Planning Application Status

PL2019353




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019353
THE VILLAS OF CHAPEL RIDGE 2ND PLAT
Preliminary Plat
Preliminary Plat
Approved
10/11/2019
CHAPEL RIDGE RESIDENTIAL LLC
Locations
Contacts
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
CHAPEL RIDGE RESIDENTIAL LLC, Address:3170 NE CARNEGIE DR #400  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 11/19/2019 11/20/2019
Gene Williams, P.E.
Corrective Action Required
11/19/2019

A sidewalk connection to the existing sidewalk on Dick Howser Dr. shall be completed.
Corrective Action Required
11/20/2019

The water main shall be connected to the existing water main along Dick Howser Dr.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
11/20/2019

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
11/20/2019

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
11/20/2019

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
11/20/2019

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO). If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
11/20/2019

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
11/20/2019

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
11/20/2019

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
DE C&O #08 Changes to MDP
Corrective Action Required
11/20/2019

A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
DE C&O #12 Cut & Fill
Corrective Action Required
11/20/2019

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
11/20/2019

All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
DE C&O #14 Common Area Sidewalks
Corrective Action Required
11/20/2019

All sidewalks adjacent to a common area tract, unplatted land or any land where no structure is intended to be built, and is required, shall be constructed by the developer at the time the street is constructed.
Fire Review No Comments 11/19/2019 11/19/2019
Mike Weisenborn
Traffic Review No Comments 11/19/2019 11/19/2019
Mike Weisenborn
Planning Review No Comments 11/19/2019 11/15/2019
Victoria Nelson
Traffic Review No Comments 10/25/2019 10/28/2019
Michael Park
Engineering Review Corrections 10/25/2019 10/25/2019
Gene Williams, P.E.
Corrective Action Required
10/25/2019

Proposed grading was not shown. Was a grading plan prepared? If so, we did not receive it.
Corrective Action Required
10/25/2019

The water line connection at Dick Howser appears to have been omitted.
Corrective Action Required
10/25/2019

The intersection of Dick Howser Dr. and Independence Ave. is too steep. It appears to be nearly 20% grade. Please see previous comment related to the lack of a grading plan. This plan should show the proposed grading for the new intersection.
Corrective Action Required
10/25/2019

A stormwater memorandum is required, which discusses the existing detention basin and its ability to capture stormwater runoff from this project.
Corrective Action Required
10/25/2019

Please show all easements. A minimum 10 foot easement is required along all street frontage.
Corrective Action Required
10/25/2019

Sidewalk connection was not shown to the north, to connect to the existing sidewalk on Dick Howser Dr.
Planning Review Corrections 10/25/2019 10/25/2019
Victoria Nelson
Corrective Action Required
10/23/2019

Please label and show all utility easements
Corrective Action Required
10/23/2019

Please show all proposed utilities in legend
Fire Review No Comments 10/25/2019 10/14/2019
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
Preliminary Plat fee $802.00 $802.00 Paid 10/14/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 12/12/2019 05:00 PM Council Chambers 12/12/2019 05:00 PM
Public Hearing Review
Approved
12/12/2019
Documents & Images
Date Uploaded File Type Document Name
10/11/2019 2ND plat
10/11/2019 PDP C.100-PRELIMINARY PLAT C.102
10/11/2019 Letter Routing Sheet
10/14/2019 Receipt Receipt for transaction: 2019-006768
10/25/2019 Letter Applicant Letter - PP (PP)
11/12/2019 PDP C.100-PRELIMINARY PLAT C.102
11/12/2019 Letter Resubmittal Routing Sheet
11/12/2019 Plans C.200
11/12/2019 Plans C.300
11/12/2019 Plans Drainage Study 191112
11/12/2019 Plans MEETING MINUTES 11-12-19
11/12/2019 Plans C.100
11/12/2019 Plans C.101
11/12/2019 Letter Resubmittal Routing Sheet
11/19/2019 Letter Applicant Letter - PP (PP)
12/05/2019 PL2019353 The Villas of Chapel Ridge TIA
12/06/2019 Drawing C.102
12/06/2019 Letter PL2019-353 PP Villas of Chapel Ridge 2nd
12/06/2019 Drawing Location Map
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home