Planning Application Status

PL2019145




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019145
Summit Orchard Lot 4 Infrastructure Improvements, Road Plans, Landscaping and Monument Signage
Commercial Final Development Plan
Commercial Final Development Plan
Approved
04/12/2019
TOWNSEND SUMMIT LLC
Locations
Contacts
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
ANDERSON ENGINEERING INC, Address:941 W 141ST TERRACE SUITE A, Phone:(816) 777-0400  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Corrections 01/07/2020 01/07/2020
Sue Pyles, P.E.
Corrective Action Required
01/07/2020

Please revise the title box to reflect the correct project, PL2019145 Summit Orchard Lot 4 Infrastructure Improvements.
Miscellaneous Correction
Corrective Action Required
01/07/2020

Please revise the title box to reflect the correct project, PL2019145 Summit Orchard Lot 4 Infrastructure Improvements.
Corrective Action Required
01/07/2020

Is the only difference in structure types whether they have solid or grate lids? If so, please include one standard detail and note the lid options. Specify what grate is required.
Miscellaneous Correction
Corrective Action Required
01/07/2020

Is the only difference in structure types whether they have solid or grate lids? If so, please include one standard detail and note the lid options. Specify what grate is required.
Corrective Action Required
01/07/2020

A wall corner detail is required to clarify reinforcing steel requirements. Since there is essentially a tall MH sitting on top of a JB, please include a special design for the top of the JB to accommodate that construction.
Miscellaneous Correction
Corrective Action Required
01/07/2020

Corrective Action Required
01/07/2020

C & B 2102 steps are not on the Public Works Approved Products List. Either remove that option or just refer to the list.
Corrective Action Required
01/07/2020

Please submit an Engineer’s Estimate of Probable Construction Costs.
Engineering Review Corrections 12/04/2019 12/04/2019
Sue Pyles, P.E.
Corrective Action Required
12/04/2019

Please include this work as a revision/addition to the approved project PL2019145 Summit Orchard Lot 4 Infrastructure Improvements, Road Plans, Landscaping, and Monument Signage.
Corrective Action Required
12/04/2019

Bends in storm sewer pipes are not allowed, all changes in direction must be made at structures. Please revise accordingly.
Corrective Action Required
12/04/2019

Please note that special designs are required for all structures with H>7 feet.
Corrective Action Required
12/04/2019

Please verify if the existing storm sewer is a single 36” pipe or dual 36” pipes. If dual, then dual pipes must be relocated.
Corrective Action Required
12/04/2019

Is the existing pipe being abandoned or removed? Please clarify and label accordingly.
Corrective Action Required
12/04/2019

Structures must come to the surface, rises are not allowed. Please revise accordingly.
Corrective Action Required
12/04/2019

Please use the City’s standard details for storm sewer structures or verify that the standard details used are in agreement with the City’s detail (MH Ring & Lid, concrete requirements, etc.).
Traffic Review Approved with Conditions 09/27/2019 10/02/2019
Michael Park
Corrective Action Required
10/02/2019

The intersection sight distance for posted speed limit along Ward Road at the RIROLI Driveway still appears inadequate due to proposed monument sign in the SE corner of the intersection. The sight triangles drawn reference a stop position encroaching the extended right turn lane and overlapping the crosswalk (should be dimensioned behind the stop line). This is FYI since the monument/landscaping and driveway are private on private property and any mitigation for inadequate ISD would be a private matter. All other areas look okay.
Planning Review No Comments 09/27/2019 09/30/2019
Mike Weisenborn
Fire Review Approved with Conditions 09/27/2019 09/30/2019
Mike Weisenborn
Code Statement
Informational
09/20/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Informational
09/20/2019

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: Hydrant plans to be submitted as part of individual FDP's fo each lot.
Building Codes Review No Comments 09/27/2019 09/27/2019
Joe Frogge
Engineering Review No Comments 09/27/2019 09/25/2019
Sue Pyles, P.E.
Miscellaneous Correction
Resolved
10/02/2019

Sheet L201: The Profile view of Detail 6 Entry Sign Type A does not show a footing. How does this differ from the Entry Sign Type B, which does show a footing?
Misc.
Resolved
10/02/2019

The south entry sign at Ward Rd & E-W Rd and the north entry sign at Donovan Rd & E-W Rd are directly over storm sewer and sanitary sewer lines, respectively. This is allowed because these lines are private. However, it is highly recommended that caution be used in making this decision and that extra care be used in the final design of the sign footings.
Engineering Review Corrections 09/05/2019 09/05/2019
Sue Pyles, P.E.
Miscellaneous Correction
Corrective Action Required
08/28/2019

Sheet L201: The Profile view of Detail 6 Entry Sign Type A does not show a footing. How does this differ from the Entry Sign Type B, which does show a footing?
Misc.
Corrective Action Required
08/28/2019

The south entry sign at Ward Rd & E-W Rd and the north entry sign at Donovan Rd & E-W Rd are directly over storm sewer and sanitary sewer lines, respectively. This is allowed because these lines are private. However, it is highly recommended that caution be used in making this decision and that extra care be used in the final design of the sign footings.
Fire Review Approved with Conditions 09/05/2019 09/05/2019
Jim Eden
Code Statement
Informational
08/28/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Informational
08/28/2019

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: Hydrant plans to be submitted as part of individual FDP's fo each lot.
Traffic Review Corrections 09/05/2019 09/04/2019
Michael Park
Corrective Action Required
09/04/2019

Check the intersection sight distance for posted speed limit along Ward Road at the RIROLI Driveway. The landscape and monument in the SE corner appears to obstruct visibility from a typical driver's viewpoint stopped behind the crosswalk. All other areas look okay.
Planning Review Corrections 09/05/2019 08/30/2019
Hector Soto Jr.
Corrective Action Required
08/30/2019

MONUMENT SIGNS. - The preliminary development plan approved for Summit Orchards in 2016 included a sign package calling for a total of 3 monument signs identifying the shopping center (1 sign located at each of the following: NE corner of Ward/Chipman; SE corner of Ward/Donovan; and NW Donovan/Chipman), plus up to 6 additional monument signs for individual pad sites/lots. A total of two of the shopping center signs were approved to be oversized monument signs (116 sq. ft. sign face area and 144 sq. ft. structure area) to be located at the northeast corner of NW Ward Rd and NW Chipman Rd, as well as the northwest corner of NW Chipman Rd and NW Donovan Rd. The condition of approval included the statement that all other signage for the development will comply with the sign standards of the CP-2 zoning district. As depicted on the latest final development plan, a total of 4 shopping center signs are proposed (1 more than that on the approved preliminary development), plus 2 multi-tenant shopping center signs. Is the intent for these 6 total monument signs to take the place of the 9 total monument signs included on the preliminary development plan, or will the future pad sites also have additional individual monument signs? Please provide an update on the intended sign program for the center in order for staff to evaluate against the previous approval from 2016. - Each of the four proposed 4'-6" tall shopping center monument signs exceed the 144 sq. ft. allowable structure area approved in 2016. Additionally, only two such oversized monument signs were allowed for the shopping center. All other monument signs must meet the size standards cited in the comment below. - The two multi-tenant monument signs exceed the maximum allowable monument sign height of 12'; exceed the maximum allowable sign face area of 72 sq. ft.; and exceed the maximum allowable strucute area of 96 sq. ft. The plans show the signs being 22' tall; having 112 sq. ft. sign face area; and 223.4 sq. ft. sign structure area.
Engineering Review Approved with Conditions 06/10/2019 06/11/2019
Sue Pyles, P.E.
DE Contact Field Eng. Inspector
Corrective Action Required
06/11/2019

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
06/11/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $21,354.94 (which is calculated as 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
DE Future Repair Work
Corrective Action Required
06/11/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Traffic Review No Comments 06/10/2019 06/11/2019
Sue Pyles, P.E.
Planning Review No Comments 06/10/2019 06/10/2019
Hector Soto Jr.
Fire Review Approved with Conditions 06/10/2019 06/06/2019
Jim Eden
Code Statement
Informational
06/03/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Informational
06/06/2019

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: Hydrant plans to be submitted as part of individual FDP's for each lot.
Engineering Review Corrections 05/22/2019 05/29/2019
Sue Pyles, P.E.
Corrective Action Required
05/29/2019

Please address the Traffic Review comments and resubmit 3 copies.
Fire Review Corrections 05/22/2019 05/29/2019
Jim Eden
Code Statement
Informational
05/15/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Corrective Action Required
05/15/2019

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: Provide a hydrant plan for the proposed site plan. Hydrants located on the opposite side of a divided roadway do not count for this project. Provide an interior fire main.
Traffic Review Corrections 05/22/2019 05/24/2019
Michael Park
Corrective Action Required
05/24/2019

Sheet C201-C202. The prior comment pertaining to Inlet D1, required 0.5' drop does not appear addressed. The plan elevations noted show a 0.19' drop.
Corrective Action Required
05/24/2019

Sheet C201-C202. Previous comment regarding 18" minimum separation between sanitary and storm was in error related to Sanitary Line B. Consequently, the plan notes related to Sanitary Line B construction material (Ductile Iron Pipe) should be deleted as the utility does not want Ductile Iron Pipe at this crossing location.
Planning Review No Comments 05/22/2019 05/17/2019
Hector Soto Jr.
Engineering Review Corrections 04/26/2019 04/30/2019
Sue Pyles, P.E.
Corrective Action Required
04/30/2019

General: • Please add “NW” to all street names throughout the plan set. • Please submit an Engineer's Estimate of Probable Construction Costs. • Include storm sewer calculations in the plan set. • Provide verification, in email is fine, that the angle of connection between Line D and the existing structure meets City requirements.
Corrective Action Required
04/30/2019

Sheet C002: • Label Storm Line E, Structures E1-E4 and A2. • Remove all crosswalk striping on this sheet and throughout the plan set. • Why are there a few contours shown? As this is an overall sheet, all contours can be either turned off or scaled back as some are currently shown. • Show Type CG-1 curb & gutter on both roads, East-West and North-South, on this sheet and throughout the plan set. • Include a note requiring pre-formed thermoplastic for the 10’ crosswalk.
Corrective Action Required
04/30/2019

Sheet C051: • Show and label existing contours. • Separate drainage information to sheet separate from the grading plan.
Corrective Action Required
04/30/2019

Sheet C101-C104: • Include a specific detail associated with each ADA-Accessible Ramp, and provide a call-out in Plan view with a specific reference to the sheet number and detail number. • The specific details of the ramps must include, at a minimum, the design details specified in Section 5304.8 of the Design and Construction Manual. Elevation call-outs, although required, are not sufficient. Other design details specified in this section are required, including slope call-outs which comply with the criteria listed in Table LS-5, and section views specified in 5304.8.
Corrective Action Required
04/30/2019

Sheets C102-C103: Show horizontal curve information with a minimum 200’ radius.
Corrective Action Required
04/30/2019

Sheet C104: Relocate overlapping text near Sta. 0+00 in the Profile view for clarity.
Corrective Action Required
04/30/2019

Sheet C201-C202: • Include existing pipe information downstream of existing inlets at the Line A & C connections. • Revise the flowline information in the Profile views of Lines D-D so the FL In is on the upstream side and the FL out is on the downstream side of the leader. • Inlet D1 does not meet the 0.5’ drop requirement, please revise. • Revise the proposed pipe at A2, there is a break graphically between the pipe and structure. • Include separation between sanitary and storm at the pipe crossings on Lines A & D to verify City requirements are met. • Show and label both existing and proposed grade. • Include design HGL in the pipe profiles.
Corrective Action Required
04/30/2019

Sheet C501: • Replace Keyed Construction Joint with Longitudinal Joint at C/L of pavement. • Is there a pavement design for the 7” PCC? This does not match the City’s design for Commercial, Industrial, Local/Collector which is 8” PCC, 4” Aggregate Base, and 9” Subgrade Stabilization. • Note should read Transverse Contraction Joints not Construction. Also, the maximum spacing for Transverse Contraction joints is 15’-0”. • Remove Keyed Construction Joint from the joint details. • Longitudinal Joint detail – D/4 should be D/3 and #4 Bar should be changed to #5 bar. • Need to show Transverse Contraction, Transverse Construction, and Transverse Isolation Joint details. • All Transverse Joint details – D/4 should be D/3 and dowels should be 1 1/4" diameter and 18” long. • The City can supply their Typical Pavement Joint Details if required. • All Tie bars and Dowels shall be Epoxy coated. • Replace “on” with “or” in first sentence under Requirement.
Planning Review Corrections 04/26/2019 04/26/2019
Hector Soto Jr.
Corrective Action Required
04/26/2019

SIDEWALKS. Show all sidewalks to be constructed. Label the widths of said sidewalks.
Traffic Review Corrections 04/26/2019 04/25/2019
Michael Park
Corrective Action Required
04/25/2019

The three marked crosswalks at the intersections of Chipman, Ward and Donovan are not required by City Policy and Procedure for crosswalk marking locations and the markings at these locations should be removed at this time.
Corrective Action Required
04/25/2019

The plans should show curb locations and other improvements (e.g. sidewalks) that will be constructed. Is the pavement wider approaching Ward/Donovan at each end of the east-west road due to median treatments and/or space for turning movements?
Corrective Action Required
04/25/2019

Recommend adding stop signs for each road intersection at Chipman, Ward and Donovan.
Fire Review Corrections 04/26/2019 04/19/2019
Jim Eden
Code Statement
Informational
04/19/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Corrective Action Required
04/19/2019

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: Provide a hydrant plan.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $1,000.00 $1,000.00 Paid 04/15/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home