Planning Application Status

PL2021335




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021335
Oakview - Lot 3
Commercial Final Development Plan
Commercial Final Development Plan
Withdrawn
08/30/2021
STAR ACQUISITIONS & DEVELOPMENT LLC
The property was sold for the 7 Brews Coffee development
Locations
Contacts
STAR ACQUISITIONS & DEVELOPMENT LLC, Address:244 W MILL STE 101  
AGC Engineers, INc, Address:405 S Leonard, Suite D, Phone:(816) 781-4200  
STAR ACQUISITIONS & DEVELOPMENT LLC, Address:244 W MILL STE 101  
SCHARHAG ARCHITECTS, Address:6247 BROOKSIDE BLVD STE 204, Phone:(816) 656-5055  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 11/04/2021 11/04/2021
Loic Nguinguiri, E.I.
DE Engineers Estimate
Corrective Action Required
11/04/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
DE Future Repair Work
Corrective Action Required
11/04/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE Contact Field Eng. Inspector
Corrective Action Required
11/04/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE C&O #11 Pavement Thickness
Corrective Action Required
11/04/2021

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Traffic Review No Comments 11/04/2021 11/02/2021
Brad Cooley, P.E., RSPI
Fire Review Approved with Conditions 11/04/2021 11/02/2021
Jim Eden
Code Statement
Corrective Action Required
11/04/2021

All issues pertaining to life safety and property protection from the hazards of fire, shall be in accordance with the 2018 International Fire Code. *The use of the building and tenant finish may require additional fire protection not currently shown on this plan.
Planning Review No Comments 11/04/2021 11/01/2021
Hector Soto Jr.
Building Codes Review No Comments 11/04/2021 10/28/2021
Joe Frogge
Engineering Review Corrections 10/12/2021 10/13/2021
Loic Nguinguiri, E.I.
Corrective Action Required
10/13/2021

Revise general project note 3 to state that all construction shall follow City of Lee’s Summit’s Design and Construction manual.
Corrective Action Required
10/13/2021

Although 2% cross-slope and 8.33% running slope are allowed, it is recommended that the sidewalks be designed to include construction tolerances. Design slopes of 1.5% and 7.5% are typical. Please note that during the inspection process, sidewalks that exceed the maximum allowable slopes at all will be rejected. There is no allowance given during construction.
Corrective Action Required
10/13/2021

On the grading and ESC plan, add/provide silt fence barrier along the northern property line. (i.e. approximately from proposed contour elevation 1030 down to proposed contour elevation 1025)
Corrective Action Required
10/13/2021

Staff recommends adding a note on the utility plan sheet about vertical clearance at crossings between utility lines to be 18” minimum.
Corrective Action Required
10/13/2021

Revise the proposed spot elevations over the concrete pavement area in order to improve the stormwater runoff drainage. A couple of corner areas appear to be susceptible to water ponding.
Corrective Action Required
10/13/2021

State where core drilling is expected to take place in order to connect new storm line to existing storm structure.
Corrective Action Required
10/13/2021

On the EOOPCC sheet, remove the cost items showing quantity = 0, item #13 and item #17. Make sure to also add cost items for the water line reducers, sanitary sewer cleanouts and sanitary sewer bends. Water linear footage estimation needs to be broken down into a 3/4 “ water service and a 1” water service cost items.
Corrective Action Required
10/13/2021

Please provide a SWPPP report and a Missouri DNR permit.
Planning Review No Comments 10/12/2021 10/12/2021
Hector Soto Jr.
Fire Review Approved with Conditions 10/12/2021 10/07/2021
Jim Eden
Code Statement
Informational
10/05/2021

All issues pertaining to life safety and property protection from the hazards of fire, shall be in accordance with the 2018 International Fire Code. *The use of the building and tenant finish may require additional fire protection not currently shown on this plan.
Building Codes Review No Comments 10/12/2021 10/05/2021
Mike Weisenborn
Traffic Review No Comments 10/12/2021 10/05/2021
Mike Weisenborn
Planning Review Corrections 09/14/2021 09/15/2021
Hector Soto Jr.
Corrective Action Required
09/15/2021

PROPERTY LINE INFORMATION. - None of the bearings labeled on Sheet 3 match the recorded plat. Where the measured bearings differ from the plat, list both and identify them as (M) and (R) accordingly. - The property line dimension for the east-west segment coming off the northeast lot corner doesn't match the plat. List and identify the measured and recorded dimension.
Corrective Action Required
09/15/2021

ACCESS EASEMENTS. Identify the Private Access Easement covering Private Drive A and Private Drive B allowing ingress and egress to the subject property.
Corrective Action Required
09/15/2021

PARKING LOT BOUNDARY. Temporary asphalt curbing shall be installed at the southeast corner of the parking lot where a future parking lot connection will be made to the abutting property to the south at the time of its development.
Corrective Action Required
09/15/2021

BUILDING ELEVATIONS. - The building shall incorporate four-sided architecture. Extend the masonry base to all four sides of the building. - Projections and/or off-sets shall be provided on all four sides of the building to break up the large wall planes. - Incorporate vertical and horizontal architectural features to provide more visual interest and greater textural and material contrast.
Engineering Review Corrections 09/14/2021 09/14/2021
Loic Nguinguiri, E.I.
Corrective Action Required
09/14/2021

Dena Mezger is an out of date contact for Public Works. Names aren’t normally needed for the City’s contact info, but feel free to include an up-to-date one.
Corrective Action Required
09/14/2021

Staff recommends increasing the font size of the street names shown within the vicinity map.
Corrective Action Required
09/14/2021

Remove SWPPP from general project note 1 since non-applicable for this project.
Corrective Action Required
09/14/2021

On the site plan sheet, show and label temporary curb across the connection to the adjacent lot. Include a detail for the temporary curb, as well.
Corrective Action Required
09/14/2021

The 90-degree turn in the sidewalk located just south of private drive A must meet slope requirements of a turning space. Label and also include design information (cross and running slopes) with the other sidewalk ramp designs.
Corrective Action Required
09/14/2021

Make sure to obtain the appropriate permission or temporary construction easement to perform grading and construction work outside of the property limits, as necessary.
Corrective Action Required
09/14/2021

Extend both northern and southern sit fence barriers up to the edge(s) of existing embankment located to the east, by the eastern property line.
Corrective Action Required
09/14/2021

In the legend shown on the utility plan sheet, add a symbol for the sanitary lateral bends/fittings. Make sure to also label them on plan view.
Corrective Action Required
09/14/2021

Revise the inaccurate location of leader B1 in the utility plan view. Make sure to also revise the B1 pipe material to Soft type K copper in the legend.
Corrective Action Required
09/14/2021

Location of reducers (from 1 in to 3/4 in), past the water meters, must be shown as well on plan view for the 4 domestic service lines. Make sure to also add a symbol for it in the utility plan legend.
Corrective Action Required
09/14/2021

Add/label the leaders for existing vs proposed grade lines within the profile view of storm line 2 shown on sheet 11.
Corrective Action Required
09/14/2021

Revise the thickness of aggregate base mentioned in CG-1 note 4 to 4” thick.
Corrective Action Required
09/14/2021

The City requires a 6”-thick minimum layer of granular bedding (aggregate fill) under utility pipe. Revise the trenching and backfill construction detail(s) accordingly.
Corrective Action Required
09/14/2021

Only ornamental tree varieties are allowed within public easements. Review and verify that the landscaping plan meets this requirement.
Corrective Action Required
09/14/2021

Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet.
Traffic Review No Comments 09/14/2021 09/14/2021
Brad Cooley, P.E., RSPI
Fire Review Approved with Conditions 09/14/2021 09/09/2021
Jim Eden
Code Statement
Informational
09/09/2021

All issues pertaining to life safety and property protection from the hazards of fire, shall be in accordance with the 2018 International Fire Code. *The use of the building and tenant finish may require additional fire protection not currently shown on this plan.
Building Codes Review No Comments 09/14/2021 09/08/2021
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 08/30/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
08/30/2021 Application Form FDP application (signed)
08/30/2021 Engineers Estimate 2021-08-19 Oakview Lot 3 Opinion of Cost
08/30/2021 Plans ARCH Oakview Lot 3 FDP Set 8_20_21
08/30/2021 Engineer Report/Study 2021-08-19 Oakview Lot 3 Storm Memo
08/30/2021 Plans FDP-SITE PLANS-OAKVIEW LOT 3
08/30/2021 Receipt Receipt for transaction:2021-006967
09/15/2021 Letter Applicant Letter - FDP (DFDP)
10/05/2021 Letter 2021-09-30 response ltr
10/05/2021 Plans FDP-SITE PLANS-OAKVIEW LOT 3-rev2
10/05/2021 Plans ARCH Oakview Lot 3 FDP 9-23-21
10/14/2021 Letter Applicant Letter - FDP (DFDP)
10/28/2021 Letter 2021-10-22 response ltr
10/28/2021 Plans FDP-SITE PLANS-OAKVIEW LOT 3 (changes highlighted)
10/28/2021 Plans FDP-SITE PLANS-OAKVIEW LOT 3-rev2
11/04/2021 Letter Applicant Letter - FDP (DFDP)
11/04/2021 Activity Document CV Fee Worksheet PL2021-335
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home