Planning Application Status

PL2020298




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020298
LSR7 - LSW - 2020 ATHLETIC FIELD IMPROVEMENTS
Commercial Final Development Plan
Commercial Final Development Plan
Approved
10/05/2020
REORGANIZED SCHOOL DIST NO 7
Locations
Contacts
REORGANIZED SCHOOL DIST NO 7, Address:600 SE MILLER  
Not shown for privacy reasons.
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 01/21/2021 01/21/2021
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
01/21/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the 2 inch water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $32,873.05.
DE Contact Field Eng. Inspector
Corrective Action Required
02/08/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Future Repair Work
Corrective Action Required
02/08/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Misc.
Corrective Action Required
02/08/2021

A waiver to stormwater detention was issued by the City Engineer on Feb. 5, 2021 for the slight increase in impervious area.
Fire Review Approved with Conditions 01/21/2021 01/15/2021
Jim Eden
Code Statement
Informational
01/15/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code and local amendments.
Fire Lane Required
Resolved
01/15/2021

:IFC 503.1.1 - Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Exception: The fire code official is authorized to increase the dimension of 150 feet (45 720 mm) where: 1. The building is equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3. 2. Fire apparatus access roads cannot be installed because of location on property, topography, waterways, nonnegotiable grades or other similar conditions, and an approved alternative means of fire protection is provided. Action required: Provide fire department access to the concession/locker room building.
Fire Lanes
Resolved
01/15/2021

IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm).
Hydrants
Resolved
01/15/2021

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: How will this condition be met?
Building Codes Review No Comments 01/21/2021 01/15/2021
Joe Frogge
Traffic Review No Comments 01/21/2021 01/15/2021
Michael Park
Planning Review No Comments 01/21/2021 01/14/2021
Shannon McGuire
Engineering Review Corrections 11/11/2020 11/10/2020
Gene Williams, P.E.
Corrective Action Required
11/10/2020

A waiver to the Design and Construction Manual is required for the elimination of storwater detention. A template is being forwarded by separate email. Items to include in the waiver are:1) total existing impervious surface area, and 2) the total increase in impervious area as a percent. The City will support the waiver, but sufficient supporting justification such as these two items would be beneficial to discuss. It may also be beneficial to discuss the lack of existing stormwater detention, which was omitted due to the proximity to the floodplain as was the common practice at the time of construction of the high school.
Corrective Action Required
11/11/2020

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal. The estimate should include only those items reviewed or inspected by the engineering group. This would include all pavement, grading to establish proper drainage, stormwater lines and structures, water lines and valves, sanitary sewer lines and manholes and cleanouts, erosion and sediment control devices, final restoration including sodding, seeding, fertilizer, mulch, and topsoil.
Traffic Review No Comments 11/11/2020 11/09/2020
Michael Park
Planning Review Corrections 11/11/2020 11/09/2020
Shannon McGuire
Corrective Action Required
11/09/2020

Please provide a vicinity map with north arrow indicating the location of the property within the City.
Corrective Action Required
11/09/2020

Will there be new ground or roof top mounted mechanical equipment? If so please provide the manufacturer’s specification sheets for proposed mechanical equipment to be used. Please also show the location, size, and type of material to be used in all screening of ground mounted mechanical equipment.
Fire Review Corrections 11/11/2020 11/09/2020
Jim Eden
Code Statement
Corrective Action Required
11/09/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code and local amendments.
Fire Lane Required
Corrective Action Required
11/09/2020

:IFC 503.1.1 - Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Exception: The fire code official is authorized to increase the dimension of 150 feet (45 720 mm) where: 1. The building is equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3. 2. Fire apparatus access roads cannot be installed because of location on property, topography, waterways, nonnegotiable grades or other similar conditions, and an approved alternative means of fire protection is provided. Action required: Provide fire department access to the concession/locker room building.
Fire Lanes
Corrective Action Required
11/09/2020

IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm).
Hydrants
Corrective Action Required
11/09/2020

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: How will this condition be met?
Building Codes Review No Comments 11/11/2020 11/05/2020
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 02/17/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home