Planning Application Status

PL2016223




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2016223
MERIDIAN AT VIEW HIGH APARTMENTS (VILLAGE AT VIEW HIGH)
Residential Final Development Plan
Residential Final Development Plan
Approved
12/22/2016
PARROT PROPERTIES INC - John Bondon
Locations
Contacts
ARCHVIEW INVESTORS, LLC, Address:8335 KEYSTONE CROSSING, SUITE 220, Phone:(317) 574-1600  
PARROT PROPERTIES INC - John Bondon, Address:11303 VIEW HIGH DR, Phone:(816) 616-2208  
PHELPS ENGINEERING, INC, Address:1270 N WINCHESTER RD, Phone:(913) 393-1155  
SHERRY CAMPBELL, Address:8335 KEYSTONE CROSSING STE 220, Phone:(317) 574-1600  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 07/31/2017 02/16/2018
Jennifer Thompson
Engineering Review Approved with Conditions 07/31/2017 02/16/2018
Gene Williams, P.E.
DE Contact Field Eng. Inspector
Corrective Action Required
02/16/2018

Contact Steve Robbins of Development Services Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE C&O #12 Cut & Fill
Corrective Action Required
02/16/2018

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
DE Future Repair Work
Corrective Action Required
02/16/2018

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE Engineers Estimate
Corrective Action Required
02/16/2018

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $92,444.35 (which is based on 3% of the total infrastructure cost plus a water test inspection fee) has been paid.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
02/16/2018

If ground breaking will take place prior to issuance of a building permit, please submit a Land Disturbance Permit Application and the required attachments and fees to the City.
Traffic Review No Comments 07/31/2017 07/24/2017
Jennifer Thompson
Fire Review Approved with Conditions 07/31/2017 07/24/2017
Jennifer Thompson
Misc.
Corrective Action Required
07/24/2017

Revised plans to remove the exterior stairs on the north side of Building #9. Revised plans are approved.
Engineering Review Corrections 07/13/2017 07/13/2017
Gene Williams, P.E.
Corrective Action Required
07/13/2017

Please refer to the previous applicant letter. The grading to the northwest of the sweeping bend of Kessler Dr. must match the plans prepared by Engineering Solutions dated July 10, 2017. As shown, the grading to the northwest of the sweeping bend of Kessler Dr. does not match the plans prepared by Engineering Solutions in any way. It is not clear whether this will affect other aspects of the Final Development Plan.
Corrective Action Required
07/13/2017

The Engineer's Estimate of Probable Construction Costs dated July 5, 2017 should be broken down with sufficient detail, rather than lump sum costs for each item. For instance, storm sewer should be broken down with a "per linear ft." cost, for each type of pipe, along with an "extended cost". This should be followed for all other items within the estimate.
Fire Review Approved with Conditions 01/10/2017 06/13/2017
Jim Eden
Misc.
Corrective Action Required
06/13/2017

Revised plans to remove the exterior stairs on the north side of Building #9. Revised plans are approved.
Traffic Review No Comments 04/06/2017 04/24/2017
Michael Park
Planning Review Approved with Conditions 04/06/2017 04/12/2017
Jennifer Thompson
Fire Review Approved with Conditions 04/06/2017 04/04/2017
Jim Eden
Code Statement
Corrective Action Required
03/30/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Engineering Review Corrections 04/06/2017 04/03/2017
Gene Williams, P.E.
Corrective Action Required
04/03/2017

Please refer to comment #3 of the applicant letter dated Jan. 17, 2017. The grading along Kessler Drive should follow what is shown on the approved engineering plans for Kessler Drive. The plans for Kessler Drive, however, are not yet approved and the City is awaiting a resubmittal of these plans. In general, there were comments related to excessive slope in certain areas, and it will likely have an affect on the grading and placement of infrastrucfure on this site to the extent that the Final Development Plan will change. For the moment, this item will remain unresolved until such time the Kessler Road plans are approvable.
Traffic Review No Comments 02/09/2017 02/14/2017
Chris Hughey
Corrective Action Required
02/14/2017

No comments on the FDP. However, the FDP should be reviewed in consideration of comments provided regarding the street design for any conflicts.
Fire Review Approved with Conditions 02/09/2017 02/14/2017
Jim Eden
Code Statement
Corrective Action Required
02/14/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Planning Review Corrections 02/09/2017 02/13/2017
Jennifer Thompson
Corrective Action Required
02/13/2017

Provide the color palette for the proposed apartments, clubhouse, garages, maintenance building, and trash enclosures.
Corrective Action Required
02/13/2017

Revise the street name on Sheet 9, SW Kessler Drive is misspelled.
Corrective Action Required
02/13/2017

FYI. The developer shall execute a mutually satisfactory development agreement with the City, which addresses, at a minimum, the required public improvements listed in the TIA dated September 22, 2016, sanitary sewer improvements, and waterline improvements. No building permit shall be issued for any structure in the development until written proof is provided to the City that the development agreement has been recorded in the Jackson County Recorders' Office. All public improvements shall be substantially complete prior to issuance of any building permit within the proposed preliminary plat except where the timing of improvements are specifically noted in the description of condition.
Corrective Action Required
02/13/2017

FYI. A final plat shall be reviewed, approved and recorded with the Jackson County Recorder of Deeds prior to the issuance of a building permit.
Corrective Action Required
02/13/2017

FYI. The development shall be subject to the recommendation of the Transportation Impact Analysis report dated September 22, 2016.
Corrective Action Required
02/13/2017

FYI. Off-site easements shall be secured and executed prior to the issuance of a building permit.
Corrective Action Required
02/13/2017

Ref: PL2016223 Upon review of the sanitary sewer plans included in your FDP submittal I believe the 8” common lines may be undersized based on estimated Drainage Fixture Units. Please request from the design professionals a detailed sewer piping plan that includes Drainage Fixture Units for each unit per 2012 IPC Table 709.1 as well as all pipe sizes per Table 710.1(1). In lieu of this prescriptive design method, we would accept an Engineered Systems report based on the provisions of 2012 IPC Sections 316 and 714.
Engineering Review Corrections 02/09/2017 02/09/2017
Gene Williams, P.E.
Corrective Action Required
02/09/2017

Please refer to comment #3 of the applicant letter dated Jan. 17, 2017. The grading along Kessler Drive should follow what is shown on the approved engineering plans for Kessler Drive. The plans for Kessler Drive, however, are not yet approved and the City is awaiting a resubmittal of these plans. In general, there were comments related to excessive slope in certain areas, and it will likely have an affect on the grading and placement of infrastrucfure on this site to the extent that the Final Development Plan will change. For the moment, this item will remain unresolved until such time the Kessler Road plans are approvable.
Corrective Action Required
02/09/2017

One of the smaller private sanitary sewer laterals are shown with a "direct-connect" to a manhole in the northeast portion of the project. The only instance where this would be allowed is the case where larger (i.e., manhole-to-manhole) system is installed, which is the case in the majority of this system. This single instance in the northeast corner of the project, however, is not allowed. Please revise the plan to show a cut-in wye connection a minimum of 4 feet beyond the manhole.
Corrective Action Required
02/09/2017

Off-Site easements for sanitary sewer will be required prior to approval of the Final Development Plan.
Corrective Action Required
02/09/2017

Approval of the off-site public water line and off-site traffic improvements, on-site public water line, on-site sanitary sewer line, and on-site street and stormwater plans for Village at View High will be required prior to approval of the Final Development Plan.
Traffic Review No Comments 01/10/2017 01/12/2017
Chris Hughey
Corrective Action Required
01/12/2017

No comments on the FDP. However, the FDP should be reviewed in consideration of comments provided regarding the street design for any conflicts.
Fire Review Corrections 01/10/2017 01/11/2017
Jim Eden
Code Statement
Corrective Action Required
01/11/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
FDC
Corrective Action Required
01/11/2017

IFC 903.3.7- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: Provide a hydrant for buildings 6 and 8 that meet this requirement. Remove the second FDC shown on building 14.
Fire Lanes - Marking
Corrective Action Required
01/11/2017

IFC 503.3- Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. -------------------------------------- IFC 506.1 -Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official.506.1.1 Locks.An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required: Areas in front of buildings, fire hydrants, FDC's, and other required fire lanes shall be posted.
Water Supply
Corrective Action Required
01/11/2017

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required: Water main size for the sprinkler system(s) shall be determined by water flow requirents for the sprinkler system. Confirm with designer.
Engineering Review Corrections 01/10/2017 01/10/2017
Gene Williams, P.E.
Corrective Action Required
01/10/2017

A gate valve should be shown prior to the backflow vault. The backflow vault should be placed outside any public easement or right of way, preferably within five (5) feet of the right of way or easement line. It appears that the backflow vaults may be encroaching upon the easement, and it does not appear that a valve was provided prior to the vault.
Corrective Action Required
01/10/2017

There appears to be confusion on the pavement requirements for drive aisles versus parking stalls. The Unified Development Ordinance (UDO) Article 12 "Parking" does not differentiate between parking stalls and driving aisles (i.e., the pavement section is the same for both), but does differentiate between emergency access and freight access. Please see the UDO for specific requirements for each, and show the location of the emergency access on the site plan.
Corrective Action Required
01/10/2017

Please refer to the comments related to the street plans for Kessler Drive. The comments would, in particular, relate to the grading shown on Sheet 11 in the vicinity of Kessler Drive.
Corrective Action Required
01/10/2017

All Sheets Related to Sanitary Sewer: An overall plan view (i.e., on one sheet) should be provided showing the scope of the interior sanitary sewer lines in plan view. It is difficult to obtain a clear reference to the individual plan and profile sheets without an overall plan view of the system.
Corrective Action Required
01/10/2017

All Sheets Related to the Sanitary Sewer: Please label all of the interior sanitary sewer lines as "PRIVATE".
Corrective Action Required
01/10/2017

Sanitary Sewer Service Plan Sheets: Have the pipe sizes been reviewed by the Codes Division to ensure they are of sufficient size and slope to comply with the building code?
Corrective Action Required
01/10/2017

Water Line Plans: An overall plan view (i.e., on one sheet) should be provided to show the scope of the fire line.
Corrective Action Required
01/10/2017

All Sheets Related to the Fire Line: Please provide sufficient notes denoting the fire line as "PRIVATE".
Corrective Action Required
01/10/2017

Fire Line Plans: Is there a particular reason that ductile iron pipe is being specified? The City would encourage the use of C-900 wherever possible.
Corrective Action Required
01/10/2017

There are numerous references to a "blow off assembly". The City does not allow blow-off assemblies, so it is unclear what this is referencing.
Corrective Action Required
01/10/2017

All Sheets Related to Storm Sewer Plan and Profile: Please provide an overall site plan showing the storm sewer.
Corrective Action Required
01/10/2017

All Sheets Related to Storm Sewer: Please provide the hydraulic grade line for the design storm on the profile views.
Corrective Action Required
01/10/2017

All Sheets Related to Storm Sewer: Please provide sufficient notation denoting the system as "PRVIATE".
Corrective Action Required
01/10/2017

Sheet 26: The pipe from point 8 to point 9 is shown with a slope of 13%. The velocity for the design storm is shown as 34 ft/sec. This is over 50% higher than allowed by the Design and Construction Manual. In addition, there is no provision for sufficient energy dissipation at the end of the flared end section, and this area will likely experience severe erosion issues.
Corrective Action Required
01/10/2017

Sheet 29: The same comment (above) would apply to the pipe segment between point 107 and 108.
Corrective Action Required
01/10/2017

Standard Details: It appears the following were missing from the standard details: 1) storm inlet structures, 2) toe wall details, 3) fire hydrant details, 4) valve box details, 5) curb and gutter details, including the requirement that the area one (1) foot beyond the back of curb include either flyash stabilized subgrade or geogrid, and aggregate, 6) manhole details, 7) backflow vault and backflow assembly details, 8) ADA-accessible ramps at specific locations, 9) sidewalk typical sections with cross-slope no greater than 1.5%.
Corrective Action Required
01/10/2017

The typical section for pavement includes the note "stabilized subgrade". We want to make you aware that geogrid can be used in lieu of flyash stabilized subgrade.
Corrective Action Required
01/10/2017

A specific design will be required for the 3" water meter vault(s). This is not a standard size meter vault.
Corrective Action Required
01/10/2017

Sheet 37 and 38: Please increase the size of the plan view. It is difficult to read in full size view, and will be impossible to read at half size scale.
Corrective Action Required
01/10/2017

It does not appear there is any mention of the use of turf reinforcement mat anywhere on the project. Would this be warranted based on the excessive slope?
Corrective Action Required
01/10/2017

General Comments Concerning Retaining Walls: The geogrid should not extend into any easement.
Corrective Action Required
01/10/2017

Commercial entrances should be specified as 8" KCMMB mix concrete from the right of way line to the sawcut in the public portion of the pavement.
Corrective Action Required
01/10/2017

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and calculated at 3% of the total site work. Items to include in the estimate would include: 1) water lines and valves, 2) thrust blocks and fittings, 3) valve boxes, covers, 4) sanitary sewer lines and connections to the main, 5) sanitary sewer manholes, 6) storm lines greater than 6 inches in diameter, 7) storm structures, including inlets, flared end sections, energy dissipation measures, 8) rip rap if used, 9) turf reinforcement mat, 10) grading to establish proper drainage, 11) grading for parking lots, 12) compaction of subgrade, 13) subgrade stabilization or geogrid, including the area one (1) foot beyond the back of curb, 14) aggregate base, including the area one (1) foot beyond the back of curb, 15) 8" thick KCMMB approaches, 16) ADA-accessible ramps, 17) pavement, 18) curb and gutter, 19) public sidewalk, 20) erosion and sediment control devices and measures installed to conform to the erosion and sediment control plan, 21) final restoration, including sodding, seeding, fertilizer, mulch, and topsoil, and 22) any other item(s) necessary to complete the site work.
Planning Review Corrections 01/10/2017 01/09/2017
Jennifer Thompson
Corrective Action Required
01/09/2017

The developer shall execute a mutually satisfactory development agreement with the City, which addresses, at a minimum, the required public improvements listed in the TIA dated September 22, 2016, sanitary sewer improvements, and waterline improvements. No building permit shall be issued for any structure in the development until written proof is provided to the City that the development agreement has been recorded in the Jackson County Recorders’ Office. All public improvements shall be substantially complete prior to issuance of any building permit within the proposed preliminary plat except where the timing of improvements are specifically noted in the description of condition.
Corrective Action Required
01/09/2017

A final plat shall be reviewed, approved and recorded with the Jackson County Recorder of Deeds prior to the issuance of a building permit.
Corrective Action Required
01/09/2017

Sign permits shall be obtained prior to installation of any signs through the Department of Planning and Codes Administration. All signs proposed must comply with the sign requirements as outlined in the sign section of the UDO. It appears the monument sign located along the corner of SW View High Drive and SW Kessler Drive is within the 25' Gas Easement that runs parallel to SW View High Drive, please shift the sign out of the easement.
Corrective Action Required
01/09/2017

The development shall be subject to the recommendations of the Transportation Impact Analysis report dated September 22, 2016.
Corrective Action Required
01/09/2017

Off-site easements shall be secured and executed prior to the issuance of a building permit.
Corrective Action Required
01/10/2017

Addressing. See the accompanying sheet for building addressing.
Corrective Action Required
01/10/2017

Sidewalks along SW View High Drive, SW Kessler Drive, and SW Village Park Drive shall be constructed as part of the apartment development. On Sheets 06 and 09, remove the sidewalk by others label as this is required to be installed during the apartment construction.
Corrective Action Required
01/10/2017

Within the site data table (Sheet 04), remove the "proposed" zoning label as this site has already been rezoned to the PMIX zoning district.
Corrective Action Required
01/10/2017

On Sheets 05-09, the parking space dimension appears to be about 15' from back of curb. The minimum depth for a parking space (adjacent to a 6-foot sidewalk), is 17', please revise.
Corrective Action Required
01/10/2017

Provide the color palette for the proposed apartments, clubhouse, garages, maintenance building, and trash enclosures.
Corrective Action Required
01/10/2017

The detached garage elevations need to incorporate 4-sided architecture. The rear elevation is shown as 100% fiber cement panels. Please incorporate some additional architectural features to break up this space.
Corrective Action Required
01/10/2017

Several of the proposed retaining walls will require submission of engineered drawings and additional building permit review.
Corrective Action Required
01/10/2017

The proposed retaining walls along View High Drive appear to either be in the 25-gas utility easement or very close. The proposed geogrid needed for a portion of this wall will encroach into this easement. Please provide approval verification from the Gas company that this is permissible and or shift the wall further to the east. In addition it appears the retaining wall located in the southeast corner is encroaching to the 15' UE depending if geogrid is needed within the easement.
Corrective Action Required
01/10/2017

The proposed trees along SW View High Drive are within the 25' Gas Easement. Please revise the landscape sheet to indicate these trees are of an ornamental variety rather than a Lacebark Elm.
Corrective Action Required
01/10/2017

During the site inspection and prior to the issuance of an occupancy permit for this site, staff will determine if additional shrubs or other landscaping is needed within the tree preservation area (to fill in gaps for this high impact buffer area).
Corrective Action Required
01/10/2017

Label the street names for all streets on Sheet LS1.
Corrective Action Required
01/10/2017

Please provide a phasing plan for the apartment development.
Corrective Action Required
01/10/2017

The accessible sign detail references additional model types. Please reference the R7-8 model only (white background and green border), this includes the van accessible portion, where applicable. Also, revise the mounting height to show a minimum of 3' and max of 5' above grade, measured to the bottom of the R7-8 sign.
Corrective Action Required
01/10/2017

When resubmitting, we do not need Sheets A1 thru A14.
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $1,000.00 $1,000.00 Paid 12/22/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home