Planning Application Status

PL2018063




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2018063
Eagle Creek 16th Plat Street, Storm, MDP, ESC
Engineering Plan Review
Engineering Plan Review
Approved
04/20/2018
HUNT MIDWEST REAL EST DEV INC
Public Streets, Stormwater, Grading and Erosion Control
Locations
Address
2366 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2362 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2358 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2354 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2350 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2365 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2361 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2357 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2353 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2349 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2366 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2362 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2358 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2354 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2350 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2346 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2342 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2338 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2334 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2330 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2361 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2357 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2353 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2349 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2345 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2341 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2337 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2333 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2329 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2366 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2362 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2358 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2354 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2350 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2346 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2345 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2349 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2353 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2357 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2361 SW HICKORY LN, LEES SUMMIT, MO 64082

Property
69220052200000000

Property
69220051900000000

Property
69220051800000000

Property
69220052000000000

Property
69220052100000000

Property
69220051700000000

Property
69220051100000000

Property
69220051600000000

Property
69220051500000000

Property
69220051400000000

Property
69220051200000000

Property
69220051300000000

Property
69220051000000000

Property
69220050200000000

Property
69220050300000000

Property
69220050400000000

Property
69220050500000000

Property
69220050900000000

Property
69220050600000000

Property
69220050800000000

Property
69220050700000000

Property
69220042300000000

Property
69220042200000000

Property
69220042100000000

Property
69220042000000000

Property
69220041900000000

Property
69220041800000000

Property
69220041700000000

Property
69220041600000000

Property
69220041500000000

Property
69220041400000000

Property
69220040900000000

Property
69220041000000000

Property
69220041100000000

Property
69220041200000000

Property
69220041300000000

Property
69220011400000000

Property
69220011500000000

Property
69220011600000000

Property
69220011700000000

Property
69220011800000000

Address
2251 SW LADDERBACK DR, LEES SUMMIT, MO 64082

Contacts
HUNT MIDWEST REAL EST DEV INC, Address:8300 NE UNDERGROUND DR  
OLSSON , Address:7301 W 133RD ST STE 200, Phone:(913) 381-1170  
EAGLE CREEK HOMEOWNERS ASSOCIATION, Address:8300 NE UNDERGROUND DR  
FRANKLIN MARIA, Address:2345 SW HICKORY LN  
BULLARD VIRLEN & ROBERT, Address:2349 SW HICKORY LN  
FARRELL BRIAN & LAURA, Address:2353 SW HICKORY LN  
JOHNSON TREVELYN R, Address:2357 SW HICKORY LN  
LEBOURVREAU NICKOLAS & BRITTANY, Address:2361 SW HICKORY LN  
KOCH BENJAMIN D & KILEY B, Address:2346 SW HICKORY LN  
ROTHSCHILD BRIAN, Address:2350 SW HICKORY LN  
MCFARLAND DALTON BUILDERS INC, Address:120 SW MONROE ST  
WIEST TREVOR & LINDSAY, Address:2358 SW HICKORY LN  
BLAND JASON, Address:2362 SW HICKORY LN  
DICKERSON RONALD E, Address:2366 SW HICKORY LN  
TARTAGLIA JOSE SARRATUD, Address:2329 SW OLD PORT RD  
BARCLAY VICTORIA P, Address:7420 N DONNELLY AVE  
MCFADDEN JOHN III & AMANDA, Address:2337 SW OLD PORT RD  
GONZALEZ ROBERT M II & STEPHANIE K, Address:2508 SW HICKORY LN  
HEGELE PAUL F & JULIE P, Address:2345 SW OLD PORT RD  
DOZIER TAD & AMY, Address:2349 SW OLD PORT RD  
REASBY RICHARD, Address:2353 SW OLD PORT RD  
STOECKLEIN JEFFERY T & ANGELA L, Address:2357 SW OLD PORT RD  
BIRK TIMOTHY & SARAH, Address:2361 SW OLD PORT RD  
FORTE NATALIE A, Address:2330 SW OLD PORT RD  
SANCHEZ AMY, Address:2334 SW OLD PORT RD  
ULLOA CRLOS R & BARAHONA BRENDA Y, Address:2338 SW OLD PORT RD  
NIEHAUS ANDREW & MORGAN, Address:2342 SW OLD PORT RD  
LEACH KRISTIE N, Address:2346 SW OLD PORT RD  
BEX-BANJO OLUWASEYI, Address:2350 SW OLD PORT RD  
SALVA MITCHELL JOSEPH & ALEXIS D BRIDGES, Address:2354 SW OLD PORT RD  
JOHNSON NEIL & MICHELLE, Address:2358 SW OLD PORT RD  
ONUZURUIKE NGOZICHUKWUKA, Address:2362 SW OLD PORT RD  
JEWELL ETHAN & HOLLY, Address:2366 SW OLD PORT RD  
SIERRA DANIELLE, Address:2349 SW RIVER TRAIL RD  
BUCHHEIT TONI L, Address:2353 SW RIVER TRAIL RD  
SLEEK RUSSELL E JR & BEVERLY R, Address:2357 SW RIVER TRAIL RD  
MCFARLAND DALTON BUILDERS LLC, Address:120 SW MONROE ST  
MILLS GENA L & JOHN T, Address:2365 SW RIVER TRAIL RD  
SIMS RUSSELL A & HEIDI P, Address:2350 SW RIVER TRAIL RD  
CROSSWHITE MELISSA & JON, Address:2358 SW RIVER TRAIL RD  
BURNER MICHAEL & ANGELA, Address:2362 SW RIVER TRAIL RD  
LACKEY JASON AARON & AYSSA, Address:2366 SW RIVER TRAIL RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 08/09/2018 08/09/2018
Sue Pyles, P.E.
Traffic Review No Comments 08/09/2018 08/03/2018
Sue Pyles, P.E.
Engineering Review Corrections 07/30/2018 07/30/2018
Sue Pyles, P.E.
Corrective Action Required
07/30/2018

Label sidewalks along SW Ladderback Drive to be constructed by homeowner.
Corrective Action Required
07/30/2018

Revise the sidewalk quantity in the Estimate of Quantities on Sheet 2 and in the Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
07/30/2018

Provide 100-year WSEs at each lot corner along a swale.
Traffic Review No Comments 07/30/2018 07/30/2018
Michael Park
Traffic Review No Comments 07/09/2018 07/10/2018
Sue Pyles, P.E.
Engineering Review Corrections 07/09/2018 07/10/2018
Sue Pyles, P.E.
Corrective Action Required
07/10/2018

Revise line weights to clearly delineate sidewalk being constructed with this project from other sidewalk throughout the plan set.
Corrective Action Required
07/10/2018

The proposed sidewalk on SW Hickory Lane is shown terminating at the Lot 742/743 lot line. The City is now requiring that all sidewalks terminate in an accessible path to the street, so please include an ADA Sidewalk Ramp at this location. Include all design elevations, indicate that the ramp is to be constructed by the Developer, and include the City’s standard detail.
Corrective Action Required
07/10/2018

SW River Trail Road is shown connecting to a terminated street to the east. There is actually a temporary cul-de-sac at that location. Include the temporary cul-de-sac in the plan set and label it to be removed.
Corrective Action Required
07/10/2018

Sheet C114: The Top Elevations for FI 2-1 and FI 2-2 shown in the Drainage Tables don’t match the elevations shown in the Storm Sewer Profile. Please reconcile.
Corrective Action Required
07/10/2018

Sheet C115: • Review and revise the MBOE Table, as many of the elevations appear incorrect (i.e., Lot 734 Rear Left and Lot 735 Rear Right are the same point but have different MBOE elevations, Lot 737 Rear Right/Lot 738 Rear Left MBOEs are only 0.13 feet higher than the 100-year WSE when 2.0 feet is required). • Include allowable structure type of each lot. • Indicate the overflow path for Swale 1.
Corrective Action Required
07/10/2018

Sheet C121: Remove the Junction Box detail.
Corrective Action Required
07/10/2018

Submit the SWPPP, it was not included in the submittal.
Corrective Action Required
07/10/2018

Engineer’s Estimate of Probable Construction Costs: • Revise the asphalt depth to 6”. • Include items for base and stabilized subgrade. • The plans show 2 street signs and 1 stop sign to be installed at Hickory Lane and Ladderback Road, with all other signage existing. Revise the estimate accordingly. • Revise the sidewalk quantity. • Include an item for removal of the temporary cul-de-sac.
Corrective Action Required
07/10/2018

Update the Estimate of Quantities Table on Sheet C102 to match the revised estimate.
Traffic Review Approved with Conditions 05/11/2018 05/11/2018
Michael Park
Corrective Action Required
05/11/2018

Add Control Points (referenced on General Notes Sheet) to either the General Layout or Plan and Profile Sheets with ties to the horizontal alignments.
Engineering Review Corrections 05/11/2018 05/01/2018
Sue Pyles, P.E.
Corrective Action Required
05/01/2018

Sheet C102: • Revise General Note 3 to refer to Sheet C119 for Signage details. • Update the street sections to reflect current asphalt mix type requirements. • Add the 1’ dimension from back of curb to edge of base on the street sections.
Corrective Action Required
05/01/2018

Sheet C103: Label CI 1-3.
Corrective Action Required
05/01/2018

Sheet C104: Do the existing contours represent the topography today, or prior to other adjacent plats being developed? It appears that the grading shown doesn’t match the grading shown on the As-Constructed plans for eagle Creek 15th Plat. Verify and revise as needed.
Corrective Action Required
05/01/2018

Sheets C107-C109: • Show underdrain locations in the Profile views. • Revise sidewalk width to 5’ in Plan views. • Label sidewalk to be constructed by developer. • Proposed street designs don’t all appear to match with as-constructed street designs where proposed streets connect to existing streets. Verify and revise as needed.
Corrective Action Required
05/01/2018

Sheet C111: • Include vertical scale. • Include “Water” to the water crossing labels in the Profile view. • It doesn’t appear that the water/storm sewer crossings meet the minimum separation requirements. Revise as needed. • It appears that the utility easement for the storm sewer between structures 1-1 & 1-2 isn’t of adequate width. Revise as needed throughout the plan set as well as on all other associated plans and plat. • The existing slope shown downstream of Line 1. • The HGL(10) must be contained in the pipe. Please revise. • Why is a flat top MH required for MH 1-6?
Corrective Action Required
05/01/2018

Sheet C112: • Include vertical scale. • The HGL(10) must be contained in the pipe. Please revise. • FI 2-1 & 2-2 are indicated to be in sump conditions in the drainage tables. If this is the intent, revise both Plan and Profile views and Grading Plan to indicate the sump. If sump, why only open on one side? Revise as needed.
Corrective Action Required
05/01/2018

Sheet C113: Label CI 1-3.
Corrective Action Required
05/01/2018

Sheet C114: • Upstream Top Elevations appear incorrect for FI 1-6, MH 1-6, and FI 2-2. Revise as needed. • Verify HGL(100) elevations and revise as needed. • Verify all by-pass flow is accounted for in the drainage tables. It appears that the flow bypassing CI 1-10 should be captured in CI 1-8 per the drainage area boundary for CI 1-8.
Corrective Action Required
05/01/2018

Sheet C115: • Include 100-yr WSEs associated with swales and Field Inlets on the Plan view. • Include swale locations and information.
Corrective Action Required
05/01/2018

Sheet C116: • Clearly show the Sediment Trap Top of Dam in the Plan view. • Identify the Sediment Trap Emergency Spillway in the Plan view. • Include the location of the Sediment Trap Stone Outlet in the Plan view and indicate the D(50) design.
Corrective Action Required
05/01/2018

Sheets C116-C118: No diversion berms are shown. If they will not be utilized, please remove from the Legend.
Corrective Action Required
05/01/2018

Sheet C119: Remove the End of Road Treatment detail as it is not required.
Corrective Action Required
05/01/2018

Sheets C121 & C122: • Remove the Junction Box standard detail, it is not required for this project. • Add Lee’s Summit standard detail for MH, Curb & Gutter, and Sidewalk. • Add KC APWA standard details for all erosion and sediment control items. The details must be included, not just referenced. • There is an error in the Storm MH Cover detail. The word “MADE” on the cover is upside down.
Corrective Action Required
05/01/2018

Submit the SWPPP.
Corrective Action Required
05/01/2018

Engineer’s Estimate of Probable Construction Costs: • Revise asphalt depth to 6” to match the plans. • Include items for base and stabilized subgrade. • Verify quantities for Curb & Gutter and Concrete Sidewalks. Revise as needed. • Revise sidewalk width to 5’ to match the plans.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
04/24/2018 Plans 2018_04_20_Eagle_Creek_16th_Street_Storm_Erosion_Contol_Plans
06/29/2018 Plans 2018_06_29_Street_Storm 13
06/29/2018 Plans 2018_06_29_Street_Storm 14
06/29/2018 Plans 2018_06_29_Street_Storm 15
06/29/2018 Plans 2018_06_29_Street_Storm 16
06/29/2018 Plans 2018_06_29_Street_Storm 17
06/29/2018 Plans 2018_06_29_Street_Storm 18
06/29/2018 Plans 2018_06_29_Street_Storm 19
06/29/2018 Plans 2018_06_29_Street_Storm 20
06/29/2018 Plans 2018_06_29_Street_Storm 21
06/29/2018 Plans 2018_06_29_Street_Storm 22
06/29/2018 Plans 2018_06_29_Street_Storm 23
06/29/2018 Plans 2018_06_29_Street_Storm 1
06/29/2018 Plans 2018_06_29_Street_Storm 2
06/29/2018 Plans 2018_06_29_Street_Storm 3
06/29/2018 Plans 2018_06_29_Street_Storm 4
06/29/2018 Plans 2018_06_29_Street_Storm 5
06/29/2018 Plans 2018_06_29_Street_Storm 6
06/29/2018 Plans 2018_06_29_Street_Storm 7
06/29/2018 Plans 2018_06_29_Street_Storm 8
06/29/2018 Plans 2018_06_29_Street_Storm 9
06/29/2018 Plans 2018_06_29_Street_Storm 10
06/29/2018 Plans 2018_06_29_Street_Storm 11
06/29/2018 Plans 2018_06_29_Street_Storm 12
07/10/2018 Letter DE-Comment Letter (Engineering Plans)
07/31/2018 Letter DE-Comment Letter (Engineering Plans)
07/23/2018 Plans C106 SWALE PLAN & PROFILE
07/23/2018 Plans C105 SWALE PLAN & PROFILE
07/23/2018 Plans C104 GRADING PLAN
07/23/2018 Plans C103 GENERAL LAYOUT
07/23/2018 Plans C102 GENERAL NOTES
07/23/2018 Plans C101 TITLE SHEET
07/23/2018 Plans C123 EROSION CONTROL DETAILS
07/23/2018 Plans C122 STORM DETAIL
07/23/2018 Plans C121 STORM DETAIL
07/23/2018 Plans C120 DETAIL SHEET
07/23/2018 Plans C119 SIGNAGE PLAN
07/23/2018 Plans C118 EROSION CONTROL PLAN - PHASE 3
07/23/2018 Plans C117 EROSION CONTROL PLAN - PHASE 2
07/23/2018 Plans C116 EROSION CONTROL PLAN - PHASE 1
07/23/2018 Plans C115 MASTER DRAINAGE PLAN
07/23/2018 Plans C114 DRAINAGE TABLES
07/23/2018 Plans C113 DRAINAGE PLAN
07/23/2018 Plans C112 STORM SEWER PLAN & PROFILE
07/23/2018 Plans C111 STORM SEWER PLAN & PROFILE
07/23/2018 Plans C110 INTERSECTION DETAILS
07/23/2018 Plans C109 ROADWAY PLAN & PROFILE
07/23/2018 Plans C108 ROADWAY PLAN & PROFILE
07/23/2018 Plans C107 ROADWAY PLAN & PROFILE
08/13/2018 Activity Document C115 MASTER DRAINAGE PLAN
05/14/2018 Letter DE-Comment Letter (Engineering Plans)
08/29/2019 Plans C121 - Detail Sheet
08/29/2019 Plans C120 - Storm Sewer Details
09/12/2019 Letter Permit extension waiver request
09/16/2019 Activity Document Fees PL2018063 Eagle Creek 16th Plat Street, Storm, MDP, ESC
09/16/2019 Letter DE-Engineering Plans Approval Letter
06/01/2020 Plans 20-06-01_Eagle_Creek_16_Street_&_Storm_As-built_Plans
11/17/2021 Accepted Record Drawings Eagle Creek 16th Street Storm MDP ESC AsBuilts Accepted RD
08/02/2018 Plans C101 TITLE SHEET
08/02/2018 Plans C102 GENERAL NOTES
08/02/2018 Plans C103 GENERAL LAYOUT
08/02/2018 Plans C104 GRADING PLAN
08/02/2018 Plans C105 SWALE PLAN & PROFILE
08/02/2018 Plans C106 SWALE PLAN & PROFILE
08/02/2018 Plans C107 ROADWAY PLAN & PROFILE
08/02/2018 Plans C108 ROADWAY PLAN & PROFILE
08/02/2018 Plans C109 ROADWAY PLAN & PROFILE
08/02/2018 Plans C110 INTERSECTION DETAILS
08/02/2018 Plans C111 STORM SEWER PLAN & PROFILE
08/02/2018 Plans C112 STORM SEWER PLAN & PROFILE
08/02/2018 Plans C113 DRAINAGE PLAN
08/02/2018 Plans C114 DRAINAGE TABLES
08/02/2018 Plans C115 MASTER DRAINAGE PLAN
08/02/2018 Plans C116 EROSION CONTROL PLAN - PHASE 1
08/02/2018 Plans C117 EROSION CONTROL PLAN - PHASE 2
08/02/2018 Plans C118 EROSION CONTROL PLAN - PHASE 3
08/02/2018 Plans C119 SIGNAGE PLAN
08/02/2018 Plans C120 DETAIL SHEET
08/02/2018 Plans C121 STORM DETAIL
08/02/2018 Plans C122 STORM DETAIL
08/02/2018 Plans C123 EROSION CONTROL DETAILS
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home