PARAGON STAR - PUBLIC OFF-SITE WATER MAIN EXTENSION
Engineering Plan Review
Engineering Plan Review
Approved
09/27/2019
HAPPY VALLEY PROPERTIES LLC
Locations
Contacts
HAPPY VALLEY PROPERTIES LLC, Address:801 NW COMMERCE DR  
GBA ARCHITECTS ENGINEERS , Address:9801 RENNER BLVD, Phone:(913) 492-0400  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 07/13/2020 07/13/2020
Sue Pyles, P.E.
Engineering Review Corrections 06/19/2020 06/19/2020
Sue Pyles, P.E.
Corrective Action Required
06/19/2020

Butterfly valves are required for all water mains 12” or larger. Please revise gate valves to butterfly valves. The contractor will need to bevel the inside edge of the pipe connecting to the butterfly valve. Add a note requiring certification be provided to the Field Engineering Inspector upon delivery that the butterfly valves have passed a 192.5 psi test.
Corrective Action Required
06/19/2020

Include thrust blocks at plugged valves near tees.
Corrective Action Required
06/19/2020

Using 150% of normal operating pressure at the low point to test the new water main, the test pressure could be 200 psi for the DR 18 pipe and 271 psi for the DR 14 pipe which is within the pressure class of each pipe but is a lot of pressure. Testing the DR 18 and the DR 14 pipe together will place about 224 psi pressure on the low point of the DR 18 pipe.
Corrective Action Required
06/19/2020

Sheet 1: Update the Summary of Quantities table to match any revisions.
Corrective Action Required
06/19/2020

Sheet 2: General Note 11 references incorrect specifications. Please revise the section numbers as needed.
Corrective Action Required
06/19/2020

Sheets 4 & 5: The FH stationing shown on the Plan and Profile views don’t match for the FHs near Sta. 27+48 and Sta. 30+79. Please revise.
Corrective Action Required
06/19/2020

Sheet 6: • The air relief assembly at Sta. 45+25 is supposed to have a brass saddle according the detail on sheet 9. Some brass saddles do not have the pressure rating for this location. For example, the Ford S90 saddle has a working pressure rating of 150 psi. A different type of saddle might be considered at this location. • There is still a “15’ Water Main easement” label near Sta. 38+00. Please revise.
Corrective Action Required
06/19/2020

Sheet 7: Include proposed grade. Verify that standard cover requirements are being met.
Corrective Action Required
06/19/2020

Revise the estimate to match any revisions.
Engineering Review Corrections 06/01/2020 06/01/2020
Sue Pyles, P.E.
Corrective Action Required
06/01/2020

General: The plans are now very clear regarding vertical deflections. Horizontal deflections must meet the same tolerance and don’t appear to show how this requirement is being met. Please clarify.
Corrective Action Required
06/01/2020

Sheet 1: Update the Summary of Quantities Table based on comments.
Corrective Action Required
06/01/2020

Sheet 3: • The Start Construction stationing shown on Plan and Profile views don’t match. Please revise as needed. • The proposed FH at Sta. 1+10.00 isn’t shown on the Profile view. • The Sta. 1+18.70 leader appears to be pointing to the incorrect location. Please revise. • The enlargement circle at Sta. 5+01.12 appears to be shown slightly off of the correct location. Please revise. • The FH stationing shown on the Plan and Profile views don’t seem to match. Please verify and revise where needed on this and all other Plan & Profile sheets.
Corrective Action Required
06/01/2020

Sheet 5: • There is a 5’ dimension pointing to what appears to be a valve symbol near Sta. 30+97.64. Please clarify. • The most upstream thrust block shown in the Profile view is located incorrectly graphically. • There is a water line shown in the Profile view above the existing grade line. Please clarify. • The existing grade leader is not pointing to the grade line. Please revise.
Corrective Action Required
06/01/2020

Sheet 6: The W/E is labeled as a 15’ Water Main Easement near Sta. 38+00, but other labels indicate it is a 20’ easement. Please revise as needed.
Corrective Action Required
06/01/2020

Sheet 7: The 2 proposed FHs shown in the Plan view aren’t shown in the Profile view.
Corrective Action Required
06/01/2020

Sheet 8: • There are labels showing existing vertical pipe and a pipe filled with concrete that are unclear. Is this something in conflict with the proposed water line? Please clarify. • There are 2 labels for the class of pipe shown in the Profile view that don’t match. Please revise where needed.
Corrective Action Required
06/01/2020

Estimate: • Please review the quantities for Items 4, 6, 8, 11, and 12. Revise as needed. • What are Items 13 & 14? • Please include items for connection to existing mains and repair to the existing road for the Line B construction.
Engineering Review Corrections 03/11/2020 03/11/2020
Sue Pyles, P.E.
Corrective Action Required
03/11/2020

Sheet 2: Delete General Note 14, it is not applicable.
Corrective Action Required
03/11/2020

Sheet 3: Revise the Air Relief Assembly at Sta. 11+90.80 to be flush with the proposed grade in the Profile view.
Corrective Action Required
03/11/2020

Sheet 5: • Sta. 32+08.0 R/W stationing in the Profile view appears incorrect. Please revise. • Review the different grade line types between Sta. 32+00 and the north end of the project, they appear to be different in parts of that section. Revise as required.
Corrective Action Required
03/11/2020

Sheet 6: • Why is the Air Relief Assembly at Sta. 46+80 located in a section of pipe lower than sections each direction? Consider relocating. • Please add casing pipe for the main under the waterway between Sta. 37+00 and Sta. 38+00.
Corrective Action Required
03/11/2020

Sheet 7: • Replace the Air Release Valve at Sta. 53+23.46 with a Fire Hydrant. • What is the concrete vault for that is shown in Plan view at Sta. 53+29.16?
Corrective Action Required
03/11/2020

Sheet 8: How will Line B connect to the existing 6” main?
Corrective Action Required
03/11/2020

General: • Due to high pressure, a portion of this main will need to be C900 Class 305 rather than Class 200. Adding a Pressure release Valve could reduce the length of Class 305 pipe required. • Please clarify that any deflection angles greater than 1 degree will need to be spread over multiple sections of pipe so that no deflection is added to the pipe and no more than 1 degree of deflection is added within the joint.
Engineering Review Corrections 10/18/2019 10/21/2019
Sue Pyles, P.E.
Corrective Action Required
10/21/2019

General: • Include erosion and sediment control to the plan set. • Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
10/21/2019

Sheet 1: Include a Summary of Quantities table on this sheet or elsewhere in the plan set.
Corrective Action Required
10/21/2019

Sheet 2: Revise to reference Lee’s Summit requirements, not KCMO, on this sheet and throughout the plan set.
Corrective Action Required
10/21/2019

Sheets 3-7: • Show the existing 18” storm sewer crossing at approximate Sta. 0+64 in the Profile view. • Show and label bends at approximate Sta. 0+84 and Sta. 45+40 in the Plan view. • The 4” PVC Cleanout label at approximate Sta. 5+40 is scaled back like existing features. Please revise. • Please include horizontal and vertical curve data to determine if bends are required. • Locate straddle blocks as required by Design and Construction manual Section 6901.D.6. • Locate valves as required by Design and Construction manual Section 6901.E.1. • The north air release assembly stationing shown in th Plan and Profile views don’t match. Please revise as needed.
Corrective Action Required
10/21/2019

Sheet 8: The Gravel Drive Typical Section specifies a rock size range. Is a dradation also required? If so, please add it to the detail.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
09/27/2019 Letter Routing Sheet
10/02/2019 12720_Water Main Lee's Summit_9-13-2019
10/21/2019 Letter DE-Comment Letter (Engineering Plans)
02/21/2020 Letter Resubmittal Routing Sheet
02/21/2020 Plans Water Main Lee's Summit
02/21/2020 Plans 2020.2.20 Village Offsite Water Comments Response
02/21/2020 Plans 1507734729_Joint Deflection AWWA
02/21/2020 Plans LS Off Site Waterline Estimate 2.20.2020
03/11/2020 Letter DE-Comment Letter (Engineering Plans)
05/18/2020 Water Main Lee's Summit 5.15.20
05/18/2020 LS Off Site Waterline Estimate 5.15.20
06/01/2020 Letter DE-Comment Letter (Engineering Plans)
06/12/2020 6.12.20 PS Off Site Waterline Estimate
06/12/2020 6.12.20 PS Village Offsite Water Comments Response
06/12/2020 6.12.20 PS Water Main Plans
06/19/2020 Letter DE-Comment Letter (Engineering Plans)
07/06/2020 7.6.20 LS Off Site Waterline Estimate
07/06/2020 7.6.20 Village Offsite Water Comments Response
07/06/2020 7.6.20 Water Main Lee's Summit
07/10/2020 Water Main Lee's Summit 7_10_2020
07/13/2020 Fees PL2019333 Paragon Star Public Off-Site Water Main Extension
07/15/2020 2020.4.17 Village Offsite Water Comments Response
07/15/2020 PL2019333 Paragon Star Public Off-Site MDNR Conc. Letter WAT Elec Signed
07/17/2020 PL2019333 Paragon Star Public Off Site Water Main Ext Water Model
07/19/2020 PL2019333 Paragon Star Public Off-Site Water Main Pending Items
08/26/2020 LEE’S SUMMIT_MO1010459_JACKSON CO_20200824_1000105-20_PDWB_CI
08/26/2020 Approved Plans Paragon Star Offsite water main extension Approved 8.26.20
08/27/2020 Letter DE-Engineering Plans Approval Letter
10/02/2020 Approved Plans Approved Revision - 12720C1600-6 Water Main Plan & Profile - Line A
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home