Planning Application Status

PL2020263




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020263
Paragon Star Village Private Water Main
Engineering Plan Review
Engineering Plan Review
Approved
08/31/2020
CITY OF LEES SUMMIT
Locations
Contacts
CITY OF LEES SUMMIT, Address:PO BOX 1600  
GBA ARCHITECTS ENGINEERS , Address:9801 RENNER BLVD, Phone:(913) 492-0400  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 09/29/2020 09/21/2020
Sue Pyles, P.E.
Engineering Review Corrections 09/15/2020 09/11/2020
Sue Pyles, P.E.
Corrective Action Required
09/10/2020

Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
09/10/2020

Please include Line E Plan & Profile.
Corrective Action Required
09/10/2020

Sheet 1: • Revise “The Village” to “Paragon Star – The Village” and “Water” to “Private Water” in the project title on the this sheet and in the title blocks on all sheets. • Please remove the City Engineer signature block, the City does not sign plans this way. • Kansas City Power & Light is now Evergy. Please update the Utility Contacts.
Corrective Action Required
09/10/2020

Sheet 2: • General Note 14 is incorrect. Either update or delete. • Include the CLOMR information with the FEMA note. • Delete the note about Class 205 pipe, as all pipe has been shown as Class 305. • Include the following note: “All construction shall follow the City of Lee’s Summit Design and Construction manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail.” • Show location of all oil/gas wells, or indicate none are present, and cite the source.
Corrective Action Required
09/10/2020

Sheets 3 & 4: • The Line A stationing shown at the Line D/Line A connections don’t match the Line A stationing shown on the approved set of public water line plans. Please revise the Plan & Profile views accordingly. • Please revise the 12” “Gate” Valve references in the Line D/Line A connection labels to 12” “Butterfly” Valve in both the Plan & Profile views. • Please label the valve type in the Line D Sta. 07+45.11 & Sta. 13+08.87 labels in Plan view.
Corrective Action Required
09/10/2020

Sheet 5: Details WAT-4 & WAT-6 are not used. Please delete.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home