Lee's Summit Commerce Center (Logistics) - Public Water
Engineering Plan Review
Engineering Plan Review
Complete
10/18/2021
LOWKAP LLC
Locations
Contacts
LOWKAP LLC, Address:12709 WOODWARD ST  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
SCANNELL PROPERTIES #603 LLC, Address:8801 RIVER CROSSING BLVD STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review No Comments 06/25/2024 06/25/2024
Sue Pyles, P.E.
Record Drawings Review Corrections 11/08/2023 11/07/2023
Sue Pyles, P.E.
Engineering Review No Comments 03/11/2022 03/14/2022
Sue Pyles, P.E.
Engineering Review Corrections 02/22/2022 02/23/2022
Sue Pyles, P.E.
Corrective Action Required
02/23/2022

Abandonment: • The existing water line along NW Main Street is to be abandoned between the connection to the new alignment and connection to the existing water main along the north side of NW Victoria Drive. • Our records indicate the water main to be abandoned east of the existing Main Street water main is located at the next property line to the north from where it is shown in the plans. Please verify this location and show it abandoned east to the existing water main along the west side of NW Sloan Street.
Corrective Action Required
02/23/2022

Please revise the material callouts in the Profile views for clarity. The callout should refer to the water main between match lines on each sheet.
Corrective Action Required
02/23/2022

Sheet WM3.01 is in the plan set twice. The first one appears to be the wrong sheet.
Corrective Action Required
02/23/2022

Sheet WM3.06: Please show the existing water main crossing SW Sloan Drive at the connection point of the new alignment.
Engineering Review Corrections 02/11/2022 02/11/2022
Sue Pyles, P.E.
Corrective Action Required
02/11/2022

Sheet WM1.01: • Include all items, including abandonment items, in the Estimate of Quantities table. • Delete the sanitary sewer Estimate of Quantities table.
Corrective Action Required
02/11/2022

Sheet WM2.00: Include layout of existing mains to be abandoned.
Corrective Action Required
02/11/2022

Sheets WM3.00-3.06: • Please include pipe information in all Profile views (length, size, material). • The pipe sizes required along Main and Sloan are 12” and 8”, respectively. • In all locations where “Steel Encasement” is shown, please clarify what that is. I don’t see any detail. Please ensure that it meets Design and Construction Manual design requirements.
Corrective Action Required
02/11/2022

Sheet WM3.00: • Show connection to existing callout in both Plan and Profile views. • It appears that a bend is needed at Sta. 2+05.
Corrective Action Required
02/11/2022

Sheet WM3.03: Label the Proposed Grade line.
Corrective Action Required
02/11/2022

Sheet WM3.05: • Show connection to existing callout in both Profile view. • The bend size at Sta. 23+67 is incorrect. Please revise.
Corrective Action Required
02/11/2022

Sheet WM3.06: • Why doesn’t the proposed alignment remain along the north side of Sloan? It would appear that a mostly straight alignment would make more sense than crossing Sloan. Please explain or revise. • Please relocate overlapping callouts in Plan view for clarity. • What is the lower dashed line Sta. 0+00 – Sta. 2+46 in Profile view? Please clarify or delete.
Corrective Action Required
02/11/2022

Sheets WM4.00-4.01: Please remove any unused details.
Engineering Review Corrections 11/04/2021 11/03/2021
Sue Pyles, P.E.
Corrective Action Required
11/03/2021

Please submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
11/03/2021

Additional Items: • Please install a new 8” water main along the north/west side of NW Sloan Street to connect this main with the existing main that ends at NW Sycamore Street. • Please abandon the existing water main from the connection of the relocated main south of NW Sloan Street north to the existing main on the north side of NW Victoria Drive. • Please abandon the existing water main from the above described abandoned main east to the existing main on the west side of NW Sloan Street.
Corrective Action Required
11/03/2021

Sheet WM1.00: • The contact number listed for City Hall is the Development Services phone number, and the contact number listed for Development Services is the Public Works phone number. Please revise the Utility and Governing Agency Contact Information table accordingly. • Please revise “Utility Services Center” to “Water Utilities” in the Utility and Governing Agency Contact Information table. • Please include “PUBLIC” in the project title on this sheet and title blocks throughout the plan set.
Corrective Action Required
11/03/2021

Sheet WM1.01: • Shop Drawing Note 2A references sanitary sewer structures being installed with this project. That note does not apply, please remove. • Since this is all public water main, please revise Water Plan Note to reflect this. Reference 42” and 84” (7’) as the minimum and maximum cover allowed. • Please include FH locations as a part of the design. Spacing requirements can be found in Design and Construction Manual Section 6901.J. Revise the Estimate of Quantities and the Plan & Profile sheets accordingly. • Show location of all oil/gas wells, or indicate none are present, and cite the source. • Please add a note stating: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.”
Corrective Action Required
11/03/2021

Sheet WM2.0: • The existing sanitary sewer north of relocated Main Street is shown out of the existing sanitary sewer easement. Please verify. • Please label the detention basin easements to match the Plat. • Please show all existing water lines on this sheet and throughout the plan set.
Corrective Action Required
11/03/2021

Sheets WM3.00-WM3.05: • Please review and verify that the 48” minimum cover requirement is being met. Revise as needed. • Please show all crossings in Profile view and verify all horizontal and vertical separation requirements are being met. • In the Plan views, it appears that the proposed water line is shown matching the curve of the street, but bends are labeled and chords are shown. Deflection, 1 degree maximum, is only allowed at joints. This equates to allowable curves of 1320’ radii, +/-. Please clarify this alignment, and verify this requirement is being met. • Please relocate overlapping text at Sta. 22+46.53 in Profile view for clarity. • Since the connection point for the fire line associated with the Final Development Plan that has been submitted is known, it makes more sense to install that tee as a part of this project. If the fire line connection points for the remaining two buildings proposed as a part of the overall development can be reasonably established, those tees can also be installed with this project.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
10/18/2021 Plans 05_Public Water Main Plans_2021_10_14
11/05/2021 Letter DE-Comment Letter (Engineering Plans)
01/21/2022 Letter 05_Comment Response Letter_Public Water Main Plans
01/24/2022 Plans 06_Public Water Main Plans_2022_01_20
02/11/2022 Letter DE-Comment Letter (Engineering Plans)
02/14/2022 Engineers Estimate Scannell Bid Form - Kadean Construction - Lee's Summit Commerce 02-14-2022 INFRA Only
02/14/2022 Plans 02_Public Water Main Plans_2022_02_14
02/14/2022 Letter 01_Comment Response Letter_Public Water Main Plans
02/23/2022 Letter DE-Comment Letter (Engineering Plans)
03/04/2022 Plans 02_Public Water Main Plans_2022_03_04
03/04/2022 Plans 02_Public Water Main Plans_2022_03_04
03/04/2022 Letter 2022_03_04 Plan Review_Comment Responses
03/23/2022 Activity Document Lees Summit Logistics Water Model
04/20/2022 Letter PL2021408 Lee's Summit Logistics MDNR Conc. Letter - WAT Signed
05/31/2022 Engineers Estimate 20220406 LSCC Site Breakout for City
05/31/2022 Activity Document Fees PL2021408 Lee's Summit Logistics Public Water
06/27/2022 Approved Plans Lees Summit Commerce Center - water approved 6.27.22
07/26/2022 Activity Document LEES SUMMIT PWS-MO1010459-JACKSON CO-20220718-1000090-22-PDWB-CI
07/26/2022 Letter DE-Engineering Plans Approval Letter
11/01/2023 Plans 2023-10-30_Public Watermain Plans _Record Drawings
11/07/2023 Email PL2021408 LS Commerce Center Water & PL2021409 LS Commerce Center Street and Storm Record Drawing Review Comments
06/18/2024 Plans Public Watermain Plans _Record Drawings_Rev 1_PL2021408
06/25/2024 Accepted Record Drawings Lees Summit Logistics Water AsBuilts Accepted RD
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home