Review Type |
Outcome |
Est. Completion Date |
Completed |
Record Drawings Review
|
Corrections
|
11/28/2022
|
11/22/2022
|
|
Sue Pyles, P.E.
|
|
The Townhomes of Chapel Ridge 2nd Plat - Public Sanitary
|
Engineering Review
|
Corrections
|
08/27/2021
|
09/07/2021
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
The City requirements of drop through a structure at MH A-1 and slope of sewer main between MHs B-1 & B-2 are not being met. Please provide an explanation for these reductions and propose a resolution.
|
|
Corrective Action Required
Please revise the Engineer’s Certification to include all required as previously provided. Be sure to cross out the appropriate option at the end of the certification’s first sentence to identify how the information was obtained.
|
|
|
Engineering Review
|
No Comments
|
06/03/2020
|
06/03/2020
|
|
Sue Pyles, P.E.
|
|
|
Engineering Review
|
Corrections
|
05/15/2020
|
05/12/2020
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Please revise the off-site sanitary easement to a minimum of 2 feet wide for every foot of trench depth as required by Design and Construction Manual Section 6501.L.c. Submit a draft version of this easement for review. The easement will need to be recorded prior to issuance of Substantial Completion for the project.
|
|
Corrective Action Required
Revise the Total Cost, it appears that the last two items aren't included. When resubmitting, make sure the estimate is signed/sealed.
|
|
|
Engineering Review
|
Corrections
|
05/06/2020
|
05/04/2020
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
General:
• Revise the project name to match the Townhomes plat name in the project title on the cover sheet and in the title block on each sheet.
• Show and label the proposed easement outside of the plat boundary throughout the plan set. Submit a draft of the off-site easement for review. The easement will need to be recorded prior to issuance of Substantial Completion of the project.
|
|
Corrective Action Required
Sheet C.400:
• Include a Summary of Quantities table.
• Include a vicinity map that shows and labels nearby streets.
• Include FEMA and Oil/Gas Well notes.
• Remove the approval signature block for the City. A stamp will be provided electronically when approved.
|
|
Corrective Action Required
Sheets C.402-C.403:
• Revise the compacted fill hatching extend to an elevation 18” above the top of the pipe, and only in areas where existing grade is not a minimum of 18” above the top of the pipe. Line A does not have any areas that will require compacted fill.
• The Line B Sewer Stub Table references the wrong lots. Please revise.
|
|
Corrective Action Required
Estimate: Add an item for the 2 proposed connections to the existing sanitary sewer. Please sign/seal the revised estimate.
|
|
|
Engineering Review
|
Corrections
|
04/24/2020
|
04/21/2020
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Sheet C.400:
• KCP&L is now Evergy. Please update the plan set.
• Sanitary Sewer Note 6 indicates that 3’ of compacted fill be placed prior to trenching. This exceeds the 18” required by the City, which is fine. I just wanted to point it out.
|
|
Corrective Action Required
Sheet C.401: Revise the line weight of the existing water main that will be removed, to match other existing infrastructure.
|
|
Corrective Action Required
Sheet C.402: Revise the Line A proposed MHs so that the top elevations matches the proposed grade.
|
|
Corrective Action Required
Sheet C.403:
• Include the following note: “Compacted Fill shall be placed to a minimum X” above the top of the pipe prior to installation.” Revise “X” to match Sanitary Sewer Note 6 on Sheet C.400.
• Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity.
|
|
Corrective Action Required
Submit an Engineer's Estimate of Probable Construction Costs.
|
|
|