Planning Application Status

PL2018156




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2018156
THE RESERVE AT STONEY CREEK 4TH PLAT SANITARY SEWER
Engineering Plan Review
Engineering Plan Review
Approved
08/30/2018
DJ23 INVESTMENTS LLC
LOTS 111-127 & TRACT O
Locations
Contacts
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
DJ23 INVESTMENTS LLC, Address:7200 W 132ND ST  
ANDERSON KEYANA I, Address:1920 SW HIGHTOWN DR  
BROWN XAVIER A & GEENA R, Address:1924 SW HIGHTOWN DR  
ROSE KENDRICK SEPERATE PROP TRUST - 2014 DATED 02-14-2014, Address:1928 SW HIGHTOWN DR  
HOLLIDAY CHRISTOPHER, Address:1932 SW HIGHTOWN DR  
AVITAL HOMES LLC, Address:15729 BALLENTINE ST  
STONEY CREEK ESTATES HOMEOWNERS ASSOCIATION INC, Address:120 SE 30TH ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 02/19/2019 02/20/2019
Sue Pyles, P.E.
Engineering Review Corrections 01/11/2019 01/09/2019
Sue Pyles, P.E.
Corrective Action Required
01/09/2019

Include sanitary sewer connection information on each lot in Plan view.
Corrective Action Required
01/09/2019

The Line 1 stationing indicates that the length of pipe between MHs 1-4 & 1-5 is 209.05 feet and a total length of 571.13 feet. The pipe information shows the pipe between MHs 1-4 & 1-5 as 208.60 feet for a total length of 570.68 feet. The estimate also shows the total length as 570.68 feet. Please revise as needed to reconcile.
Engineering Review Corrections 09/21/2018 09/21/2018
Sue Pyles, P.E.
Corrective Action Required
09/21/2018

Sheet C.400: Revise the Utility Companies list to refer to Development Engineering Inspections at 816-969-1200.
Corrective Action Required
09/21/2018

Sheet C.401: Revise the plat boundary to match the final plat on these sheets and throughout the plan set.
Corrective Action Required
09/21/2018

Sheet C.402: • Add the existing pipe and extend the existing grade line downstream of Ex MH 1-3 in the Profile view. • The pipe lengths and stationing don’t match. Please reconcile. • Please label MH 1-3 as existing. • The sanitary sewer is mislabeled as “Line A” in the sanitary/storm crossing label in the Profile view.
Corrective Action Required
09/21/2018

Submit an Engineer's Estimate of Probable Construction Costs.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
08/30/2018 Plans C.202
08/30/2018 Plans C.203
08/30/2018 Plans C.204
08/30/2018 Plans C.205
08/30/2018 Plans C.206
08/30/2018 Plans C.300
08/30/2018 Plans C.301
08/30/2018 Plans C.302
08/30/2018 Plans C.400
08/30/2018 Plans C.401
08/30/2018 Plans C.402
08/30/2018 Plans C.403
08/30/2018 Plans C.500
08/30/2018 Plans C.501
08/30/2018 Plans C.502
08/30/2018 Plans C.503
08/30/2018 Plans C.504
08/30/2018 Plans C.600
08/30/2018 Plans C.601
08/30/2018 Plans C.001
08/30/2018 Plans C.050
08/30/2018 Plans C.051
08/30/2018 Plans C.052
08/30/2018 Plans C.053
08/30/2018 Plans C.100
08/30/2018 Plans C.200
08/30/2018 Plans C.201
09/21/2018 Letter DE-Comment Letter (Engineering Plans)
01/09/2019 Letter DE-Comment Letter (Engineering Plans)
02/11/2019 Plans C.402
02/11/2019 Plans C.403
02/11/2019 Plans THE RESERVE AT STONEY CREEK 4TH PLAT 2-11-19 SANITARY
02/11/2019 Plans C.400
02/11/2019 Plans C.401
02/20/2019 Activity Document Fees PL2018156 The Reserve at Stoney Creek 4th Plat Sanitary
05/13/2019 Plans Binder1
07/18/2019 Letter DE-Engineering Plans Approval Letter
01/15/2021 SANITARY ASBUILTS
11/17/2021 Approved Plans The Reserve at Stoney Creek 4th Sanitary AsBuilts Accepted RD
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home