Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
Approved with Conditions
|
03/30/2021
|
03/30/2021
|
|
Jennifer Thompson
|
|
Corrective Action Required
It was noted in the landscape table the proposed evergreen heights on some species were less than 8' in height. The UDO requires a maximum height of 8' for all required plantings of an evergreen species. If the evergreens are required plantings, please revise the landscape table to reflect the correct height.
A modification would be required for a reduced height.
|
|
Corrective Action Required
In the landscape table for the length of medium impact area (the length of the lot), doesn't match the scaled length of the platted lot. The true length, once calculated would adjust these numbers slightly. Please revise the numbers and landscape sheet accordingly.
A modification would be required if the numbers are not met.
|
|
Corrective Action Required
The open space landscape requirements for the site aren't calculated correctly. The lot square footage minus the building footprint (only), is the number to use for the formula for calculating the required quantities of species. It seems the paved area was used as well.
Depending on location and considered on a case by case basis: trees & shrubs for the open yard calculation may be allowed to be counted toward buffer screening; and street frontage shrubs may be counted toward parking lot screening if they serve that purpose.
|
|
Corrective Action Required
Provide images of the lighting specifications within the table on the photometric sheet.
|
|
Corrective Action Required
In regards to the east elevation. I understand the confusion on previously approved applications and the UDO standards. Staff will be recommending approval of 50% approved materials and a 50% metal ratio.
Can we schedule a quick zoom meeting in the next couple of days to discuss this topic specifically?
As most of the outstanding comments are somewhat insignificant, staff feels this project could be kept on the most up-to-date planning commission schedule. Revised plans reflecting the landscape comments could be re-submitted and additional discussion on the east elevation could happen that would give direction on the staff letter for the upcoming Planning Commission.
|
|
|
Traffic Review
|
No Comments
|
03/30/2021
|
03/30/2021
|
|
Mike Weisenborn
|
|
|
Fire Review
|
Approved with Conditions
|
03/30/2021
|
03/30/2021
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Imposed Loads
Corrective Action Required
IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
|
|
|
Engineering Review
|
Approved with Conditions
|
03/30/2021
|
03/28/2021
|
|
Gene Williams, P.E.
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
DE C&O #12 Cut & Fill
Corrective Action Required
Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
|
|
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
ADA-accessible ramp may require the dedication of additional right of way or a sidewalk easement. This will depend on the final design of the ADA-accessible ramp.
|
|
Corrective Action Required
An as-built and as-graded detention basin plan shall be submitted and accepted by the City prior to issuance of any occupancy permit.
|
|
|
Planning Review
|
Corrections
|
03/05/2021
|
03/05/2021
|
|
Jennifer Thompson
|
|
Corrective Action Required
A preliminary development has specific criteria for review. Please provide in narrative form responses to each of the 3 PDP criteria. The criteria can be found in the UDO, Article 2.260.C.
|
|
Corrective Action Required
This application does not require a special use permit due to the PMIX zoning district. However, certain conditions are in place for such facilities.
A climate controlled storage facility has a set of conditions. These can be found in the UDO, Article 6.1185 (there are 4 conditions), please respond in writing how this development does or does not meet these conditions.
Since this is a hybrid storage facility, the UDO has specific conditions for a self-storage type facility. These conditions can be found in the UDO, Article 6.1020 (there are four conditions), please respond in writing how this development does or does not meet these conditions.
Although photographs of the surrounding area is not required, it might be helpful to have to include in the staff packet going forward to illustrate a feel for this development area.
|
|
Corrective Action Required
A medium impact landscape buffer is required for the east property line/rear portion of the building. The landscaping requirements can be found in the UDO, Article 8.880.
|
|
Corrective Action Required
On Sheet C1.0, remove the note indicating a Special Use Permit within the overall site data table. With the PMIX zoning a SUP isn't required.
|
|
Corrective Action Required
A Form 7460 is required coordinated with the FAA.
|
|
Corrective Action Required
Label and provide the breakdown of the metal panel system for the sides and rear elevations, where proposed. Staff will recommend approval of 50% of approved material (brick as shown), and the metal panels for each of these given elevations. Can a metal sample board be provided?
Label the proposed colors for all exterior building materials.
|
|
Corrective Action Required
Revise the accessible sign detail to include a van accessible signage/reference.
|
|
Corrective Action Required
The building footprints on the landscape data table doesn't match the footprints on sheet C1.0 within the site data table.
|
|
Corrective Action Required
Provide a photometric site sheet.
|
|
|
Engineering Review
|
Corrections
|
03/05/2021
|
03/04/2021
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Please eliminate the steel casing pipe from the fire line.
|
|
Corrective Action Required
Please add an additional valve near the main connection point, on the fire line branch. The City always requires a valve on each side of the street for fire lines.
|
|
Corrective Action Required
A wye should already exist for this lot. Please check Record Drawings for location of sanitary sewer wyes and stubs. Contact our Records Technician at 816-969-1800 to request a "sanitary sewer stub location drawing" for this area. They will be able to provide this in pdf format via email.
|
|
Corrective Action Required
The new ADA-accessible ramp should be constructed with dedicated ramps rather than 45 degree entry ramps. As such, the right of way shown on the PDP appears too small for this type of ramp. Either a sidewalk easement or additional right of way would appear necessary, and can be dedicated by separate document. Please provide sufficient notation on the Preliminary Development Plan.
|
|
Corrective Action Required
Sidewalks and general location of the private ADA-accessible route across the driveway should be shown in accordance with Michael Park comments.
|
|
|
Fire Review
|
Corrections
|
03/05/2021
|
03/02/2021
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Hydrants
Corrective Action Required
IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
Action required: Provide a hydrant(s) to meet this requirement.
|
|
Misc.
Corrective Action Required
D104.1 Buildings exceeding three stories or 30 feet in
height. Buildings or facilities exceeding 30 feet (9144 mm) or three stories in height shall have not fewer than two means of fire apparatus access for each structure.
Action required: Provide the second access to the north. The access may be gated with Knox padlock.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Action required- Show the location of the FDC.
|
|
Knox Locks
IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official.
Action required- Knox key switches and padlocks shall be provided on the gates and a Kox box provided on the building
|
|
Imposed Loads
IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
|
|
|
Traffic Review
|
Corrections
|
03/05/2021
|
03/02/2021
|
|
Michael Park
|
|
Corrective Action Required
Sidewalk required along Port Dr. and Lakewood Way adjacent to subject property development.
|
|
|