Planning Application Status

PL2021409




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021409
Lee's Summit Commerce Center (Logistics) - Street, Storm Sewer and Grading
Engineering Plan Review
Engineering Plan Review
Complete
10/18/2021
LOWKAP LLC
Public street, storm and lighting for the relocation of Main St.
Locations
Contacts
LOWKAP LLC, Address:12709 WOODWARD ST  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review No Comments 06/25/2024 06/25/2024
Sue Pyles, P.E.
Record Drawings Review Corrections 02/22/2024 02/20/2024
Sue Pyles, P.E.
Record Drawings Review Corrections 11/08/2023 11/07/2023
Sue Pyles, P.E.
Engineering Review No Comments 01/20/2022 01/05/2022
Sue Pyles, P.E.
Traffic Review No Comments 01/20/2022 01/05/2022
Sue Pyles, P.E.
Engineering Review Corrections 01/03/2022 01/03/2022
Sue Pyles, P.E.
Corrective Action Required
01/04/2022

Please review the storm sewer structure quantities on the estimate and revise as needed.
Traffic Review No Comments 01/03/2022 01/03/2022
Brad Cooley, P.E., RSPI
Engineering Review Corrections 11/04/2021 11/05/2021
Sue Pyles, P.E.
Corrective Action Required
11/05/2021

General: • RCB comments will be provided under separate cover in the next few days. • Submit an Engineer's Estimate of Probable Construction Costs. • Please include specific information regarding connection to existing streets. Typically, specific sawcut information is provided.
Corrective Action Required
11/05/2021

Sheet 1: • Please list Lee’s Summit Water Utilities as the wastewater contact. • Remove the approval signature block for the City. A stamp will be provided electronically when approved.
Corrective Action Required
11/05/2021

Sheet 6: • The General Notes on this sheet don’t seem to be for this project. Please revise accordingly. • Please add a note stating: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.” • Show location of all oil/gas wells, or indicate none are present, and cite the source.
Corrective Action Required
11/05/2021

Sheet 14: • Please revise the curb and gutter type to CG-1 on the Main Street typical section and label it on the Sloan Street typical section. • The curb and gutter detail or pavement detail must show that the aggregate base and compaction of native subgrade extends a minimum of one (1) foot beyond the back of curb.
Corrective Action Required
11/05/2021

Sheet 20: Please show the sanitary sewer crossing near the proposed RCB.
Corrective Action Required
11/05/2021

Sheets 29-31: • Include the following note on any profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity. • Please add “w/Haunch Lid” as needed to make the labels match in both Plan and Profile views. • Please show the hydraulic grade line for the design storm on the profile view of the storm system.
Corrective Action Required
11/05/2021

Sheet 34: Please include inlet design information in the plan set.
Corrective Action Required
11/05/2021

Sheets 48-58: Any comments for the ESC design will be provided with the separate ESC plan set submitted. Please be sure to include any updates to those plans in this plan set.
Traffic Review Corrections 11/04/2021 11/03/2021
Brad Cooley, P.E., RSPI
Corrective Action Required
11/03/2021

Sheet 64-65 - Street name signs should be a combination of upper and lower case (ie. NW Sloan St.)
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home