Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
No Comments
|
11/30/2020
|
11/12/2020
|
|
Loic Nguinguiri, E.I.
|
|
|
Engineering Review
|
Corrections
|
11/05/2020
|
11/03/2020
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
The content of the SWPPP needs to match the proposed scope of work shown on the ESC set of plans. ESC protection measures such as silt fence, inlet protection and temporary construction entrance (and concrete washout) must be described. Please provide a brief physical description of the BMPs and BMPs installation/construction procedure(s). Make sure to also communicate how each will be maintained throughout the grading process.
|
|
|
Engineering Review
|
Corrections
|
10/08/2020
|
10/08/2020
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Please show an accurate vicinity map with surrounding streets labeled.
|
|
Corrective Action Required
Please make sure to add the oil/gas wells general note on to sheet 2, as mentioned in the previous response letter.
|
|
Corrective Action Required
In order to be more accurate about the existing conditions on-site, please label on to sheet 4 the MH and portion of existing sanitary line that are located within the land disturbance area. Also, the existing sanitary line leader by 27th street seems to be pointing at the wrong location. Please revise.
|
|
Corrective Action Required
Please add installation of inlet protections into phase 1 work schedule.
|
|
Corrective Action Required
While including temporary construction entrance hatching within the legend, please revise to match work schedule phases with ESC information located in the legend(s). Also, it seems like no inlet protections should be added after phase 2 work schedule since grading and seeding occur during that phase.
|
|
Corrective Action Required
Please include grading and concrete washout cost items on to the EOOPCC sheet. Also, make sure to revise the number of inlet protections and update the summary of quantities as well.
|
|
Corrective Action Required
Please provide a SWPPP and Missouri DNR permit along with the resubmittal, as previously requested.
|
|
Corrective Action Required
Please make sure to include a final restoration plan.
|
|
|
Engineering Review
|
Corrections
|
08/24/2020
|
08/24/2020
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Please include a cover sheet. The cover sheet must appear on top of the set of plans and must contain the following items:
o Project name (as headline)
o Vicinity map
o Developer’s contact information
o Design engineer’s contact information
o Design engineer’s signature and seal
o Table of contents
o Utility Contact information
|
|
Corrective Action Required
Please include a FEMA National Flood Hazard information note, on to the cover sheet.
|
|
Corrective Action Required
Show location of all oil/gas wells, or indicate none are present, and cite the source.
|
|
Corrective Action Required
Please make sure to include a note stating that “The contractor shall contact the City’s Development Services Engineering Inspectors 48 hours prior to any land disturbance work at (816) 969-1200”.
|
|
Corrective Action Required
Please make sure to include the Missouri One Call System 1-800-DIG-RITE “Call Before You Dig” information on to the cover sheet.
|
|
Corrective Action Required
Please make sure to include a note stating that all construction shall follow City of Lee’s Summit’s Design and Construction manual.
|
|
Corrective Action Required
Please clearly show all the surrounding utility lines. Feel free to thicken utility lines to improve visibility. Also, make sure to include a note that will raise construction workers awareness regarding the proximity of utility lines.
|
|
Corrective Action Required
While adding temporary construction entrance to the legend, please make sure to show (applicable) entrance(s) on plan view, as well.
|
|
Corrective Action Required
As shown in ESC-03, J-hooks are required within the land disturbance setup. Given the silt fence 100’ maximum runs for J-hooks, please locate the needed J-hooks on plan view.
|
|
Corrective Action Required
Which phase does installing inlet protection belong to? Please clarify/revise.
|
|
Corrective Action Required
In which phase are the silt fence barriers intended to be removed along with the inlet protections? Please clarify/revise.
|
|
Corrective Action Required
Please add extra silt fence along the western borderline in order to contain mud runoff within the land disturbance area, during heavy rain events.
|
|
Corrective Action Required
Please clarify/explain the meaning of the small circles located along the southern borderline of the land disturbance area.
|
|
Corrective Action Required
Make sure to update title block information before resubmitting.
|
|
Corrective Action Required
Please submit the (final) revised ESC set of plans in a multipage pdf format.
|
|
Corrective Action Required
Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet.
|
|
Corrective Action Required
Please indicate the total land disturbance area. If above 1 acre, please provide a SWPPP and MDNR permit along with the resubmittal.
|
|
|