Planning Application Status

PL2019415




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019415
Lots 1-6, Main Orchard
Final Plat
Final Plat
Recorded
12/12/2019
FIVE THIRTY LLC
Locations
Contacts
FIVE THIRTY LLC, Address:50 SE 30TH ST  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 03/03/2020 03/24/2020
Joshua Johnson
Fire Review No Comments 03/01/2020 03/02/2020
Mike Weisenborn
Engineering Review No Comments 03/03/2020 02/27/2020
Gene Williams, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
02/25/2020

Please add a note concerning stormwater detention being provided for each lot, in accordance with the Master Drainage Plan. Ongoing maintenance and ownership should also be described in this note.
DE C&O #02 Master Drainage Plan
Corrective Action Required
02/25/2020

Please show a general outline of the location of each detention basin on the plat. A note may be added which references the approved Master Drainage Plan, and discussing the need to construct during the building permit process.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
02/25/2020

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #04 Cert FA or Escrow
Corrective Action Required
02/25/2020

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
Traffic Review No Comments 03/01/2020 02/26/2020
Michael Park
Planning Review Corrections 01/30/2020 01/31/2020
Jennifer Thompson
Legal Description
Corrective Action Required
01/31/2020

Please submit an electronic copy of the legal description in Microsoft Word document.
Corrective Action Required
01/31/2020

Provide the single-family residential compatibility form.
Corrective Action Required
01/31/2020

Label the addresses as follows: Lot 1: 518 NW Main St. Lot 2: 514 NW Main St. Lot 3: 510 NW Main St.--existing Lot 4: 508 NW Main St. Lot 5: 504 NW Main St. Lot 6: 500 NW Main St.
Engineering Review Approved with Conditions 01/30/2020 01/30/2020
Gene Williams, P.E.
Corrective Action Required
01/29/2020

Please add a note concerning stormwater detention being provided for each lot, in accordance with the Master Drainage Plan. Ongoing maintenance and ownership should also be described in this note.
Corrective Action Required
01/29/2020

Please show a general outline of the location of each detention basin on the plat. A note may be added which references the approved Master Drainage Plan, and discussing the need to construct during the building permit process.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
01/29/2020

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
02/06/2020

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
02/06/2020

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
02/06/2020

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO). If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #08 Changes to MDP
Corrective Action Required
02/06/2020

A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
Fire Review No Comments 01/30/2020 01/29/2020
Jim Eden
Traffic Review No Comments 01/28/2020 01/28/2020
Michael Park
Traffic Review Corrections 12/27/2019 12/30/2019
Michael Park
Corrective Action Required
12/30/2019

Provide a note regarding limits of no access to Orchard for Lot 6.
Planning Review Corrections 12/27/2019 12/30/2019
Mike Weisenborn
Legal Description
Corrective Action Required
12/20/2019

Please submit an electronic copy of the legal description. Microsoft Word document or selectable text PDF are the preferred file formats. The legal description can be emailed to the planner's email address above.
Corrective Action Required
12/20/2019

Provide the single-family residential compatibility form.
Corrective Action Required
12/20/2019

Remove Vincent E. Brice's name from the GIS title block. Jackson County prefers it doesn't reference a specific person.
Corrective Action Required
12/20/2019

Label the varying widths of the sanitary sewer easement within Lot 1.
Corrective Action Required
12/30/2019

In the sidewalk paragraph reference the NW and NE orientation for Orchard St and Main St, respectively.
Corrective Action Required
12/30/2019

Addresses will be forthcoming.
Corrective Action Required
12/30/2019

See engineering comment regarding the sidewalk comment.
Engineering Review Corrections 12/27/2019 12/26/2019
Gene Williams, P.E.
Corrective Action Required
12/26/2019

An existing sidewalk is shown to the north, but we are not showing the existence of any sidewalk in this area. Please verify.
Corrective Action Required
12/26/2019

Note 8 is not applicable. It was our understanding that a property owner's association was not being formed, and that the individual detention pits were going to be maintained by the individual lot owners.
Fire Review No Comments 12/27/2019 12/17/2019
Jim Eden
GIS Review No Comments 12/27/2019 12/12/2019
Kathy Kraemer
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Plat fee $718.00 $718.00 Paid 12/18/2019
9110026-Plat Security Escrow $570.00 $570.00 Paid 04/06/2020
7223003-83423072 Sidewalk Deposit in Lieu NW Quadrant $5,700.00 $5,700.00 Paid 07/27/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 02/13/2020 05:00 PM Council Chambers 02/13/2020 05:00 PM
Public Hearing Review
Approved
02/13/2020
City Council Ordinance 1st Reading 03/03/2020 06:15 PM Council Chambers 03/03/2020 06:15 PM
Public Hearing Review
Complete
Documents & Images
Date Uploaded File Type Document Name
12/12/2019 Letter Routing Sheet
12/12/2019 Receipt Receipt for transaction: 2019-007697
12/12/2019 Plans FINAL PLAT
12/18/2019 Receipt Receipt for transaction: 2019-007757
12/30/2019 Letter Applicant Letter - FP (DRCF)
12/31/2019 Letter Applicant Letter - FP (DRCF)
01/23/2020 Letter Resubmittal Routing Sheet
01/23/2020 Plans LETTER OF TRANSMITTAL
01/23/2020 Plans MAIN ORCHARD FINAL PLAT
01/23/2020 Plans FINAL PLAT BOUNDARY DESCRIPTION
01/31/2020 Letter Applicant Letter - FP (DRCF)
02/06/2020 Letter Single-Family Compatibility Form
02/25/2020 Plans MAIN ORCHARD FINAL PLAT
02/25/2020 Plans COMMENT RESPONSE LTR
02/25/2020 Plans FINAL PLAT BOUNDARY DESCRIPTION
02/25/2020 Letter Resubmittal Routing Sheet
04/06/2020 Activity Document SKM_C36820040609450
04/06/2020 Receipt Receipt for transaction:2020-001403
05/01/2020 ORDINANCE 2020E0035479
05/01/2020 Plans MAIN ORCHARD FINAL PLAT 2020E0035480
05/01/2020 COVER PAGE PLAT 2020E0035480
07/27/2020 Receipt Receipt for transaction:2020-004713
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home