Summary
PL2019235
HAWTHORN RIDGE 2ND PLAT - STREET AND STORM SEWER PLANS
Engineering Plan Review
Engineering Plan Review
Approved
07/15/2019
CMH PARKS INC
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 03/26/2021 04/13/2021
Gene Williams, P.E.
Engineering Review No Comments 10/22/2020 10/22/2020
Gene Williams, P.E.
Traffic Review No Comments 10/22/2020 10/21/2020
Michael Park
Engineering Review Corrections 10/06/2020 10/05/2020
Gene Williams, P.E.
Corrective Action Required
10/05/2020

Sheet C103: The grading at the end of the rip rap does not appear to make sense from an elevation standpoint, nor from an erosion standpoint. There does not appear to be any form of swale created for the discharge, and it appears there is a long, flat area just downstream of the rip rap. If this area will have a sediment basin, then shouldn't it be shown in this area, along with the grading?
Engineering Review No Comments 08/28/2019 08/28/2019
Gene Williams, P.E.
Traffic Review No Comments 08/28/2019 08/15/2019
Michael Park
Engineering Review Corrections 07/29/2019 07/26/2019
Gene Williams, P.E.
Corrective Action Required
07/26/2019

Please refer to the City Traffic Engineer's comments related to the proposed four way stop at Buckthorn St. and Arboridge Dr. This comment may change the way you are proposing to provide an ADA-accessible route across the intersection, where there is no longer a stop control (i.e., due to the fact that a four way stop is not desired by the City).
Corrective Action Required
07/26/2019

Sheet C116: Please see the City Traffic Engineer's comments related to the City's desire to eliminate the proposed four way stop controlled intersection.
Corrective Action Required
07/26/2019

Sheet C119: Please see comments from the City Traffic Engineer related to the elimination of the four way stop controlled intersection. This may affect the design across Buckthorn St. The City's desire for non-stop controlled intersections is to have a smooth driving experience across the intersection, with no abrupt change in grade.
Corrective Action Required
07/26/2019

Sheet C120: The maximum distance between the tactile warning strip, and the back of curb was not shown on the northeast and southeast corners of the intersection. The maximum allowed distance is 5.0 feet. Please label this dimension, and ensure it is less than or equal to 5.0 feet.
Corrective Action Required
07/26/2019

Sheet C121: The same comment above applies to the ADA-accessible ramps shown in the southwest and southeast corners of the intersection. Please provide a dimension, and ensure it is less than or equal to 5.0 feet.
Corrective Action Required
07/26/2019

General Comment Related to the ADA-Accessible Ramp Details: Section A-A, B-B, and C-C were missing from the plans. To recap the requirements contained in Section 5304.8 of the Design and Construction Manual, Section A-A is the cross-section along the long axis of the ramp, Section B-B is the cross-section along the width of the ramp, and Section C-C is the cross-section along the curb opening of the ramp. These cross-sections must be shown, along with corresponding locations of the cross-sections shown on the plan view.
Corrective Action Required
07/26/2019

General Note Concerning the Hydraulic Grade Line Shown on the Profile Views: The system was designed for the 25 year (i.e., 4% chance) storm event. As such, the hydraulic grade line for this event should be at or below the crown of the pipe. There are numerous instances where this is not the case.
Corrective Action Required
07/26/2019

Sheet C124: Geofabric is required for the rip rap shown. Please provide sufficient notes.
Corrective Action Required
07/26/2019

Sheet C140: A drainage swale was shown on the Preliminary Development Plan beginning at Lot 125 and Lot 147, which continued to the north. The Master Drainage Plan does not show this swale, and it appears a swale is warranted.
Corrective Action Required
07/26/2019

Sheet C140: Existing and proposed grades must be shown on the lot corners. As shown, only the proposed grades are shown.
Corrective Action Required
07/26/2019

Sheet C140: References to the "MLO" are cited througout this sheet. The City does not recognize a "MLO", but rather, the Minimum Building Opening Elevation (MBOE). Please change all references to "MLO" to "MBOE".
Traffic Review Corrections 07/29/2019 07/18/2019
Michael Park
Corrective Action Required
07/18/2019

Revise the noted design speed from 30 mph to 25 mph. The alignments looks okay, but there's one K value that does not meet 30 mph (it does meet 25 mph). No change to alignments (horizontal and vertical) are needed.
Corrective Action Required
07/18/2019

Remove the stop signs and street name signs from Buckthorn Street at the intersection of Arborridge Dr. Move the street name signs to the proposed stop signs on Arborridge Drive. The intersection does not warrant an all-way stop condition.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.