Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
Approved with Conditions
|
02/03/2020
|
02/03/2020
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Plans are stamped as "Not for Construction". We will need signed and sealed plans that do not include this statement.
|
|
Corrective Action Required
The off-site private easement shall be submitted prior to formal approval of the plans.
|
|
Corrective Action Required
A five (5) foot general utility easement should be dedicated along the entire west side of the lot. This should be dedicated on the Minor Plat.
|
|
Corrective Action Required
The Engineer's Estimate was missing a seal and signature.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineering Plan Review and Inspection Fee has been calculated, which is 3% of the total infrastructure cost. This must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $11,158.19
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Contact Field Engineering Inspections at (816) 969-1200 at least 48 hours prior to the onset of construction.
|
|
DE Contact ROW Inspector
Corrective Action Required
Prior to any activities within the right-of-way that are not directly associated with a specific infrastructure or building permit, a separate right-of-way permit may be required. Contact a Right-of-Way Inspector at (816) 969-1800 to obtain the required permit.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
DE C&O #12 Cut & Fill
Corrective Action Required
Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
|
|
|
Building Codes Review
|
No Comments
|
02/03/2020
|
01/30/2020
|
|
Joe Frogge
|
|
|
Fire Review
|
Approved with Conditions
|
02/03/2020
|
01/30/2020
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Traffic Review
|
No Comments
|
02/03/2020
|
01/30/2020
|
|
Michael Park
|
|
Miscellaneous Correction
Corrective Action Required
Consider revisions to the CG-1 curbed island near the menu board to allow for an escape from the drive thru queue (e.g. a CG-2 curb in this area so that its traversible).
|
|
|
Planning Review
|
Approved with Conditions
|
02/03/2020
|
01/30/2020
|
|
Hector Soto Jr.
|
|
Corrective Action Required
PLATTING. The related minor plat application is currently in the review/approval process. No building permit shall be issued on this final development plan until such time as the plat is approved, recorded and the necessary copies of the recorded plat are returned to the Development Services Department. This comment is for informational purposes only.
|
|
|
Planning Review
|
Corrections
|
12/18/2019
|
12/18/2019
|
|
Hector Soto Jr.
|
|
Corrective Action Required
PLATTING. The subject property is required to be replatted prior to issuance of a building permit. The property may be replatted via a minor plat application. The approval process for a minor plat mirrors that of the final development plan, meaning it is reviewed and approved at the staff level (i.e. no Planning Commission or City Council approval is required). The minor plat application is available on the City's website.
|
|
Corrective Action Required
CURBING. The parking lot is required to have a boundary constructed of CG-1 curbing. The plan details show C-1 curbing. Please revise.
|
|
Corrective Action Required
FLOODPLAIN. Add a note to the plans regarding the site's location relative to the 100-year floodplain. Cite the FIRM Panel number and date as the source of the information.
|
|
Corrective Action Required
OIL AND GAS WELLS. Add a note to the plans regarding the presence of any active, inactive or capped oil and/or gas wells on the site. The Missouri Department of Natural Resources has an online database for all permitted wells, which can be cited as the source of information.
|
|
Corrective Action Required
ADA PARKING SIGN. Revise the detail on Sheet C7 to indicate that the minimum mounting height of the sign shall be 5' above grade, measured to the bottom of the sign.
|
|
Corrective Action Required
LIGHTING. Provide manufacturer specification for the proposed wallpack light fixtures. Wallpacks shall comply with the requirements of UDO Section 8.260.
|
|
|
Traffic Review
|
Corrections
|
12/18/2019
|
12/18/2019
|
|
Michael Park
|
|
Miscellaneous Correction
Corrective Action Required
Consider revisions to the CG-1 curbed island near the menu board to allow for an escape from the drive thru queue (e.g. a CG-2 curb in this area so that its traversible).
|
|
|
Building Codes Review
|
No Comments
|
12/18/2019
|
12/18/2019
|
|
Mike Weisenborn
|
|
|
Engineering Review
|
Corrections
|
12/18/2019
|
12/18/2019
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Please provide a legible vicinity map on the cover sheet, showing a general location of the project. The vicinity map shown on Sheet C2 is illegible, and should be shown on the cover sheet.
|
|
Corrective Action Required
An index should be provided on the cover sheet, which describes the sheet numbers.
|
|
Corrective Action Required
Please include the contact information for utility companies.
|
|
Corrective Action Required
A note should be provided stating that all construction shall follow the City of Lee's Summit Design and Construction Manual.
|
|
Corrective Action Required
A legend is provided, but includes "fence" as one of the items to be constructed. Are there any fences to be constructed as part of this project? If not, wouldn't it be better to remove this item from the legend?
|
|
Corrective Action Required
Water meters for domestic service and irrigation service will need to be removed and replaced with new meters. Please provide notation on the plans stating these items will be removed and replaced with new meters. In addition, the service line from the water main to the meters will need to be replaced for the domestic service line and the irrigation line. Please provide notes stating these lines shall be removed and replaced.
|
|
Corrective Action Required
The plans call-out 1.5 inch HDPE line from the meter to the building. The City of Lee's Summit requires a minimum of ten (10) feet of soft copper beyond the meter, as shown on the City of Lee's Summit standard drawing for water meters. At that point (i.e., 10 feet beyond the meter), it is acceptable to use different material. Please see the City of Lee's Summit standard detail for water meter connection for details concerning this requirement.
|
|
Corrective Action Required
Please call-out the water meter sizes for both the domestic water meter and the irrigation meter. Please specify the diameter of the soft copper line from the water main to the meter. Please be aware the City will only allow a domestic water line diameter from the main to the water meter of the following sizes: 1) 3/4", 2) 1", or 3) 2".
|
|
Corrective Action Required
It appears the standard detail for a water meter was missing from the plans.
|
|
Corrective Action Required
It appears the existing sanitary sewer lateral should be replaced all the way to the wye, and including the wye connection. Please add appropriate notation stating this shall be done.
|
|
Corrective Action Required
Formal approval of the Final Development Plan shall be contingent upon the receipt of an executed and recorded private easement (with a graphical representation of the easement in the form of an 8.5" by 11" exhibit) from the owner of the lot to the south. Prior to execution and recording of this document, the City will need to perform a courtesy review of the document, and exhibit, to determine if the easement is suitable. Following a courtesy review, the easement should be executed and recorded at the Jackson County Recorder of Deeds.
|
|
Corrective Action Required
Proper abandonment of the existing sanitary sewer lateral must follow the City of Lee's Summit Design and Construction Manual. Please add notes to the plans as appropriate.
|
|
Corrective Action Required
Due to the overall excessive length of the new sanitary sewer lateral, a profile view should also be provided.
|
|
Corrective Action Required
Sheet C7: The asphalt paving section appears a bit confusing in terms of geogrid. We recommend underlining the word "geogrid" so there is no confusion on the part of the contractor.
|
|
Corrective Action Required
Sheet C7: The above-referenced subgrade must extend a minimum of one (1) foot beyond the back of curb. The curb and gutter section, therefore, is incorrect. Please see additional comments below, however, because it appears the incorrect curb and gutter section is being called-out.
|
|
Corrective Action Required
The entrance at SE 7th Terr. must be constructed of 8" KCMMB concrete from the right of way line, to the sawcut. Asphaltic concrete is shown. A 1.5% cross-slope area across the driveway must be constructed, with a minimum width of 5 feet to accommodate an ADA-accessible ramp. Details must be provided showing how this will be constructed.
|
|
Corrective Action Required
Sheet C2: Where is the water main along the west side of the property? It appears to be absent from the drawing. It appears the new monument sign is directly on top of the water main, which is not allowed. In addition, it appears there is a parking lot light within five (5) feet of the water main. In general, a minimum of ten (10) feet is required between lighting poles, monument signs,
|
|
Corrective Action Required
Sheet C7: Is there a public easement for the water line along the west side of the project? If not, an easement should be dedicated by separate document, in a form acceptable to the City.
|
|
Corrective Action Required
Please coordinate all activities within MoDOT right of way by obtaining a permit from MoDOT. This would include any work to re-construct the entrance along the southwest side of the project.
|
|
Corrective Action Required
Sheet C4: The new sanitary sewer lateral shown within the new private easement does not include any information regarding the repair of the existing pavement and/or restoration to the west of the new sanitary sewer lateral. Please provide details concerning the repair of this area.
|
|
Corrective Action Required
Sheet C7: An ADA-accessible ramp detail is provided, but no ADA-accessible ramps are shown on the plans. In addition, no sidewalk is required for this project. Please remove the detail from the plans.
|
|
Corrective Action Required
The curb and gutter section called-out on the plan sheet C2 appears to reference a non-standard design that is not allowed in the City of Lee's Summit. The City of Lee's Summit requires the use of CG-1 high-back curb and gutter with integral gutter, rather than the straight slab design as shown.
|
|
Corrective Action Required
The City of Lee's Summit standard detail for the sanitary wye connection, tracer wire, and trench check was missing from the plans. Please include this detail in the resubmittal.
|
|
Corrective Action Required
An Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and calculated at 3% of the total sitework, plus a right of way inspection fee of $80. This estimate should include: 1) sanitary sewer lateral and wye, 2) sanitary sewer lateral removal and abandonment, 3) water lines, 4) pavement, 5) aggregate base for pavement, including the area one (1) foot beyond the back of curb, 6) chemically-stabilized subgrade or geogrid, including the area one (1) foot beyond the back of curb, 7) curb and gutter, 8) sidewalks, 9) ADA-accessible ramps, 10) commercial entrances, 11) grading and compaction of parking area, 12) erosion and sediment control devices and measures, and 13) final restoration, including sodding, seeding, fertilizer, mulch, and topsoil.
|
|
|
Fire Review
|
Approved with Conditions
|
12/18/2019
|
12/06/2019
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|