Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
No Comments
|
03/02/2022
|
03/02/2022
|
|
Sue Pyles, P.E.
|
|
|
Engineering Review
|
Corrections
|
02/18/2022
|
02/18/2022
|
|
Sue Pyles, P.E.
|
|
|
Engineering Review
|
No Comments
|
03/18/2021
|
03/18/2021
|
|
Sue Pyles, P.E.
|
|
|
Engineering Review
|
Corrections
|
03/10/2021
|
03/10/2021
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
An ALTA survey is not an acceptable source for oil/gas well presence. Please reference MDNR database, Edward Alton May, Jr.'s study, or similar.
|
|
Corrective Action Required
Please include the map panel effective date in the FEMA note.
|
|
Corrective Action Required
Please remove "Future" from the storm sewer line labels and add "By Others" (or "By Separate Plans" or similar) to the sanitary sewer line label throughout the plan set.
|
|
Corrective Action Required
Revise the trench backfill detail to meet the City's requirement of 12" backfill over the top of the pipe and add the end section standard detail.
|
|
Corrective Action Required
Curb Inlets B-1 & B=2 are shown as 5x5 in Plan view and 5x3 in Profile view. There is an item for 5x5 on the estimate. Please revise where needed to match in all locations.
|
|
|
Engineering Review
|
Corrections
|
02/17/2021
|
02/17/2021
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
General:
• Submit an Engineer's Estimate of Probable Construction Costs.
• Show location of all oil/gas wells, or indicate none are present, and cite the source.
• Show and label the location and limits of the one percent annual chance flood, as set forth on the current FEMA maps, with reference to the panel number and effective date. Elevations shall be provided if shown on the FEMA map.
• Include the following note: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with an inspector prior to any land disturbance work at (816) 969-1200”.
• Please scale back future building and site elements throughout the plan set, as they are not included in this review.
• Please note that only mass grading and storm sewer are being reviewed at this time.
• Grading Note 9 references ADA slope requirements that are not a part of this review.
|
|
Corrective Action Required
The existing 991 contour line type at the NE portion of the site is still partially dashed and partially solid. Please revise.
|
|
Corrective Action Required
Please include a more robust erosion and sediment control. This is a very large amount of earthwork that has the potential to cause big erosion problems east and south of this lot. Include a phased plan that includes prior to, during, and post construction stages. Include storm structure protection for the
|
|
Corrective Action Required
Storm Sewer:
• The storm sewer design calls for curb inlets. These cannot be completed until the future development is done. Please provide an interim drainage solution.
• The drop thru Structures A-2 & A-3 don’t meet the City’s minimum drop requirement. Please revise.
• Please label A-1 in the Profile view.
• The proposed grade line does not tie into the existing grade line between Structures A-1 & A-2 in the Profile view. Please revise.
• The proposed grade line implies that the Line A grate inlets will be covered. Please revise.
• Include the design HGL in the storm sewer profiles. Removal of the hatching will make it easier to see.
• Include rip-rap construction dimensions and design information. Include shear stress calculations to show the rip-rap is adequate.
• Include storm sewer calculations in the plan set.
• Please include a trench backfill detail and end section standard detail.
|
|
|
Engineering Review
|
Corrections
|
11/02/2020
|
11/02/2020
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Clearly show and label the lot lines.
|
|
Corrective Action Required
Clearly show and label all proposed removals. This includes pavement, curb & gutter, storm sewer, sanitary sewer, retaining wall, etc.
|
|
Corrective Action Required
The existing 991 contour at the NE portion of the site appears to be a solid line rather than dashed. Please review and revise as needed.
|
|
Corrective Action Required
Clearly show and label how existing utilities will be adjusted, if needed.
|
|
Corrective Action Required
This needs to be a set of plans, not a single sheet, similar to other revisions you’ve done on this development.
|
|
Corrective Action Required
This will change the drainage pattern that was approved with the overall project. Please submit revisions to the approved storm study to match the proposed conditions as appropriate.
|
|
Corrective Action Required
Additional comments may be forthcoming based on the additional information being resubmitted.
|
|
Corrective Action Required
Submit an Engineer's Estimate of Probable Construction Costs.
|
|
|