Drive street label.
|
|
Miscellaneous Correction
Corrective Action Required
Building setback. Please make a comment stating there is a 0' setback line.
|
|
|
Engineering Review
|
Corrections
|
03/29/2022
|
03/24/2022
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Please provide a Utility Easement for the public storm sewer located within the plat boundary, near the SE corner of Lot 7B.
|
|
|
Traffic Review
|
No Comments
|
03/29/2022
|
03/23/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
Fire Review
|
No Comments
|
03/29/2022
|
03/14/2022
|
|
Jim Eden
|
|
|