PL2015068
Summit Innovation Center Public Sanitary Sewer Extension
Engineering Plan Review
Engineering Plan Review
Approved
05/04/2015
TOWNSEND SUMMIT LLC
Locations
Contacts
Not shown for privacy reasons.
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 06/24/2015 06/24/2015
Gene Williams, P.E.
Engineering Review Corrections 06/15/2015 06/15/2015
Gene Williams, P.E.
Corrective Action Required
06/15/2015

In our previous comment letter, it was noted that slope of the sanitary lines were suspect. One of the sanitary sewer lines (i.e., 8 inch) is still shown with a slope of 0.50%. The minimum is 0.60%, although a greater slope is recommended to allow for construction tolerance.
Corrective Action Required
06/15/2015

Please see comment #7 in our previous comment letter. This manhole and sewer line is still too deep. It appears that manhole C2 is now re-named as C3, and perhaps that is why the comment was overlooked.
Corrective Action Required
06/15/2015

Please see comment #11 in our previous comment letter. The water line is shown too close to the sanitary sewer line, and neither the City nor the MDNR will allow it.
Corrective Action Required
06/15/2015

Please show and label all existing and proposed easements. This was requested in comment #3 of our previous comment letter.
Engineering Review Corrections 05/26/2015 05/26/2015
Gene Williams, P.E.
Corrective Action Required
05/26/2015

Please provide a separate plan set for the sanitary sewer.
Corrective Action Required
05/26/2015

Please provide an overview sheet showing the location of the sanitary sewer on one sheet.
Corrective Action Required
05/26/2015

Please show the location of all existing and all future easements.
Corrective Action Required
05/26/2015

Please label the existing City sanitary sewer manholes with the City manhole number.
Corrective Action Required
05/26/2015

Please label all road names.
Corrective Action Required
05/26/2015

Sheet C404: Sanitary sewer line C is shown with 0.6% slope. This is the minimum slope, and should be specified with perhaps 0.7% to account for installation tolerance. The City cannot accept any sanitary sewer less than the minimum.
Corrective Action Required
05/26/2015

Sheet C404: Manhole C2 is shown with approximately 16 feet of cover. This is greater than allowed by the Design and Construction Manual (i.e., 15 feet maximum).
Corrective Action Required
05/26/2015

There are several instances where the 12" sanitary sewer line is shown with the minimum 0.40% slope. Please use a higher number to allow for tolerance in installation since the City will not accept any sanitary sewer less than the minimum slope (e.g. 0.39% will not be acceptable).
Corrective Action Required
05/26/2015

Is there a reason that the water line is not shown "grayed out" in the background? Please consider adding the water line layer in the background.
Corrective Action Required
05/26/2015

Please move manhole A3 outside the limits of the future sidewalk.
Corrective Action Required
05/26/2015

It appears a portion of the public water line along Innovation Parkway is on the same side of the road as the sanitary sewer. If this is the case, then a minimum separation of ten (10) feet must be maintained as measured from the outside of the pipe, and five (5) feet from any storm sewer.
Corrective Action Required
05/26/2015

Corrective Action Required
05/26/2015

Is there a reason that north is pointing downward on many of the plan sheets?
Corrective Action Required
05/26/2015

Standard details will need to be included within the plan set for the sanitary sewer. This is due to MDNR requirements for a stamped set of details.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
05/26/2015 Letter PW-Comment Letter (Engineering Plans)
06/15/2015 Letter PW-Comment Letter (Engineering Plans)
08/04/2015 Letter PW-Engineering Approval Letter
11/02/2017 Activity Document Fee WorksheetSanitary
11/02/2017 Activity Document MDNR Concurrence Letter Sanitary
11/02/2017 Activity Document MDNR Concurrence Letter Sanitary.doc
11/02/2017 Activity Document Summit-Innovation-Ctr_SS-waiver_2015-09-01(s)
11/02/2017 Activity Document SummitInnovatonCenterCenterWaiver09_01_2015
07/11/2023 Summit Innovation Center Sanitary Design Waiver Denial Signed
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home