Review Type |
Outcome |
Est. Completion Date |
Completed |
Traffic Review
|
No Comments
|
08/18/2017
|
08/21/2017
|
|
Michael Park
|
|
|
Engineering Review
|
No Comments
|
08/18/2017
|
08/18/2017
|
|
Gene Williams, P.E.
|
|
|
Traffic Review
|
Corrections
|
06/27/2017
|
06/29/2017
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
The advisory speed sign (W13-1P) should replace the R2-1 under the roundabout warning signs. The advisory speed should be 15 mph or 20 mph depending on the circulating design speed and should be the same for all approaches.
|
|
Corrective Action Required
The street name signs within the roundabout shall include the arrow detail as shown on the City's sign standard details.
|
|
|
Engineering Review
|
Corrections
|
06/27/2017
|
06/29/2017
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Please refer to comment #11 of the previous applicant letter dated May 19, 2017 (hereinafter referred to as "the comment letter"). It does not appear that underdrain locations were specified.
|
|
Corrective Action Required
Please refer to comment #14 and #15 of the comment letter. There are fourteen (14) bullet point items contained in Secton 5304.8 of the Design and Construction Manual, that are required for design details for ADA-accessible ramps. Please refer to the new City website for standard detail drawings showing how these should be presented.
|
|
Corrective Action Required
Please refer to comment #19 of the comment letter. It appears the underdrain location was not shown.
|
|
Corrective Action Required
Please refer to comment #23 of the comment letter. ADA-accessible ramp details were not shown in accordance with Section 5304.8. Please refer to the new City standard detail for a "go-by" showing how these ramps should be presented in the plans. Each ramp must have a specific design (i.e., not a generic design).
|
|
Corrective Action Required
Please refer to comment #24 of the previous comment letter. Hydraulic grade lines were presented for the 10 year event, but this is a collector roadway. At a minimum, the 25 year event should be presented, with overflow routes for the 100 year event established.
|
|
|
Engineering Review
|
Corrections
|
05/19/2017
|
05/19/2017
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Sheet C1.0: Please add a note stating "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail."
|
|
Corrective Action Required
Sheet C2.0: The alignment plan appears to be missing the sidewalk along the northeast side of the new development. Please show the location of the existing sidewalk in this area.
|
|
Corrective Action Required
Sheet C2.0: The Detention Basin should be labeled as "Retention Basin", and a note should be provided referencing the plan set where details are contained.
|
|
Corrective Action Required
Sheet C3.0: Concrete sidewalk is shown with a design cross-slope of 1.75%. As per Section 5304.8 of the Design and Construction Manual, Table LS-5, the design slope must be 1.5%.
|
|
Corrective Action Required
Sheet C3.0: Please show the dimension for the area one (1) foot beyond the back of curb. The extension is shown, but the dimension is missing.
|
|
Corrective Action Required
Sheet C3.0: The sidewalk section view is missing the 4" minimum thickness leveling course.
|
|
Corrective Action Required
Sheet C3.0: Type B curb and gutter is called-out. This should be specified as CG-1.
|
|
Corrective Action Required
Sheet C3.0: Please label the aggregate base course as 6" MoDOT Type 5.
|
|
Corrective Action Required
Please be aware that all landscaping, decorative paver stones, permeable pavers, and irrigation systems must be included in a license agreement with the City and the owner. The City shall not maintain these features.
|
|
Corrective Action Required
General Comment: Pavement underdrain detail was not shown in the detail section. Please insert the City standard detail contained on our website. Please ensure the plan view shows the location of the curb inlets where these underdrains will be connected.
|
|
Corrective Action Required
Sheet C3.1: It appears an underdrain is required near station 5+00 and station 1+00.
|
|
Corrective Action Required
All Sheets with Commercial Entrances: Please show these features as being constructed with 8" KCMMB 4K mix.
|
|
Corrective Action Required
Sheet C3.1: It appears additional sidewalk should be shown (existing) at the intersection of SE Bailey Rd. and SE Decker St., extended to the east.
|
|
Corrective Action Required
General Comment: All ADA-accessible ramps and ADA-accessible ways must have a specific detail associated with them. Please show the locations of these features, and provide a call-out on the plan view with a specific reference to the sheet number and detail number.
|
|
Corrective Action Required
General Comment Concerning the ADA-Accessible Ramps and ADA-Accessible Ways: The specific details of these features must include, at a minimum, the design details specified in Section 5304.8 of the Design and Construction Manual. Elevation call-outs, although required, are not sufficient. Other design details specified in this section are required, including slope call-outs which comply with the criteria listed in Table LS-5, and section views specified in 5304.8.
|
|
Corrective Action Required
Sheet C3.2: It appears underdrains are required near station 2+50 and 6+10.
|
|
Corrective Action Required
Sheet C3.3: A storm line is shown with the note, "install under separate cover". Please revise the language to state "install as per separate Mass Grading and Stormwater Plans", or equivalent language.
|
|
Corrective Action Required
Sheet C3.3: It appears an underdrain is required near the RCB.
|
|
Corrective Action Required
Sheet C3.3: The profile view shows an RCB. Please provide a note, "to be installed as per the Mass Grading and Stormwaer Plans", or equivalent language.
|
|
Corrective Action Required
Sheet C3.3: The tie-in to 16th St. should be noted a bit clearer. Perhaps with a note stating "see 16th St. Improvements Plans", or equivalent language?
|
|
Corrective Action Required
Sheet C4.1: There are several notes concerning the installation of pavement underdrains. It is not clear where these features are draining. Please show where these underdrains are connected. Typically, these underdrains are connected between curb inlets. There may be other methods, but they should be clearly shown on the plans.
|
|
Corrective Action Required
Roundabout Details: Ensure that the ADA-accessible ramps, and ADA-accessible ways are detailed in accordance with Secton 5304.8 of the Design and Construction Manual. There is not enough information on the roundabout design to ensure these features are designed to the minimum standard.
|
|
Corrective Action Required
Sheet C8.1: Please show (graphically) the hydraulic grade line for the design storm.
|
|
Corrective Action Required
Sheet 8.1: What does the note "refer to Public Road Plan Set for Structures 100-107" mean? We do not have such plans in our possession with this tite. In addition, it appears some of these structures are shown within this particular plan set.
|
|
Corrective Action Required
Sheet C8.5: The pipe embedment detail does not appear to follow the City of Lee's Summit standard. Please revise.
|
|
Corrective Action Required
Detail Sheets: It appeared the details were missing for manhole frame and lids, showing the standard City of Lee's Summit lettering for "Storm".
|
|
Corrective Action Required
Sheet C10.2: The trench and fill technique for placement of silt fence is not allowed. All silt fence must be machine-laid using the slit method.
|
|
Corrective Action Required
Sheet C11.1: The curb and gutter details should reference CG-1 and CG-2, not type A, Type B, or Type C.
|
|
Corrective Action Required
Sheet C11.2: Joint Seal detail does not appear to be used on this project? If not, then please remove it.
|
|
Corrective Action Required
Sheet L1.3: A planting schedule is provided for the detention basin, but no locations for the plantings are shown. Please show where the plantings will be located within the retention basin.
|
|
Corrective Action Required
All Sheets: Please re-name "detention basin" to "retention basin".
|
|
Corrective Action Required
Sheet L2.1: Irrigation details were provided, but it did not appear a plan view was included showing where these features were located. Again, any landscaping features, irrigation systems, etc. within the right of way will require the execution of a license agreement between the City and the owner. The City shall not maintain these features.
|
|
Corrective Action Required
An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings.
|
|
|
Traffic Review
|
Corrections
|
05/19/2017
|
05/18/2017
|
|
Michael Park
|
|
Corrective Action Required
Align the centerline of proposed Summit Street with existing Summit Street at 16th Street. This may require a compound horizontal curve.
|
|
Corrective Action Required
Submit exhibits (separate from the engineering plans) depicting the required vehicle turning movements at the roundabout and speed profiles per the Design and Construction Manual design criteria for roundabout design to support the roundabout design (lane widths, diameter, entry angles, splitter islands, etc.).
|
|
Corrective Action Required
The median island (triangle) shown at the right-in/right-out may be removed since the median along Decker Street provides the access control.
|
|
Corrective Action Required
Note that all symbols, stop lines, yield lines, crosswalk markings, diagonals shall be preformed theromplastic per Design and Construction Manual. All longitudinal lines shall be high-build paint.
|
|
Corrective Action Required
The curb design is unclear between the edge of pavement and truck apron around the roundabout.
|
|
Corrective Action Required
The splitter island material leading to the crosswalk is unclear. This should not be asphalt.
|
|
Corrective Action Required
A more detailed review of the signing and marking for the roundabout will be completed upon resubmittal that addresses other comments, but no significant concerns were identified in this regard.
|
|
|