Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
Approved with Conditions
|
07/21/2020
|
07/15/2020
|
|
Loic Nguinguiri, E.I.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $5,506.54
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Please contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
|
|
|
Planning Review
|
No Comments
|
07/21/2020
|
07/14/2020
|
|
Mike Weisenborn
|
|
|
Traffic Review
|
No Comments
|
07/21/2020
|
07/14/2020
|
|
Mike Weisenborn
|
|
|
Building Codes Review
|
No Comments
|
07/21/2020
|
07/14/2020
|
|
Mike Weisenborn
|
|
|
Fire Review
|
Approved with Conditions
|
07/21/2020
|
07/14/2020
|
|
Mike Weisenborn
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Misc.
Corrective Action Required
As the fire area of the building is greater than 12,000 square feet, the building shall be provided with an automatic fire sprinkler system or divided into fire areas in accordance with Chapter 7 of the 2018 IBC.
|
|
|
Fire Review
|
Approved with Conditions
|
07/14/2020
|
07/13/2020
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Misc.
Corrective Action Required
As the fire area of the building is greater than 12,000 square feet, the building shall be provided with an automatic fire sprinkler system or divided into fire areas in accordance with Chapter 7 of the 2018 IBC.
|
|
|
Planning Review
|
No Comments
|
07/14/2020
|
07/13/2020
|
|
Hector Soto Jr.
|
|
|
Engineering Review
|
Corrections
|
07/14/2020
|
07/10/2020
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
The estimate includes both 6” concrete and 8” aggregate base combined together as a single item. In reviewing the previously submitted site plan, these areas of concrete and of aggregate are not clearly delineated. Please revise the site plan to clarify where each type of surface will be constructed. Revise the estimate to separate those two surface types. Please ensure that the quantity of each that is shown on the revised estimate can be verified from the revised site plan.
|
|
Corrective Action Required
Please remove the striping cost item from the engineering cost estimate since the work will be performed on a private property.
|
|
Corrective Action Required
The City does not request water meter related costs to be included into the EOOPCC sheet. Therefore, please dissociate to only show water service line and water main tap related expenses as applicable.
|
|
|
Building Codes Review
|
No Comments
|
07/14/2020
|
07/07/2020
|
|
Mike Weisenborn
|
|
|
Traffic Review
|
No Comments
|
07/14/2020
|
07/07/2020
|
|
Mike Weisenborn
|
|
|
Fire Review
|
Corrections
|
05/22/2020
|
05/22/2020
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Misc.
Corrective Action Required
As the fire area of the building is greater than 12,000 square feet, the building shall be provided with an automatic fire sprinkler system or divided into fire areas in accordance with Chapter 7 of the 2018 IBC.
|
|
|
Planning Review
|
Corrections
|
05/22/2020
|
05/22/2020
|
|
Hector Soto Jr.
|
|
Corrective Action Required
LIGHT FIXTURES. Cut sheets for all exterior wall pack light fixtures shall be provided for review. The light fixtures shall have full 90-degree cutoffs to direct the light downward and so the light source is not visible from off the property.
|
|
Corrective Action Required
APPLICATION. The application provided did not include the signature of the property owner. An application signed by the property owner is required to be submitted.
|
|
|
Engineering Review
|
Corrections
|
05/22/2020
|
05/22/2020
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
An itemized and sealed Engineer's Opinion Of Probable Construction Costs has not been provided. The Final Development Plan’s engineering review fee and the inspection fee are based on this estimate, and calculated at 3% of the total. Items to include in the estimate include: 1) grading to establish proper drainage, 2) grading for parking, 3) removal and replacement of poor quality subgrade (estimated quantity), 4) water and sanitary utility items, 5) pavement, 6) erosion and sediment control, 7) final restoration, including sodding, seeding, fertilizer, mulch, and topsoil.
|
|
|
Building Codes Review
|
No Comments
|
05/22/2020
|
05/20/2020
|
|
Joe Frogge
|
|
Miscellaneous Correction
Provide the following:
- Sewer pipe material.
- Water pipe material.
- Screening for ground mounted hvac equipment.
5/20/20 - pipe materials covered in MEP designs - screening not required at airport
|
|
|
Traffic Review
|
No Comments
|
05/22/2020
|
05/18/2020
|
|
Mike Weisenborn
|
|
|
Traffic Review
|
No Comments
|
05/05/2020
|
05/05/2020
|
|
Mike Weisenborn
|
|
|
Planning Review
|
Corrections
|
05/05/2020
|
05/05/2020
|
|
Hector Soto Jr.
|
|
Corrective Action Required
BUILDING ELEVATIONS. The elevations submitted are not clear and the notes are difficult to read. Provide revised elevations that identify all exterior building materials, colors and light fixtures.
|
|
Corrective Action Required
LIGHT FIXTURES. Cut sheets for all exterior wall pack light fixtures shall be provided for review. The light fixtures shall have full 90-degree cutoffs to direct the light downward and so the light source is not visible from off the property.
|
|
Corrective Action Required
APPLICATION. The application provided did not include the signature of the property owner. An application signed by the property owner is required to be submitted.
|
|
Corrective Action Required
ACCESSIBLE PARKING SPACE. Revise the note regarding the mounting height of the sign to a minimum of 5' above grade, measured to the bottom of the sign.
|
|
Corrective Action Required
VICINITY MAP. Add a vicinity map to provide more context to the hangar site within the airport and surrounding area at large.
|
|
Corrective Action Required
SODDING. All disturbed areas surrounding the hangar shall be sodded.
|
|
Corrective Action Required
PARKING SPACES. Dimension the parking spaces. The spaces shall be a minimum 9' x 19'.
|
|
|
Fire Review
|
Corrections
|
05/05/2020
|
04/28/2020
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Misc.
Corrective Action Required
The dimensions on the drawings on are difficult to read. What is the total square footage, including the second floor.? S1 occupancies greater than 12,000 are required to be sprinklered or provided with rated barriers per IBC to reduce the fire area to less than 12,000sq. ft.
|
|
|
Engineering Review
|
Corrections
|
05/05/2020
|
04/28/2020
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
An itemized and sealed Engineer's Opinion Of Probable Construction Costs has not been provided. The Final Development Plan’s engineering review fee and the inspection fee are based on this estimate, and calculated at 3% of the total. Items to include in the estimate include: 1) grading to establish proper drainage, 2) grading for parking, 3) removal and replacement of poor quality subgrade (estimated quantity), 4) water and sanitary utility items, 5) pavement, 6) erosion and sediment control, 7) final restoration, including sodding, seeding, fertilizer, mulch, and topsoil.
|
|
|
Building Codes Review
|
Corrections
|
05/05/2020
|
04/27/2020
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
Provide the following:
- Sewer pipe material.
- Water pipe material.
- Screening for ground mounted hvac equipment.
|
|
|