Summary
PL2021380
Town Centre Lot 1
Commercial Rezoning with Preliminary Development Plan
Commercial Rezoning with Preliminary Development Plan
Expired
09/30/2021
WHD MANAGEMENT LLC
Locations
Contacts
WHD MANAGEMENT LLC, Address:PO BOX 1059  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
WHD MANAGEMENT LLC, Address:PO BOX 1059  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Corrections 11/09/2021 11/09/2021
Hector Soto Jr.
Corrective Action Required
11/09/2021

No revised architectural plan set was resubmitted.
Engineering Review Approved with Conditions 11/09/2021 11/09/2021
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
11/10/2021

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
11/10/2021

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #06 Land Disturbance
Corrective Action Required
11/10/2021

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
11/10/2021

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
11/10/2021

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Fire Review Approved with Conditions 11/09/2021 11/09/2021
Jim Eden
Code Statement
Corrective Action Required
11/10/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Resolved
11/09/2021

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required- The FDC on Pad Site 2 exceeds 100 feet to a hydrant.
Misc.
Resolved
11/09/2021

In the pre application meeting it was discussed the business is geared towards the storage of commercial vehicles and large RV's. That being said, the maximum square footage before a sprinkler is required is 5,000 square feet. 903.2.9 Group S-1. An automatic sprinkler system shall be provided throughout all buildings containing a Group S-1 occupancy where one of the following conditions exists: 1. A Group S-1 fire area exceeds 12,000 square feet (1115 m2). 4. A Group S-1 fire area used for the storage of commercial motor vehicles where the fire area exceeds 5,000 square feet (464 m2). Action requred- Buildings used for the storage of commercial vehicles greater than 5,000 square feet shall be sprinklered. 11/8/2021- All buildings capable of storing large commercial vehiles were reduced to 5,000 square feet.
Imposed Loads
Resolved
11/09/2021

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Action required- All fire access lnes shall be heavy duty asphalt capabable of supporting 75,000-pounds.
Knox Locks
Corrective Action Required
11/10/2021

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required- Provide Knox Boxes on the sprinkled buildings and Knox entry systems on any gates that may be installed.
Misc.
Corrective Action Required
11/10/2021

Project phasing shall include the second access when the combined building square footage exceeds the limits set forth in IFC SECTION D104.
Traffic Review No Comments 11/09/2021 11/08/2021
Brad Cooley, P.E., RSPI
Planning Review Corrections 10/15/2021 10/17/2021
Hector Soto Jr.
Corrective Action Required
10/15/2021

SPECIAL USE PERMIT. The proposed mega storage facility requires approval of a special use permit. Submit a special use permit application to accompany the rezoning and preliminary development plan application.
Corrective Action Required
10/15/2021

PLAN BOUNDARIES. Correct the legal description listed on Sheet C1.0 and Sheet A1.0 to read: Lot 1, Lee's Summit Town Centre, Lot 1 & Lot 2.
Corrective Action Required
10/17/2021

PROPERTY LINE INFORMATION. List the platted property line bearings and dimensions.
Corrective Action Required
10/17/2021

STREETS. Label the NE Town Centre Dr right-of-way.
Corrective Action Required
10/17/2021

PARKING. - It appears that there will not be an office or any kind of on-site staffing for the mega storage facility. Please confirm that this is the case and provide an explanation of how the facility is managed/staffed. - Revised the minimum required parking calculation for the mega storage facility. It appears to have been calculated by applying 2 parking spaces for every large building. The UDO's intention is for 2 parking spaces for the facility as a whole, plus 1 for the maximum number of employees on the largest shift. - A minimum of two striped parking spaces shall be required for the site. If no striped spaces are proposed, provide a written request and justification for a modification to this UDO requirement.
Corrective Action Required
10/17/2021

LOT LAYOUT. It appears that the approximatley 11 acre site is intended to be subdivided into 3 lots and a common area tract. - Provide the lot dimensions for all future lots and tract. - Provide a cross-access easement(s) for all of the shared drives.
Corrective Action Required
10/17/2021

COMMON AREA. Add a note dedicating ownership and maintenance responsibilities for the common area tract to the property owners association. The creation of common area requires the establishment of a property owners association.
Corrective Action Required
10/17/2021

SECURITY/PERIMETER FENCING. Show the location of all fencing and/or gates that will secure the storage facility.
Corrective Action Required
10/17/2021

DRIVEWAYS/DRIVE AISLES. All two-way driveways and internal parking lot drive aisles serving two-way traffic shall have a minimum width of 28', measured to the back of curb. No driveway or drive aisle dimensions are provided on the site plans.
Corrective Action Required
10/17/2021

LANDSCAPE PLAN. - The proposed ornamental trees do not meet the minimum 3" caliper size for deciduous trees required under the UDO. The UDO does not differentiate between shade and ornamental trees in establishing a minimum caliper size for decidous trees. - All open areas not covered with other landscaping material shall be sodded. The landscape plan planting list identifies hatched areas as being sodded, but the plan itself does not show any hatching anywhere.
Corrective Action Required
10/17/2021

BUILDING ELEVATIONS. - Label the roof pitch on the storage buildings. The UDO requires a minimum 1:3 pitch on the storage buildings. - Label the roof pitch on the Lot A building. Buildings with a pitch of 2" vertical to 12" horizontal or less shall incorporate detailed parapets or exaggerated cornice lines to provide architectural relief for flat roofs. The same is required on the Lot B building. - All industrial buildings are required to have four-sided architecture extending horizontal and vertical architectural embellishments and projections to provide relief for large expanses of flat walls. - This property is not located in a specified metal building area where smooth finished metal panels are an approved material. Rough-textured metal panel systems (e.g. EIFS) may be used. - Any smooth finished metal panels that may be proposed for approval as a conditional use shall have a sample submitted to staff for review.
Corrective Action Required
10/17/2021

MECHANICAL EQUIPMENT. Show all roof-mounted and ground-mounted mechanical equipment on the building elevations and/or site plan to the extent possible. RTUs shall be fully screened from view by raising parapet heights as least equal to the height of the units being screened. Ground-mounted equipment shall be fully screened from view using evergreen landscaping.
Corrective Action Required
10/17/2021

TRASH ENCLOSURE. All proposed trash enclosures shall comply with the design requirements of UDO Section 8.180.G.
Corrective Action Required
10/17/2021

REZONING EXHIBIT. A rezoning exhibit shall be provided identifying the limits and legal description of the property proposed to be rezoned from CP-2 to PI.
Engineering Review Corrections 10/15/2021 10/15/2021
Sue Pyles, P.E.
Corrective Action Required
10/15/2021

General: • Please remove sheets C2.2-C2.3. Erosion control design is not needed in the Preliminary Development Plan (PDP) stage. • Storm sewer profiles are not required at the PDP stage and may be removed. The profiles have not been reviewed with this submittal. • Please clarify the lines that appear to show individual lots. This is a single lot. • Further comments regarding stormwater and detention may be forthcoming after the Macro Storm Water Study has been revised.
Corrective Action Required
10/15/2021

Sheet C1.0: • Please include “Preliminary Development Plan” in the project title. • Please revise the “Storm Sewer – City of Lee’s Summit” phone number to 816-969-1800 in the Utility Contact list. • Please revise the legal description to be for this lot only. • Please revise the Sheet Index based on other comments that follow.
Corrective Action Required
10/15/2021

Sheet C1.1: • Please note that City pavement design requirements must be met. If a geotechnical report is used to determine the paving requirements, the design must be equal to or better than the City’s requirements. General Notes 13 & 20 seem to contradict this. • Please remove the “transportation department of Missouri” reference from General Note 17, it is not applicable. • Please revise Erosion Control Note 3, the City does not issue a “soil erosion and sedimentation control” permit.
Corrective Action Required
10/15/2021

Sheet C1.3: • The sanitary sewer and water line extensions required by this project will all be private. • Please relocate the backflow devices to be just on the private side of the easement at each connection location to the public main. • The size of water line shown seems excessive. Please confirm.
Corrective Action Required
10/15/2021

Storm Water Macro Storm Water Study: The City requires detention design utilize the “Comprehensive Control” release rate strategy. This includes 40-hour extended detention as the Water Quality requirement. Please revise the study to meet this requirement.
Traffic Review No Comments 10/15/2021 10/12/2021
Brad Cooley, P.E., RSPI
Fire Review Corrections 10/15/2021 10/12/2021
Jim Eden
Code Statement
Informational
10/12/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
10/12/2021

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required- The FDC on Pad Site 2 exceeds 100 feet to a hydrant.
Misc.
Corrective Action Required
10/12/2021

In the pre application meeting it was discussed the business is geared towards the storage of commercial vehicles and large RV's. That being said, the maximum square footage before a sprinkler is required is 5,000 square feet. 903.2.9 Group S-1. An automatic sprinkler system shall be provided throughout all buildings containing a Group S-1 occupancy where one of the following conditions exists: 1. A Group S-1 fire area exceeds 12,000 square feet (1115 m2). 4. A Group S-1 fire area used for the storage of commercial motor vehicles where the fire area exceeds 5,000 square feet (464 m2). Action requred- Buildings used for the storage of commercial vehicles greater than 5,000 square feet shall be sprinklered.
Imposed Loads
Corrective Action Required
10/12/2021

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Action required- All fire access lnes shall be heavy duty asphalt capabable of supporting 75,000-pounds.
Knox Locks
Informational
10/12/2021

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official.
Misc.
Informational
10/12/2021

Project phasing shall include the second access when the combined building square footage exceeds the limits set forth in IFC SECTION D104.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Commercial Rezoning and Preliminary Development Plan fee $4,350.00 $4,350.00 Paid 09/30/2021
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 09/30/2021
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 09/30/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 12/02/2021 05:00 PM Council Chambers 12/02/2021 05:00 PM
Public Hearing Review
Approved
12/02/2021
City Council Public Hearing 01/04/2022 06:00 PM Council Chambers 01/04/2022 06:00 PM
Public Hearing Review
Approved
01/04/2022
City Council Ordinance 2nd Reading 01/11/2022 12:00 AM 06:00 PM Council Chambers 01/11/2022 06:00 PM
Public Hearing Review
Approved
Documents & Images
Date Uploaded File Type Document Name
09/30/2021 Application Form Application Form 09-30-2021
09/30/2021 Application Form Ownership Affidavit 09-30-2021
09/30/2021 Receipt Receipt for transaction:2021-007688
10/01/2021 Application Form Town Centre Lot 1 - PDP Rezoning - Checklist
10/01/2021 Specifications Town Centre Lot 1 - Area Lighting Spec Sheet
10/01/2021 Plans Town Centre Lot 1 - Zoning Explanation
10/01/2021 Plans Town Centre Lot 1 - Survey - Existing Conditions
10/01/2021 Engineer Report/Study Town Centre Lot 1 - Macro Study - 10_1_2021
10/01/2021 Plans Town Centre Lot 1- PDP - Civil Set - 10_01_2021
10/01/2021 Plans Town Centre Lot 1- Architectural Set
10/17/2021 Letter Applicant Letter - Dev. Apps (DRCP)
11/02/2021 Letter Town Centre Lot 1 - Applicant Letter Response 11-02-2021
11/02/2021 Plans Town Centre Lot 1- PDP - Civil Set - 11_02_2021
11/02/2021 Engineer Report/Study Town Centre Lot 1 - Macro Study - 11_02_2021
11/04/2021 Activity Document Neighborhood meeting notice
11/10/2021 Letter Applicant Letter - Dev. Apps (DRCP)
11/11/2021 Public Notice Document LEGAL PL2021-380 REZ PDP
11/12/2021 Public Notice Document IMG_1244
11/12/2021 Public Notice Document IMG_1245
11/22/2021 Public Notice Document Legal notice for PC
11/22/2021 Plans Town Centre Lot 1- PDP - Arch Site Plans and Landscaping - 11_22_2021
11/22/2021 Plans Town Centre Lot 1- PDP - Elevations - 11_22_2021
11/24/2021 Engineer Report/Study Storm Water Study - report only
11/29/2021 Engineer Report/Study TIA
11/29/2021 Drawing Location Map
11/29/2021 Letter Staff Report
12/02/2021 Presentation Town Centre Presentation 12-02-2021
12/27/2021 Letter Business Operations Narrative
01/04/2022 Public Notice Document Legal notice for CC
01/04/2022 Presentation Lot1Presentation 1-4-22
01/04/2022 Presentation Lot1Presentation 1-4-22
01/18/2022 Ordinance 9318
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents