Planning Application Status

PL2021289




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021289
Renourish Counseling Office
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
Approved
07/29/2021
RICHARDSON TIMOTHY W & MARYDEE TRUSTEE
Locations
Contacts
RICHARDSON TIMOTHY W & MARYDEE TRUSTEE, Address:832 NE EMILY LN  
Scott Ready, Phone: 8169691225  
Becca McConville, Phone:(816) 804-6599  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 10/21/2021 10/20/2021
Scott Ready
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
10/14/2021

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
10/14/2021

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
10/14/2021

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
Fire Review Approved with Conditions 10/21/2021 10/20/2021
Scott Ready
Code Statement
Corrective Action Required
10/14/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. Action required- The house shall meet the requirements for a B- Occupancy Group. Verified at inspection.
Planning Review No Comments 10/22/2021 10/20/2021
Shannon McGuire
Planning Review Approved with Conditions 10/21/2021 10/14/2021
Scott Ready
Engineering Review Approved with Conditions 10/12/2021 10/13/2021
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
10/13/2021

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
10/13/2021

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
10/13/2021

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
Planning Review Corrections 10/12/2021 10/13/2021
Shannon McGuire
Corrective Action Required
10/13/2021

Minimum landscaping standards require that 1 tree be planted for each 30 feet of street frontage and 1 shrub be provided for each 20 feet of street frontage. Additionally, tree planting areas shall be no less than ten feet in width and no tree shall be located less than four feet from the back of curb. As proposed the UDO minimum tree planting requirement cannot be satisfied. Please provide a landscaping plan for the street shrubs. You will also need to include a modification request to seek a relief from installing the required street tree.
Corrective Action Required
10/13/2021

Since you are proposing to utilize offsite parking, please connect the proposed internal sidewalk to the existing public sidewalk. This will give pedestrians access the structure without having to walk in the driveway/parking lot.
Traffic Review No Comments 10/12/2021 10/12/2021
Brad Cooley, P.E., RSPI
Fire Review Approved with Conditions 10/12/2021 10/08/2021
Jim Eden
Code Statement
Corrective Action Required
10/13/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. Action required- The house shall meet the requirements for a B- Occupancy Group. Verified at inspection.
Traffic Review No Comments 08/13/2021 08/16/2021
Scott Ready
Planning Review Corrections 08/13/2021 08/13/2021
Shannon McGuire
Corrective Action Required
08/13/2021

Please provide the floor plan you mention in your modification request letter. This will be used to help evaluate your requested modification.
Corrective Action Required
08/13/2021

You will need to provide elevations of the property. This can be accomplished with photos of the current home.
Corrective Action Required
08/13/2021

Both of the proposed parking stall layouts do not meet ADA requirements. Since only one stall is being proposed it must be van accessible. This will require the adjacent aisle be a minimum of 8 feet wide. Please adjust the proposed design to meet this requirement. Additionally, since you are working with a small space you may want to reduce the width of the stall to the minimum requirement of 8’ to help facilitate squeezing it in there.
Corrective Action Required
08/13/2021

The UDO requires curbing to be installed around the parking lot. If you wish to seek a modification for this requirement you must provide a written request and justification.
Corrective Action Required
08/13/2021

The UDO also requires a 20’ setback from the right-of-way for all parking lots. You will need to seek a modification for this as well. Please add this request and justification to your request letter.
Engineering Review Corrections 08/13/2021 08/13/2021
Sue Pyles, P.E.
Corrective Action Required
08/16/2021

As submitted, the drawings do not include information required by the Unified Development Ordinance (UDO). Please revise the format and submit one layout design that includes the items required by the UDO.
Corrective Action Required
08/16/2021

Since this project is increasing the impervious area on the site, stormwater requirements must be met. Either a stormwater report addressing how the additional runoff will be handled or a stormwater memo outlining why this project meets an exemption from the City’s Design and Construction Manual Section 5600 must be submitted. The report or memo must be signed and sealed by a Professional Engineer licensed in the State of Missouri.
Fire Review Approved with Conditions 08/13/2021 08/03/2021
Jim Eden
Code Statement
Corrective Action Required
08/03/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. Action required- The house shall meet the requirements for a B- Occupancy Group. Verified at inspection.
Fees
Paid Fees Amount Paid Owing Date Paid
Commercial Preliminary Development Plan fee $2,175.00 $2,175.00 Paid 08/05/2021
Legal Notice Publishing Charge $165.00 $165.00 Paid 08/05/2021
Legal Notice Publishing Charge $165.00 $165.00 Paid 08/05/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 11/04/2021 05:00 PM Council Chambers 11/04/2021 05:00 PM
Public Hearing Review
Approved
11/04/2021
City Council Public Hearing 12/07/2021 06:00 PM Council Chambers 12/07/2021 06:15 PM
Public Hearing Review
Approved
12/07/2021
City Council Ordinance 2nd Reading 12/14/2021 06:00 PM Council Chambers 12/14/2021 06:00 PM
Public Hearing Review
Approved
Documents & Images
Date Uploaded File Type Document Name
07/30/2021 Letter City of LS 3
07/30/2021 Letter City of LS 2
07/30/2021 Plans 21_16_ReNourish Site
07/30/2021 Application Form PDP w Notary (1)
08/05/2021 Receipt Receipt for transaction:2021-006253
08/16/2021 Letter Applicant Letter - Dev. Apps (DRCP)
08/20/2021 Letter Neighborhood meeting letter for August 30th
08/31/2021 Meeting Summary Public Hearing for 102 SW 2nd Street Lee
10/05/2021 Letter COMMENT RESPONSE LETTER
10/05/2021 Plans CIVIL PLANS 10-5-2021
10/05/2021 Plans BLDG ELEVATIONS
10/05/2021 Letter MODIFICATION REQUEST LETTER
10/05/2021 Letter STORM MEMO 211005
10/13/2021 Letter Applicant Letter - Dev. Apps (DRCP)
10/14/2021 Public Notice Document Notice to Property Owners PC CC
10/14/2021 Public Notice Document Property Owner List_Word Doc_081621
10/14/2021 Public Notice Document Property Owner List_Excel Doc_081621
10/14/2021 Public Notice Document Affidavit of Notice to Property Owners_Renourish_PDP
10/14/2021 Public Notice Document Public hearing Sign - ReNourish
10/15/2021 Photograph Renourish Public Notice Sign_Posted 101521
10/15/2021 Letter MODIFICATION REQUEST LETTER 10-15-2021
10/15/2021 Plans CIVIL 10-15-2021
10/20/2021 Letter Applicant Letter - Dev. Apps (DRCP)
10/27/2021 Public Notice Document DOC102721-001
10/28/2021 Public Notice Document Renourish - Signed Affidavit
11/02/2021 Letter PL2021289 ReNourish Counseling Office TIA
11/03/2021 Letter PL2021-289 PDP ReNourish
11/17/2021 Public Notice Document LEGAL PL2021-289 PDP
11/30/2021 Public Notice Document DOC113021-003
12/27/2021 Ordinance 9296
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home