THE PRINCETON - OLDHAM PKWY & PRINCETON DR IMPROVEMENTS
Engineering Plan Review
Engineering Plan Review
Approved
06/21/2019
METCALF BANK
includes the stormwater improvements
Locations
Contacts
METCALF BANK, Address:609 NE 291 HWY  
OLSSON , Address:7301 W 133RD ST STE 200, Phone:(913) 381-1170  
LEES SUMMIT SENIOR COMMUNITY LLC, Address:5051 S NATIONAL AVE STE 4-100  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review No Comments 12/08/2022 12/06/2022
Gene Williams, P.E.
Record Drawings Review Corrections 11/10/2022 11/11/2022
Gene Williams, P.E.
Record Drawings Review Corrections 09/28/2022 09/27/2022
Gene Williams, P.E.
Engineering Review No Comments 08/29/2019 08/29/2019
Gene Williams, P.E.
Traffic Review Approved with Conditions 08/29/2019 08/26/2019
Michael Park
Informational
08/26/2019

Improvements related to Oldham Parkway are subject to MoDOT review and approval. Please submit documentation that MoDOT has reviewed and approved the portion of these plans related to Oldham Parkway.
Traffic Review Approved with Conditions 08/12/2019 08/13/2019
Michael Park
Corrective Action Required
08/13/2019

Improvements related to Oldham Parkway are subject to MoDOT review and approval. Please submit documentation that MoDOT has reviewed and approved the portion of these plans related to Oldham Parkway.
Engineering Review No Comments 08/12/2019 08/12/2019
Gene Williams, P.E.
Engineering Review Corrections 07/08/2019 07/03/2019
Gene Williams, P.E.
Corrective Action Required
07/02/2019

Please adjust the "index of sheets" to reflect the water line plans being separate, and not a part of these plans.
Corrective Action Required
07/02/2019

Sheet T6: Surface course asphaltic concrete pavement for Princeton Dr. should be specified as Type 5 or 6, and the base course for Princeton Dr. should be specified as Type 5. This changed recently in the Design and Construction Manual.
Corrective Action Required
07/03/2019

Sheet T12: The intersection of Princeton Dr. and Oldham Pkwy. is at a stop-controlled condition. The design grade across the ADA-accessible route must be designed with a cross-slope no greater than 1.5%, and a minimum width of 5 feet across the ADA-accessible route. This is different than PROWAG, and is a City of Lee's Summit requirement. This allows for tolerance in construction, since the City will allow for a construction tolerance of no greater than 2.0% cross-slope across the ADA-accessible route.
Corrective Action Required
07/03/2019

Sheet T13: A minimum 5 foot wide ADA-accessible ramp must be shown across the driveway, with a maximum design cross-slope of 1.5%.
Corrective Action Required
07/03/2019

Sheet T15: The maximum design running slope for an ADA-accessible ramp within the City of Lee's Summit is 7.5%. There are instances where this design standard are not met. Please revise.
Corrective Action Required
07/03/2019

Sheet T15: All ADA-accessible ramps within right of way require that certain design elements presented in Section 5304.8 of the Design and Construction Manual be specified. In particular, call-outs are required for the distance between the tactile warning and the back of curb. This distance cannot be more than 5.0 feet. Cross-sections A-A, B-B, and C-C are also required for each ramp, with call-outs of the slopes, elevations, etc. For your reference, cross-section A-A must be shown along the long axis of the ramp, B-B must be across the width of the ramp, and C-C must be along the curb opening of the ramp.
Corrective Action Required
07/03/2019

Sheet T15: Tapered "wings" are shown on the various ADA-accessible ramps, for no apparent reason. Is it possible to grade the surrounding earth to achieve a reasonable slope, without using the tapered "wings"? These "wings" are problematic to our Operations group, and do not serve any purpose.
Corrective Action Required
07/03/2019

Sheet T15: Please show the ADA-accessible route across Princeton Dr. since this is at a stop-controlled intersection. Maximum cross-slope should be 1.5%, and the minimum width is 5.0 feet.
Corrective Action Required
07/03/2019

Sheet T15: Please show the ADA-accessible route across the new drive entrance from Oldham Pkwy. Please see above comment concerning maximum cross-slope and minimum width.
Corrective Action Required
07/03/2019

Sheet T18: Please add a prominent note stating that these details are meant to describe tie bar locations, and isolation joints. It is not meant to supercede the site-specific design details for the ADA-accessible ramps.
Corrective Action Required
07/03/2019

If there are any additional questions concerning the ADA-accessible ramp design details, please contact me. The issue the City has been experiencing in the past, is there is not enough up-front engineering design emphasis on these ramps, and they eventually are designed in the field. Many of these need to be removed and replaced, because the field design was not correct.
Corrective Action Required
07/03/2019

Sheet ST1: Please define "HP" pipe. Is this CPP? Is this HDPE?
Corrective Action Required
07/03/2019

Sheet ST1.0: It appears the finish grade was omitted between station 6+00 and 6+50.
Corrective Action Required
07/03/2019

General Note Concerning Hydraulic Grade Line: While it is acceptable to show the 4% chance storm event within the pipe, the City needs to see that the 10% chance event is below the top of the crown of the pipe in all instances. Please revise the profile view to show the 10% chance event hydraulic grade line is below the top of the pipe in all instances, or provide upsizing of the pipe to ensure this occurs.
Corrective Action Required
07/03/2019

Sheet ST1.3: The 10% annual chance hydraulic grade line is shown above the crown of the pipe on Storm Line 6. The City requires the 10% chance event hydraulic grade line to be below the top of the crown of the pipe. Please revise the design to ensure this occurs.
Corrective Action Required
07/03/2019

Rip rap calculations may be required by MoDOT. Please be aware of this, and be prepared to make adjustments to the design as needed.
Traffic Review Corrections 07/08/2019 06/27/2019
Michael Park
Corrective Action Required
06/27/2019

Improvements related to Oldham Parkway are subject to MoDOT review and approval. Please submit documentation that MoDOT has reviewed and approved the portion of these plans related to Oldham Parkway.
Corrective Action Required
06/27/2019

The alignment of Princeton Drive between L2 and L3 is not described; update the plans with this information.
Corrective Action Required
06/27/2019

Was paved shoulder along the north side of Oldham Parkway omitted and deferred to coordinate with Oldham Improvements between Ranson Road and the development, or should the plans be revised to include this shoulder in the area of road widening? The improved typical section supported was intended to match (or be similar with) what was approved and constructed for Blue Parkway west of Todd George in association with recent development on the NW Quadrant of the interchange based on the PDP; subject to MoDOT approval.
Corrective Action Required
06/27/2019

Existing 4" Dashed Yellow Line should be changed to 4" Solid Double Yellow.
Corrective Action Required
06/27/2019

The S.L (25) sign on Princeton Drive just north of the existing street connection (for northbound traffic) should be removed.
Corrective Action Required
06/27/2019

The stop line and double yellow line on Princeton Drive should be removed.
Corrective Action Required
06/27/2019

Any existing end of road markings and dead end signing associated with existing Princeton Drive should be removed.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home