Review Type |
Outcome |
Est. Completion Date |
Completed |
Fire Review
|
No Comments
|
|
11/25/2013
|
|
Jim Eden
|
|
Misc.
Corrective Action Required
The bacflow valve on the 8 inch water main should be an 8 inch BFV and not a 6 inch as previously shown. The revised plan does not show any dimension other than the comment "per Lee's Summit standard detail".
|
|
Misc.
Corrective Action Required
Alteration of the hydrant system shall cause minimal impairment of the fire protection system and shall be coordinated through the fire department.
|
|
|
Planning Review
|
No Comments
|
03/27/2013
|
04/12/2013
|
|
Hector Soto Jr.
|
|
|
Engineering Review
|
Approved with Conditions
|
03/27/2013
|
04/02/2013
|
|
Gene Williams, P.E.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $33,519.04 (which is based on 3% of the total infrastructure cost plus a water test inspection fee) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Department.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
|
|
DE Contact ROW Inspector
Corrective Action Required
Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
PW Public Improvements TIFF CD's (DELETE)
Corrective Action Required
Any public improvements will require two (2) CD ROMs with the plans in TIFF format.
|
|
PW Submit Land Disturbance (DELETE)
Corrective Action Required
Submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities that are to occur prior to obtaining a building permit from the Codes Department. Approval of these plans does not constitute approval of the erosion control plan. Contact Barton Reese at (816) 969-1800 for new land disturbance permitting details.
|
|
|
Traffic Review
|
No Comments
|
03/27/2013
|
03/25/2013
|
|
Michael Park
|
|
|
Fire Review
|
Approved with Conditions
|
03/27/2013
|
03/22/2013
|
|
Jim Eden
|
|
Misc.
Corrective Action Required
The bacflow valve on the 8 inch water main should be an 8 inch BFV and not a 6 inch as previously shown. The revised plan does not show any dimension other than the comment "per Lee's Summit standard detail".
|
|
Misc.
Corrective Action Required
Alteration of the hydrant system shall cause minimal impairment of the fire protection system and shall be coordinated through the fire department.
|
|
|
Planning Review
|
Corrections
|
02/28/2013
|
02/28/2013
|
|
Hector Soto Jr.
|
|
Corrective Action Required
EASEMENTS. Show the location of easments so as to determine the need for any vacation of easement. Of concern is the possible encroachment of the proposed retaining wall into a utility easement. Additionally, two future directional signs are shown on Sheet A1 that may be located within the same or different utility easement.
|
|
Corrective Action Required
SIGNAGE. For the purpose of clarification, approval of the final development plan does not constitute approval of the retaining wall sign and two directional signs called out on Sheet A1. Approval of these signs, and the comprehensive signage program for the hospital campus presented to the City by Forcade Associates via separate communication, require approval by the Planning Commission via separate application.
|
|
|
Engineering Review
|
Corrections
|
02/28/2013
|
02/28/2013
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
General note 4 on Sheet C0.0 must be changed to read "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813."
|
|
Corrective Action Required
It appears that the water line layout is not what was discussed with David Lohe, Water Utilities laison. Please revise the layout as discussed with David Lohe.
|
|
Corrective Action Required
The backflow vault will need to be placed closer to Douglas St. In general, the backflow vault should be placed within 5 feet of the easement or right of way line on the private side. A restrained valve should be installed upstream of the vault, and this valve denotes the beginning of the public water line.
|
|
Corrective Action Required
All water lines should be clearly labeled as private as appropriate.
|
|
Corrective Action Required
The 10 and 100 year hydraulic grade lines must be shown on the profile views of the storm lines.
|
|
Corrective Action Required
It did not appear that a typical section was included in the plan set for the pavement. Please see the Unified Development Ordinance Article 12 for parking lot thickness and base requirements, and please provide a typical section for each.
|
|
|
Fire Review
|
Corrections
|
02/28/2013
|
02/27/2013
|
|
Jim Eden
|
|
Misc.
Corrective Action Required
The bacflow valve on the 8 inch water main should be an 8 inch BFV and not a 6 inch as shown.
|
|
Misc.
All fire hydrants located after the BFV are private and shall be painted yellow with a silver bonnet.
|
|
|
Traffic Review
|
No Comments
|
02/28/2013
|
02/22/2013
|
|
Michael Park
|
|
|