Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
Approved with Conditions
|
06/11/2020
|
06/10/2020
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #07 Easements
Corrective Action Required
All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
|
|
|
Planning Review
|
Approved with Conditions
|
06/11/2020
|
06/09/2020
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Corrective Action Required
COMMON PROPERTY. Provide a copy of the subdivision's CC&Rs for review to ensure that they include the required language contained in UDO Section 4.290. The CC&Rs containing the required language shall be recorded at the time the plat is also recorded.
|
|
Miscellaneous Correction
Corrective Action Required
Please show a sidewalk along the entire Tract A frontage and along Lot 9.
|
|
Corrective Action Required
COMMON PROPERTY. Provide a copy of the subdivision's CC&Rs for review to ensure that they include the required language contained in UDO Section 4.290. The CC&Rs containing the required language shall be recorded at the time the plat is also recorded.
|
|
|
GIS Review
|
No Comments
|
06/11/2020
|
06/05/2020
|
|
Kathy Kraemer
|
|
|
Traffic Review
|
No Comments
|
06/12/2020
|
06/05/2020
|
|
Mike Weisenborn
|
|
|
Fire Review
|
No Comments
|
06/12/2020
|
06/05/2020
|
|
Mike Weisenborn
|
|
|
Planning Review
|
Corrections
|
06/03/2020
|
06/03/2020
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Ownership Affidavit. Please submit a signed ownership affidavit.
|
|
Miscellaneous Correction
Corrective Action Required
COMMON PROPERTY. Provide a copy of the subdivision's CC&Rs for review to ensure that they include the required language contained in UDO Section 4.290. The CC&Rs containing the required language shall be recorded at the time the plat is also recorded.
|
|
Miscellaneous Correction
Corrective Action Required
Please show a sidewalk along the entire Tract A frontage and along Lot 9.
|
|
|
Traffic Review
|
No Comments
|
06/03/2020
|
06/02/2020
|
|
Michael Park
|
|
|
Engineering Review
|
Approved with Conditions
|
06/03/2020
|
06/01/2020
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #07 Easements
Corrective Action Required
All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
|
|
|
GIS Review
|
Approved with Conditions
|
06/03/2020
|
05/29/2020
|
|
Kathy Kraemer
|
|
Corrective Action Required
What is the bearing on the east side of Tract B?
|
|
|
Fire Review
|
No Comments
|
06/03/2020
|
05/29/2020
|
|
Jim Eden
|
|
Corrective Action Required
|
|
|
Planning Review
|
Corrections
|
05/06/2020
|
05/06/2020
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Corrective Action Required
Ownership Affidavit. Please submit a signed ownership affidavit.
|
|
Miscellaneous Correction
Corrective Action Required
COMMON PROPERTY. Provide a copy of the subdivision's CC&Rs for review to ensure that they include the required language contained in UDO Section 4.290. The CC&Rs containing the required language shall be recorded at the time the plat is also recorded.
|
|
|
Traffic Review
|
No Comments
|
05/06/2020
|
05/06/2020
|
|
Michael Park
|
|
|
Engineering Review
|
Approved with Conditions
|
05/06/2020
|
05/05/2020
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #07 Easements
Corrective Action Required
All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
|
|
|
GIS Review
|
Corrections
|
05/06/2020
|
05/01/2020
|
|
Kathy Kraemer
|
|
Corrective Action Required
Plat does not close. Misclosure X: 7.291
Misclosure Y: 1.347
|
|
Corrective Action Required
There is something off about the coordinates of this plat. Points 1-10 hit right where they are supposed to, but 11-17 are consistently 7 feet to the east. Considering the misclosure on the X axis 7 ft, is there something amiss on the curve of Chapel Ridge Place?
|
|
|