Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
Approved with Conditions
|
11/14/2017
|
11/10/2017
|
|
Sue Pyles, P.E.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $3,780.02 (which is based on 3% of the total infrastructure cost plus a water test inspection fee) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private pavement sections shall either follow Article 12 of the UDO or Table LS-2 or LS-3 of the Design & Construction Manual for pavement thickness and base requirements.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
|
|
DE Contact ROW Inspector
Corrective Action Required
Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Fire Review
|
Approved with Conditions
|
11/14/2017
|
11/09/2017
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
|
|
Imposed Loads
Corrective Action Required
IFC 503.2.3 -Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
For information only.
|
|
|
Traffic Review
|
No Comments
|
11/14/2017
|
11/07/2017
|
|
Michael Park
|
|
|
Planning Review
|
No Comments
|
11/14/2017
|
11/07/2017
|
|
Victoria Nelson
|
|
|
Planning Review
|
Corrections
|
10/26/2017
|
10/30/2017
|
|
Victoria Nelson
|
|
Corrective Action Required
Exterior materials:
Wood is a conditional material only approvable by the Planning Commission and City Council through a Prelimanry Development Plan Public Hearing Process. Staff cannot approve the proposed engineered wood material.
An Alternate material that can be administrative pproved by the staff is a wood grain fiber cement product.
Please see Article 7 of the UDO for other approved materials.
|
|
Corrective Action Required
Fire lane:
The site plan does not call out a fire lane. The details sheet only calls out light duty asphalt.
A fire lane is required to be designed to a standard to support the weight of fire equipment.
Please see Article 12 in the UDO, section 12.120 F, fo rthe heavy duty design standards.
|
|
|
Engineering Review
|
Corrections
|
10/26/2017
|
10/26/2017
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Revise the Engineer's Estimate of Probable Construction Costs to include individual erosion control items, as well as concrete flume, sidewalk, and ADA-ramp.
|
|
Corrective Action Required
ADA detectable warnings are not required at a commercial entrance. Please revise.
|
|
Corrective Action Required
Include appropriate erosion protection downstream of the flume discharge. Include standard details in plan set.
|
|
|
Traffic Review
|
No Comments
|
10/26/2017
|
10/23/2017
|
|
Michael Park
|
|
|
Fire Review
|
Approved with Conditions
|
10/26/2017
|
10/23/2017
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
|
|
Imposed Loads
Corrective Action Required
IFC 503.2.3 -Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
For information only.
|
|
|
Engineering Review
|
Corrections
|
10/02/2017
|
10/02/2017
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Include pavement design meeting the requirements of Unified Development Ordinance (UDO) Article 12, "Parking".
|
|
Corrective Action Required
Provide a pavement design for the commercial entrance (i.e., now labeled as "private street"), and ensure it follows the standards for a commercial collector in Section 5200 of the Design and Construction Manual, Table LS-2 or LS-3. Ensure the entrance is constructed of 8" KCMMB from the sawcut in the pavement, to the right of way line.
|
|
Corrective Action Required
Please provide a specific design (i.e., not a generic design) of each ADA-accessible ramp within the right of way, which includes the fourteen (14) bullet poiint design details contained in Section 5304.8. Ensure the design meets the standards listed on Table LS-5 of Section 5300.
|
|
Corrective Action Required
Label the wye to be cut in at the connection to the existing sanitary sewer.
|
|
Corrective Action Required
Include energy dissipation at the flume discharge to prevent erosion.
|
|
Corrective Action Required
Provide the SWPPP.
|
|
Corrective Action Required
Consider relocating the trash enclosure. The current location could cause safety concerns if used when vehicles are present.
|
|
Corrective Action Required
Non-Setback Curb Inlets are not allowed, please revise.
|
|
Corrective Action Required
Provide separation at the water line - storm sewer crossing.
|
|
Corrective Action Required
Include a fire line with backflow preventor vault.
|
|
Corrective Action Required
Remove reference to Johnson County Wastewater from Utility Note 7.
|
|
Corrective Action Required
Review details to be either City of Lee's Summit or APWA current details, or private details that meet the City requirements. Delete the City of olathe Non-Setback Curb Inlet detail.
|
|
Corrective Action Required
Submit an Engineer's Estimate of Probable Construction Costs.
|
|
|
Traffic Review
|
Corrections
|
10/02/2017
|
09/29/2017
|
|
Michael Park
|
|
Corrective Action Required
Connect to the shared driveway.
|
|
Corrective Action Required
Recommend moving the drive thru to the opposite side of the building to minimize conflicts with walk-up, employee, and other traffic.
|
|
Corrective Action Required
Add a bike rack and consider seating area.
|
|
|
Planning Review
|
Corrections
|
10/02/2017
|
09/29/2017
|
|
Victoria Nelson
|
|
Corrective Action Required
Data Table:
- Add FAR- see Sec 5.270 of the City's Unified Development Ordinance (UDO)
- Add Impervious Coverage Square Footage and Percentage
|
|
Corrective Action Required
Trash Enclosure:
Provide a detail for the proposed trash enclosure. The enclosure shall be constructed of masonry walls and solid steel gates painted a color complementary to the enclosure walls and building the enclosure serves.
|
|
Corrective Action Required
Mechanical equipment:
- Roof-top equipment is showing on south building elevation-see Sec 7.180.E.
- Dash in the RTU on the west building elevation on Sheet A-201.
|
|
Corrective Action Required
Material:
The building elevations show the use of wood lap siding. Wood is not an allowed building material that staff can approve. Wood may only be used with Planning Commission and City Council approval through the public hearing process. Staff suggests using a fiber cement lap siding as an alternate material to achieve a wood appearance. Other approved materials-see Sec 7.170.
|
|
Corrective Action Required
Lighting:
- No lighting information is provided or shown on the plans. Parking lot lighting shall be provided in accordance with Section 7.250. Are any wallpacks proposed? Show parking lot lighting and wallpacks on the site plan and building elevations as appropriate.
- A photometric plan shall be provided in accordance with Sectino 7.230.
- Cut sheets for all exterior light fixtures shall be provided for review and approval. See Sections 7.220 through 7.270 for all exterior lighting requirements.
|
|
Corrective Action Required
Surrounding property information:
Label the existing zoning and land use information for the adjacent properties to the east and south.
|
|
Corrective Action Required
Signage:
Will you have any way-finding or monumnet signs? All signage will comply with the requirements of Article 13 of the UDO.
|
|
Corrective Action Required
ADA Signage:
Revise the handicapped sign detail on Sheet C7 to indicate a mounting height of 3' minimum and 5' maximum above grade, measured to the bottom of the sign.
|
|
Corrective Action Required
A-201 Scale:
Scale is labeled incorrectly on J13 and A13
|
|
Corrective Action Required
Lot Line:
Please make lot line darker to emphasize seperation between Lots 4 and 5.
|
|
Corrective Action Required
Recommendations:
Sidewalk connection from proposed sidewalk along SW Lemans Lane to building?
Sidewalk connection between building and parking to designate safe crossing for pedestrians to cross drive-through?
Installing some type of outdoor seating?
Installing a bike rack?
|
|
Corrective Action Required
PAVEMENT DETAIL. Provide a parking lot pavement detail. The pavement design is governed by Section 12.120.F.
|
|
Corrective Action Required
PARKING LOT SCREENING. Parking lot screening shall be provided along the north side facing M-150 Hwy. Screening shall be provided to a height of 2.5' using evergreen shrubs at a rate of 12 shrubs for every 40 linear feet of parking lot frontage.
|
|
Corrective Action Required
SCALE. Correct the listed scale for the north and south elevations on Sheet A-201. The scale is listed as 3"=1', rather than the correct scale of 3/8"=1'. The east and west elevations list the correct scale.
|
|
Corrective Action Required
PARKING LOT CONNECTIVITY. As discussed in the pre-application meeting, the proposed parking lot needs to provide a connection to the existing shared driveway access currently serving the bank to the west. The shared drive/cross-access between the bank lot, the subject lot and the vacant lot to the east was shown and approved on the preliminary development plan for the center.
|
|
|
Fire Review
|
Approved with Conditions
|
10/02/2017
|
09/26/2017
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
|
|
Imposed Loads
Corrective Action Required
IFC 503.2.3 -Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
For information only.
|
|
|