Planning Application Status

PL2019320




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019320
PARAGON STAR 2ND PLAT
Final Plat
Final Plat
Recorded
09/23/2019
HAPPY VALLEY PROPERTIES LLC
Locations
Contacts
PARAGON STAR LLC, Address:4025 NE LAKEWOOD WAY, Unit 250, Phone:(816) 207-4500  
GBA ARCHITECTS ENGINEERS , Address:9801 RENNER BLVD, Phone:(913) 492-0400  
HAPPY VALLEY PROPERTIES LLC, Address:801 NW COMMERCE DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 09/16/2021 09/20/2021
Jennifer Thompson
GIS Review No Comments 09/16/2021 09/17/2021
Kathy Kraemer
Engineering Review Approved with Conditions 09/16/2021 09/14/2021
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
09/09/2021

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
09/09/2021

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
09/09/2021

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
GIS Review No Comments 03/15/2021 03/15/2021
Kathy Kraemer
Engineering Review Approved with Conditions 03/15/2021 03/15/2021
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
03/15/2021

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
03/15/2021

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
03/15/2021

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
Planning Review No Comments 03/15/2021 03/15/2021
Jennifer Thompson
Fire Review No Comments 03/15/2021 03/08/2021
Mike Weisenborn
Traffic Review No Comments 03/15/2021 03/08/2021
Mike Weisenborn
Engineering Review Corrections 02/25/2021 02/25/2021
Sue Pyles, P.E.
Corrective Action Required
02/25/2021

Please provide an exhibit, for review purposes only, showing the how the Lot 20 lot lines and sanitary sewer easement near Lot 20 match the most recent submittals for the Lot 20 FDP and Sanitary Sewer Extension (revised to match the revised Lot 20 FDP).
Corrective Action Required
02/25/2021

Please relocate all line labels to point to lines within the plat boundry.
Planning Review Corrections 02/25/2021 02/25/2021
Jennifer Thompson
Corrective Action Required
02/23/2021

The final plat shall not be recorded by the developer until the Director of Development Services and the City Attorney have reviewed and approved the Easements, Covenants, and Restrictions Agreement referenced on the plat. In addition, the approved Easements, Covenants and Restrictions Agreement shall be recorded at the time of the recording of the final plat.
Corrective Action Required
02/23/2021

Revise the Planning Commission Secretary to John Lovell.
Corrective Action Required
02/23/2021

Does the gas/oil well note describe the entire boundaries within this plat? Please revise to simplify the description.
Corrective Action Required
02/23/2021

The lot numbering is very confusing. Although the PDP did perhaps show lot numbering similar to this, it can be revised to make sense for this plat.
Corrective Action Required
02/23/2021

What are the lines that seem like contours? Can these be removed?
Corrective Action Required
02/25/2021

Can the line weight for the surrounding property owners be even lighter? It makes the plat very busy.
GIS Review Corrections 02/17/2021 02/17/2021
Kathy Kraemer
Corrective Action Required
02/17/2021

Small observation: the dimensions from POC align with Paragon Star First Plat. Shouldn't the dimension 18.44 have S02-17-50W instead of S02-17-51W?
Fire Review No Comments 02/17/2021 02/17/2021
Jim Eden
Traffic Review No Comments 02/17/2021 02/16/2021
Michael Park
Traffic Review Corrections 05/05/2020 05/12/2020
Michael Park
Corrective Action Required
05/12/2020

Refer to comments on 1st Plat pertaining to ROW impacts at the View High Drive/Paragon Pkwy roundabout that may or may not impact the 2nd Plat.
Planning Review Corrections 05/12/2020 05/12/2020
Jennifer Thompson
Corrective Action Required
05/12/2020

The final plat shall not be recorded by the developer until the Director of Development Services and the City Attorney have reviewed and approved the Easements, Covenants, and Restrictions Agreement referenced on the plat. In addition, the approved Easements, Covenants and Restrictions Agreement shall be recorded at the time of the recording of the final plat.
Corrective Action Required
05/12/2020

Provide the application in electronic format, to include the affidavit/ownership page.
Corrective Action Required
05/12/2020

Revise the Planning Commission Secretary’s name to Carla Dial.
Corrective Action Required
05/12/2020

Revise the department name for Ryan Elam to Development Services.
Corrective Action Required
05/12/2020

What is the thought process behind the lot numbering? The first Plat is Lots 1-4, this 2nd Plat picks up at 9 and is not sequential. If changes occur, the plat title would need to be revised throughout the plat.
Corrective Action Required
05/12/2020

Within the General U/E dedication it only references Lot 14, shouldn’t this reference the entire Plat Title.
Corrective Action Required
05/12/2020

It seems likely existing easements will need to be vacated. Make a note on the plat which easements will need to be vacated.
Corrective Action Required
05/12/2020

Provide an exhibit that shows the footprints of the proposed buildings in relationship to the lots/tracts/easements, etc.
Corrective Action Required
05/12/2020

Staff will make a determination if sidewalks should be shown on this plat.
Corrective Action Required
05/12/2020

Recording of 1st and 2nd Plats will need to be coordinated for accuracy.
Corrective Action Required
05/12/2020

Additional comments may be forthcoming after revision submittal.
Corrective Action Required
05/12/2020

Provide a correspondence/response letter based on staff's comments.
Engineering Review Corrections 05/12/2020 05/12/2020
Sue Pyles, P.E.
Corrective Action Required
05/12/2020

Please provide an exhibit that only shows the plat boundary, lot/tract lines, existing easements, and proposed easements to aid in the plat review. It is very difficult to verify existing and proposed easements, and this exhibit will help determine if any of the existing easements will need to be vacated. Revisions to the plat may be required, pending review of this exhibit.
Corrective Action Required
05/12/2020

Are easements labeled "By Plat" existing easements that were dedicated on a previous plat and "By This Plat" proposed easements being dedicated now?
Corrective Action Required
05/12/2020

Please relocate labels that overlap easement boundaries. It is very hard to delineate easement boundaries, especially on the south half of this plat, because there are so many overlapping easements.
Corrective Action Required
05/12/2020

Show and label all stream buffers and include the following language on the plat: “In the areas designated as “Stream Buffer Easement” there is hereby granted to the City an easement for the purpose of prohibiting any development of any kind and prohibiting the erection, construction, placement or maintenance of any structures upon such land, as the term “structure” shall be defined in the City’s Unified Development Ordinance in Chapter 27 of the City Code of Ordinances, and prohibiting any change in the grade and elevation of such land, and prohibiting the alteration of the natural course and flow of the water in the stream, and prohibiting the damming or stoppage of the water in the stream, and to require the owners of such land to keep and maintain such land in its natural vegetative state and to tend, maintain and mow such land as required by the City’s Property Maintenance Code in Chapter 16 of the City Code of Ordinances, which easement shall constitute a servitude upon the land so encumbered and which shall run with the land in perpetuity and be binding upon the land owners, their successors and assigns and all other parties claiming under them, and shall remain in full force and effect forever.”
Fire Review No Comments 05/12/2020 04/30/2020
Jim Eden
Planning Review No Comments 10/25/2019 10/21/2019
Jennifer Thompson
Corrective Action Required
10/21/2019

No review of the plat has occurred at this time. Further discussion is needed to discuss the "overall" platting scheme, sequencing and approvals for the Paragon Star platting.
Traffic Review No Comments 10/25/2019 10/21/2019
Sue Pyles, P.E.
Engineering Review No Comments 10/25/2019 10/21/2019
Sue Pyles, P.E.
GIS Review Corrections 10/25/2019 10/01/2019
Kathy Kraemer
Corrective Action Required
10/01/2019

Please provide addresses for each lot.
Fire Review No Comments 10/01/2019
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Plat fee $712.00 $712.00 Paid 09/23/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 04/08/2021 05:00 PM Council Chambers 04/08/2021 05:00 PM
Public Hearing Review
Approved
City Council Ordinance 1st Reading 04/20/2021 06:00 PM Council Chambers 04/20/2021 06:00 PM
Public Hearing Review
Pending
City Council Ordinance 2nd Reading 05/04/2021 06:00 PM Council Chambers 05/04/2021 06:00 PM
Public Hearing Review
Pending
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home