Planning Application Status

PL2019288




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019288
LOT 10 STREETS OF WEST PRYOR
Commercial Final Development Plan
Commercial Final Development Plan
Approved
09/04/2019
CITY OF LEES SUMMIT
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
STREETS OF WEST PRYOR LLC, Address:7200 W 132ND ST STE 150  
SM ENGINEERING, Address:919 W STEWART RD, Phone:(785) 341-9747  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 11/07/2019 11/11/2019
Dawn Bell
Building Codes Review No Comments 11/07/2019 11/06/2019
Joe Frogge
Fire Review Approved with Conditions 11/07/2019 11/04/2019
Jim Eden
Code Statement
Informational
10/31/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Informational
10/31/2019

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: Show the hydrants to be provided on the private drives
Misc.
Informational
10/31/2019

All roads to the site and parking lot shall have a minimum of a base course of asphalt and all required hydrants in service prior to any combustible building amterials being staged on site or the beginning of any construction with combustible materials.
Engineering Review Approved with Conditions 11/07/2019 11/01/2019
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
11/01/2019

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
11/01/2019

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
11/01/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $65, 501.91
DE Future Repair Work
Corrective Action Required
11/01/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Traffic Review No Comments 11/07/2019 10/31/2019
Michael Park
Traffic Review No Comments 10/28/2019 10/28/2019
Michael Park
Building Codes Review No Comments 10/28/2019 10/28/2019
Joe Frogge
Engineering Review Corrections 10/28/2019 10/25/2019
Sue Pyles, P.E.
Corrective Action Required
10/25/2019

Sheet C3.0: Delete Utility Note 3. Water line testing is included in the permit fee.
Corrective Action Required
10/25/2019

Sheet C4.0: Inlet B-6 is labeled as Proposed - By Others in plan view, please revise the Profile view label to match. Please also revise the structure type to 4'x4' Double Drate Inlet to match the plans constructing the inlet.
Corrective Action Required
10/25/2019

Sheet C4.1: • Label all with and length dimensions, not just the 3 ramps 6’ in length. • Several locations on ADA Ramps 1 & 2 do not meet maximum design slope requirements of Design and Construction Manual Section 5305 Table LS-5. Lease revise.
Corrective Action Required
10/28/2019

This project is proposing to direct water overland to the south, which does not match the overall drainage plan for the development, and crosses another lot. Please provide written approval from the developer, via email is fine, agreeing to this plan.
Planning Review No Comments 10/28/2019 10/25/2019
Jennifer Thompson
Fire Review Approved with Conditions 10/28/2019 10/24/2019
Jim Eden
Code Statement
Informational
10/21/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Informational
10/24/2019

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: Show the hydrants to be provided on the private drives
Misc.
Informational
10/21/2019

All roads to the site shall have a minimum of a base course of asphalt and all required hydrants in service prior to any combustible building amterials being staged on site or the beginning of any construction with combustible materials.
Fire Review Corrections 10/14/2019 10/17/2019
Dawn Bell
Code Statement
Informational
10/07/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Corrective Action Required
10/07/2019

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: Show the hydrants to be provided on the private drives
Misc.
Corrective Action Required
10/07/2019

How will the site be accessed and water brought to the site if the existing overhead powerlines are still in place after construction begins?
Fire Lanes - Marking
Corrective Action Required
10/07/2019

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required: The fire lanes to the rea of the building (hydrand and FDC) shall be posted.
Misc.
Informational
10/07/2019

All roads to the site shall have a minimum of a base course of asphalt and all required hydrants in service prior to any combustible building amterials being staged on site or the beginning of any construction with combustible materials.
Engineering Review Corrections 10/14/2019 10/16/2019
Sue Pyles, P.E.
Corrective Action Required
10/16/2019

Revise all items shown as existing (storm sewer, retaining walls, etc.) to proposed by others.
Corrective Action Required
10/16/2019

All ADA-accessible ramps and ADA-accessible ways must have a specific detail associated with them. Please show the locations of these features, and provide a call-out on the plan view with a specific reference to the sheet number and detail number. The specific details of these features must include, at a minimum, the design details specified in Section 5304.8 of the Design and Construction Manual. Elevation call-outs, although required, are not sufficient. Other design details specified in this section are required, including slope call-outs which comply with the criteria listed in Table LS-5, and section views specified in 5304.8.
Corrective Action Required
10/16/2019

The A-1 inlet description in the Line A Profile view still does not match the storm sewer plans that include this construction. Please revise.
Corrective Action Required
10/16/2019

The storm drainage calculations for Line A do not match information shown in the Line A Profile. The capacity is also shown being exceeded. Please revise.
Corrective Action Required
10/16/2019

Include an item for ADA Ramps in the Engineer's Estimate of Probable Construction Costs.
Planning Review Corrections 10/14/2019 10/14/2019
Jennifer Thompson
Corrective Action Required
10/14/2019

The drive aisle width has not been met for the eastern drive aisle at the middle island. A distance of 24' is required and cannot inlcude the curbing associated with the island.
Corrective Action Required
10/14/2019

The positioning of the islands on the eastern portion of the property are awkward in that the parking spaces adjacent to them do not meet the minimum 9-foot width requirement. Please revise.
Corrective Action Required
10/14/2019

Revise the caliper size for the ornamental tree varieties to a 3" minimum caliper size.
Building Codes Review No Comments 10/14/2019 10/11/2019
Joe Frogge
Traffic Review No Comments 10/14/2019 10/11/2019
Michael Park
Engineering Review Corrections 09/18/2019 09/19/2019
Sue Pyles, P.E.
Corrective Action Required
09/19/2019

General: • Nothing has been constructed yet on the site, and the timing of all construction elements is still unknown. Please revise all items labeled “Existing” to “Proposed (By Others)” or similar to denote this. • Revise the private drive names to match the Final Development Plan that includes their construction. That FDP names them Private Road A, B, and C. • Include fire hydrant and Nyoplast Drain Basin with concrete collar standard details in the plan set. • Submit the SWPPP and a copy of the MDNR Land Disturbance Permit. • Submit an Engineer's Estimate of Probable Construction Costs. • Please note that if the existing conditions due to the KCPL overhead lines do not match what is shown in the plans at the time of construction, and construction is not possible as shown, revisions submitted to the City for review and approval will be required.
Corrective Action Required
09/19/2019

Sheet C1.0: Revise the water and sanitary sewer contact to be the Water Utilities Department at 1200 SE Hamblen Road, Lee’s Summit, MO 64081 with phone number 816-969-1900.
Corrective Action Required
09/19/2019

Sheet C2.0: • It appears that the CW2 label leaders on the west side of the lot are pointing to the wrong spots. • The PV2 hatching is overlapping the PV3 hatching. Please revise.
Corrective Action Required
09/19/2019

Sheet C3.0: • Detail SS2 is included in the Legend, but not shown in Plan view, while SSA is shown in Plan view but is not included in the Legend. Revise to include the references as applicable and verify any standard details needed are included in the plan set. • Connection to the sanitary main shall be by cut-in wye, please revise the label accordingly. • Include a water line profile for the main between the connection point to the cap and plug. Include any crossings with elevations to verify separation requirements are being met. • Crossings at angles less than 45 degrees are not allowed. Verify the angle of crossing between the water and sanitary sewer lines, and revise if needed.
Corrective Action Required
09/19/2019

Sheet C4.0: • The A-1 inlet description doesn’t match the storm sewer plans that include this construction. Please revise. • The drop through Structure A-1 does not meet the 0.5’ minimum drop allowed. Please revise. • Show the design HGL in the Profile view, • Include the storm sewer calculations. • The approved Drainage Map for the overall development shows all of the drainage on Lot 10 being collected on Lot 10. The plans note a portion of the drainage be directed to the south of the lot. Please reconcile.
Corrective Action Required
09/19/2019

Sheet C5.0: Erosion control measures, such as silt fence, should be included along the west side of the lot. The plan shows pavement to the west, but the timing of the paving is unknown.
Planning Review Corrections 09/18/2019 09/19/2019
Jennifer Thompson
Corrective Action Required
09/19/2019

Revise the Water Utilities contact to Jeff Thorn.
Corrective Action Required
09/19/2019

The islands within the parking lot seem to crowd out parking spaces. Are these areas intended to accommodate parking spaces?
Corrective Action Required
09/19/2019

Drive aisle widths are not met at the areas of the island bump outs. A width of 24' is required not to include any portion of the curb and gutter. Please revise.
Corrective Action Required
09/19/2019

Revise the accessible sign detail to indicate the sign height to be a required 5' from grade to bottom of sign.
Corrective Action Required
09/19/2019

Revise the caliper sizes for the trees to be a 3" minimum.
Corrective Action Required
09/19/2019

The required number of trees on the north private road has not been met. A total of 17 trees are required, however 11 are provided.
Corrective Action Required
09/19/2019

What is the reference to Donovan Rd within the landscape site data table?
Corrective Action Required
09/19/2019

The required number of trees and shrubs are not provided along the west private road. Please revise and the landscape data table and the landscape sheet.
Corrective Action Required
09/19/2019

The islands within the parking lot are required to be landscaped. Please revise.
Corrective Action Required
09/19/2019

The number of shrubs and trees for the open yard calculation is not correct. A total of 26 trees and 53 shrubs are required.
Corrective Action Required
09/19/2019

Street trees are required along SW Pryor Rd. Provide ornamental species if KCPL will not allow shade trees. Provide documentation from KCPL if there is a strict restriction for trees in this area.
Corrective Action Required
09/19/2019

Can color elevations be provided, even if in electronic form?
Corrective Action Required
09/19/2019

Provide the manufacturer's specifications for all exterior lighting (building and parking lot).
Building Codes Review Corrections 09/18/2019 09/18/2019
Joe Frogge
Corrective Action Required
09/18/2019

Provide specifications and details for grease interceptors.
Corrective Action Required
09/18/2019

Provide complete plans for site lighting including all circuitry and light pole base details.
Traffic Review Corrections 09/18/2019 09/18/2019
Michael Park
Corrective Action Required
09/18/2019

Add sidewalk along the east-west private road (e.g. Summit Woods Xing) adjacent to Lot 10 and connecting with sidewalks along Pryor Road (southwest corner of the intersection) and proposed sidewalks along north-south private drive.
Fire Review Corrections 09/18/2019 09/10/2019
Jim Eden
Code Statement
Informational
09/09/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Corrective Action Required
09/09/2019

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: Show the hydrants to be provided on the private drives
Misc.
Corrective Action Required
09/09/2019

How will the site be accessed and water brought to the site if the existing overhead powerlines are still in place after construction begins?
Fire Lanes - Marking
Corrective Action Required
09/09/2019

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required: The fire lanes to the rea of the building (hydrand and FDC) shall be posted.
Misc.
Informational
09/09/2019

All roads to the site shall have a minimum of a base course of asphalt and all required hydrants in service prior to any combustible building amterials being staged on site or the beginning of any construction with combustible materials.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 09/04/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
09/04/2019 Receipt Receipt for transaction: 2019-006003
09/04/2019 Letter Routing Sheet - FDP
09/04/2019 Plans MATERIALS BOARD
09/04/2019 Plans mcgraw-gleon-galleon-flood-td506001en-sss
09/04/2019 Plans MEP-West Pryor Lee Summit - ME101
09/04/2019 Plans Streets of W Pryor Lot 10 FDP
09/04/2019 Plans 171057 WEST PRYOR LOT 10 090319 TRASH ENCLOSURE
09/04/2019 Plans 171057.1 West Pryor Lot 10 090319 (1)
09/20/2019 Letter Applicant Letter - FDP (DFDP)
09/30/2019 171057 West Pryor - Lot 10 - Rendered Elevation
10/07/2019 Letter Resubmittal Routing Sheet - FDP
10/07/2019 Plans City Review Comments Responses
10/07/2019 Plans concealed LED strip Fixture
10/07/2019 Plans Lot 10 Cost Estimate 10-3-19
10/07/2019 Plans Lot 10 SOWP SWPPP
10/07/2019 Plans MEP-West Pryor Lee Summit - FDP Revisions
10/07/2019 Plans Streets of W Pryor Lot 10 FDP 10-3-19
10/07/2019 Plans Type A
10/07/2019 Plans Type AA, BB, CC
10/07/2019 Plans Type B
10/07/2019 Plans Type D bmw_led
10/07/2019 Plans A-202
10/17/2019 Letter Applicant Letter - FDP (DFDP)
10/21/2019 Letter Resubmittal Routing Sheet - FDP
10/21/2019 Plans City 2d Review Comments Responses
10/21/2019 Plans FDP Streets of W Pryor Lot 10 Rev 10-21-19
10/21/2019 Plans Lot 10 Cost Estimate 10-21-19
10/29/2019 Letter Applicant Letter - FDP (DFDP)
10/31/2019 Letter Resubmittal Routing Sheet - FDP
11/01/2019 Activity Document Fees PL2019188 Lot 10 Streets of West Pryor FDP
11/11/2019 Letter Applicant Letter - FDP (DFDP)
03/23/2020 Activity Document Lot 10 SWP Pvmt Waiver
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home