Planning Application Status

PL2017201




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2017201
SCOOTERS COFFEE
Commercial Final Development Plan
Commercial Final Development Plan
Approved
09/18/2017
RAINTREE INVESTORS LLC
Locations
Contacts
FREEDOM ENTERPRISES LLC, Address:4501 COLLEGE BLVD #170, Phone:(913) 369-5828  
PHELPS ENGINEERING, INC, Address:1270 N WINCHESTER RD, Phone:(913) 393-1155  
[K] WARMAN ARCHITECTS, Address:1828 SWIFT, SUITE 101, Phone:(816) 474-2233  
RAINTREE INVESTORS LLC, Address:7387 W 162ND ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 11/14/2017 11/10/2017
Sue Pyles, P.E.
DE Engineers Estimate
Corrective Action Required
11/10/2017

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $3,780.02 (which is based on 3% of the total infrastructure cost plus a water test inspection fee) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
DE C&O #11 Pavement Thickness
Corrective Action Required
11/10/2017

Private pavement sections shall either follow Article 12 of the UDO or Table LS-2 or LS-3 of the Design & Construction Manual for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
11/10/2017

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
11/10/2017

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
11/10/2017

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review Approved with Conditions 11/14/2017 11/09/2017
Jim Eden
Code Statement
Corrective Action Required
11/07/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Imposed Loads
Corrective Action Required
11/07/2017

IFC 503.2.3 -Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. For information only.
Traffic Review No Comments 11/14/2017 11/07/2017
Michael Park
Planning Review No Comments 11/14/2017 11/07/2017
Victoria Nelson
Planning Review Corrections 10/26/2017 10/30/2017
Victoria Nelson
Corrective Action Required
10/23/2017

Exterior materials: Wood is a conditional material only approvable by the Planning Commission and City Council through a Prelimanry Development Plan Public Hearing Process. Staff cannot approve the proposed engineered wood material. An Alternate material that can be administrative pproved by the staff is a wood grain fiber cement product. Please see Article 7 of the UDO for other approved materials.
Corrective Action Required
10/30/2017

Fire lane: The site plan does not call out a fire lane. The details sheet only calls out light duty asphalt. A fire lane is required to be designed to a standard to support the weight of fire equipment. Please see Article 12 in the UDO, section 12.120 F, fo rthe heavy duty design standards.
Engineering Review Corrections 10/26/2017 10/26/2017
Sue Pyles, P.E.
Corrective Action Required
10/26/2017

Revise the Engineer's Estimate of Probable Construction Costs to include individual erosion control items, as well as concrete flume, sidewalk, and ADA-ramp.
Corrective Action Required
10/26/2017

ADA detectable warnings are not required at a commercial entrance. Please revise.
Corrective Action Required
10/26/2017

Include appropriate erosion protection downstream of the flume discharge. Include standard details in plan set.
Traffic Review No Comments 10/26/2017 10/23/2017
Michael Park
Fire Review Approved with Conditions 10/26/2017 10/23/2017
Jim Eden
Code Statement
Corrective Action Required
10/19/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Imposed Loads
Corrective Action Required
10/19/2017

IFC 503.2.3 -Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. For information only.
Engineering Review Corrections 10/02/2017 10/02/2017
Sue Pyles, P.E.
Corrective Action Required
10/02/2017

Include pavement design meeting the requirements of Unified Development Ordinance (UDO) Article 12, "Parking".
Corrective Action Required
10/02/2017

Provide a pavement design for the commercial entrance (i.e., now labeled as "private street"), and ensure it follows the standards for a commercial collector in Section 5200 of the Design and Construction Manual, Table LS-2 or LS-3. Ensure the entrance is constructed of 8" KCMMB from the sawcut in the pavement, to the right of way line.
Corrective Action Required
10/02/2017

Please provide a specific design (i.e., not a generic design) of each ADA-accessible ramp within the right of way, which includes the fourteen (14) bullet poiint design details contained in Section 5304.8. Ensure the design meets the standards listed on Table LS-5 of Section 5300.
Corrective Action Required
10/02/2017

Label the wye to be cut in at the connection to the existing sanitary sewer.
Corrective Action Required
10/02/2017

Include energy dissipation at the flume discharge to prevent erosion.
Corrective Action Required
10/02/2017

Provide the SWPPP.
Corrective Action Required
10/02/2017

Consider relocating the trash enclosure. The current location could cause safety concerns if used when vehicles are present.
Corrective Action Required
10/02/2017

Non-Setback Curb Inlets are not allowed, please revise.
Corrective Action Required
10/02/2017

Provide separation at the water line - storm sewer crossing.
Corrective Action Required
10/02/2017

Include a fire line with backflow preventor vault.
Corrective Action Required
10/02/2017

Remove reference to Johnson County Wastewater from Utility Note 7.
Corrective Action Required
10/02/2017

Review details to be either City of Lee's Summit or APWA current details, or private details that meet the City requirements. Delete the City of olathe Non-Setback Curb Inlet detail.
Corrective Action Required
10/02/2017

Submit an Engineer's Estimate of Probable Construction Costs.
Traffic Review Corrections 10/02/2017 09/29/2017
Michael Park
Corrective Action Required
09/29/2017

Connect to the shared driveway.
Corrective Action Required
09/29/2017

Recommend moving the drive thru to the opposite side of the building to minimize conflicts with walk-up, employee, and other traffic.
Corrective Action Required
09/29/2017

Add a bike rack and consider seating area.
Planning Review Corrections 10/02/2017 09/29/2017
Victoria Nelson
Corrective Action Required
09/29/2017

Data Table: - Add FAR- see Sec 5.270 of the City's Unified Development Ordinance (UDO) - Add Impervious Coverage Square Footage and Percentage
Corrective Action Required
09/29/2017

Trash Enclosure: Provide a detail for the proposed trash enclosure. The enclosure shall be constructed of masonry walls and solid steel gates painted a color complementary to the enclosure walls and building the enclosure serves.
Corrective Action Required
09/29/2017

Mechanical equipment: - Roof-top equipment is showing on south building elevation-see Sec 7.180.E. - Dash in the RTU on the west building elevation on Sheet A-201.
Corrective Action Required
09/29/2017

Material: The building elevations show the use of wood lap siding. Wood is not an allowed building material that staff can approve. Wood may only be used with Planning Commission and City Council approval through the public hearing process. Staff suggests using a fiber cement lap siding as an alternate material to achieve a wood appearance. Other approved materials-see Sec 7.170.
Corrective Action Required
09/29/2017

Lighting: - No lighting information is provided or shown on the plans. Parking lot lighting shall be provided in accordance with Section 7.250. Are any wallpacks proposed? Show parking lot lighting and wallpacks on the site plan and building elevations as appropriate. - A photometric plan shall be provided in accordance with Sectino 7.230. - Cut sheets for all exterior light fixtures shall be provided for review and approval. See Sections 7.220 through 7.270 for all exterior lighting requirements.
Corrective Action Required
09/29/2017

Surrounding property information: Label the existing zoning and land use information for the adjacent properties to the east and south.
Corrective Action Required
09/29/2017

Signage: Will you have any way-finding or monumnet signs? All signage will comply with the requirements of Article 13 of the UDO.
Corrective Action Required
09/29/2017

ADA Signage: Revise the handicapped sign detail on Sheet C7 to indicate a mounting height of 3' minimum and 5' maximum above grade, measured to the bottom of the sign.
Corrective Action Required
09/29/2017

A-201 Scale: Scale is labeled incorrectly on J13 and A13
Corrective Action Required
09/29/2017

Lot Line: Please make lot line darker to emphasize seperation between Lots 4 and 5.
Corrective Action Required
09/29/2017

Recommendations: Sidewalk connection from proposed sidewalk along SW Lemans Lane to building? Sidewalk connection between building and parking to designate safe crossing for pedestrians to cross drive-through? Installing some type of outdoor seating? Installing a bike rack?
Corrective Action Required
10/04/2017

PAVEMENT DETAIL. Provide a parking lot pavement detail. The pavement design is governed by Section 12.120.F.
Corrective Action Required
10/04/2017

PARKING LOT SCREENING. Parking lot screening shall be provided along the north side facing M-150 Hwy. Screening shall be provided to a height of 2.5' using evergreen shrubs at a rate of 12 shrubs for every 40 linear feet of parking lot frontage.
Corrective Action Required
10/04/2017

SCALE. Correct the listed scale for the north and south elevations on Sheet A-201. The scale is listed as 3"=1', rather than the correct scale of 3/8"=1'. The east and west elevations list the correct scale.
Corrective Action Required
10/04/2017

PARKING LOT CONNECTIVITY. As discussed in the pre-application meeting, the proposed parking lot needs to provide a connection to the existing shared driveway access currently serving the bank to the west. The shared drive/cross-access between the bank lot, the subject lot and the vacant lot to the east was shown and approved on the preliminary development plan for the center.
Fire Review Approved with Conditions 10/02/2017 09/26/2017
Jim Eden
Code Statement
Corrective Action Required
09/26/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Imposed Loads
Corrective Action Required
09/26/2017

IFC 503.2.3 -Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. For information only.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 09/18/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
09/18/2017 Receipt Receipt for transaction: 2017-006418
09/18/2017 Letter Routing Sheet - FDP
10/04/2017 Letter Applicant Letter - FDP (DFDP)
10/19/2017 Letter Resubmittal Routing Sheet - FDP
10/20/2017 Letter Resubmittal Routing Sheet - FDP
10/20/2017 2017-10-18 Scooter's Lee's Summit Civil
10/20/2017 OPC
10/20/2017 SWPPP
10/30/2017 Letter Applicant Letter - FDP (DFDP)
11/06/2017 Letter Resubmittal Routing Sheet - FDP
11/06/2017 5233_Scooters LSMO_Construction Set_110217
11/10/2017 Letter Applicant Letter - FDP (DFDP)
12/01/2017 Drawing SCOOTERS ELEVATION
12/01/2017 Drawing Scooters Lees Smt LS1
12/01/2017 Drawing Scooters Lees Smt LS2
12/01/2017 Drawing Scooters site plan
01/19/2018 Activity Document Fees PL2017201 Scooters Coffee FDP
09/09/2019 Scooters
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home